ECB08/06/2001WORK WITHOUT PERMIT: UPON INSPECTION OF ABOVE PROPERTY ALTERTION WORK WAS IN PROGRESS. LOLLY COLUMUS WERE INSTALLED ON STEEL BEAMS TO SUPPORT WOOD JOIST & STRUCTURE OF HOME. ALSO PARTITION WORK WAS IN PROGRESSNothing owed — awaiting certificate of correction
ECB08/06/2001WORK WITHOUT PLUMBING PERMIT: AT THE TIME OF INSPECTION AT ABOVE ADDRESS PLUMBING WORK WAS BEING INSTALLED WITHOUT A MASTER LICENSED PLUMBING OBTAINING A NECESSARY PERMIT. WAISTED PIPING WAS BEING INSTALLEDNothing owed — awaiting certificate of correction
ECB08/06/2001D.O.T. PERMIT NOT POSTED UPON INPSECTION OF ABOVE ADDRESS ALTERED WORK WAS IN PROGRESS. CONTAINER DUMPSTER WAS PLACE ON STREET IN FRONT OF 1963 W 6 ST AND NI D.O.T. PERMIT WAS POSTEDNothing owed — awaiting certificate of correction
Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.