Walk-up cooperative
1966 UNIVERSITY AVENUE
💬 Discuss this project
1914Year Built
5Stories
C6Building Class
R7-1Zoning
17,100 sfGross Floor Area
11Units
Rent Stabilized1 Open Violation ▸
Walk-up cooperative · Owner of record: DREAMYARD TPT MORRIS HOUSING DEVELOPMENT FUND CORP · 7,299 sf lot · 2.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction154p · 2 filings · 20 docs
Floor 5Under Construction144p · 2 filings · 20 docs
Floor 4Under Construction143p · 2 filings · 20 docs
Floor 3Under Construction143p · 2 filings · 20 docs
Floor 2Under Construction144p · 2 filings · 20 docs
Floor 1Under Construction149p · 2 filings · 20 docs
CellarUnder Construction32p · 1 filing · 20 docs
BasementUnder Construction120p · 2 filings · 20 docs
Site & exterior9p · 4 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEIGHBORHOOD RESTORE2207/08/2026
MNK ENTERPRISES NY INC703/22/2026
CELTIC SERVICES NYC INC503/22/2026
HOME BUILDERS 1 L.P503/22/2026
PLATINUM SERVICES NY503/22/2026
DREAMYARD TPT MORRIS HOUSING DEVELOPMENT FUND CORP103/22/2026
TPT MORRIS LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO203/21/2026
RPO3803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HOME BUILDERS 1 L.PGeneral Contractor1307/08/2026
CELTIC SERVICES NYC INCGeneral Contractor303/21/2026
M. EARLY PLBG & HTG CORPFire Protection307/08/2026
MNK ENTERPRISES NY INCGeneral Contractor303/21/2026
PLATINUM SERVICES NY LLCGeneral Contractor303/21/2026
M. EARLY PLBG & HTG CORPPlumbing307/08/2026
ACCORD POWER INCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SANTORIELLO ARCHITECTS8577605/19/2026
SKYLINE ENGINEERING, PLLC2671204/14/2025
SYNERGIC DESIGN LLC8561108/21/2024
Building Lifecycle
All (170)Filed (25)Permit Issued (17)Signed Off (10)Violation (60)Inspection (10)Objection (18)Special Inspection (30)
07/23/2026
Signed off — Alteration CO
INSTALLATION OF TWO NEW BOILERS.
X00776026-I1
06/16/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/10/2026
Objection resolved — Addressed
06/05/2026
Objection raised — Other
05/19/2026
Filed — Alteration CO
INSTALLATION OF TWO NEW BOILERS.
X00776026-A7
03/18/2026
Signed off — Alteration
X01302182-I1
02/25/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
02/05/2026
Filed — Alteration CO
INSTALLATION OF TWO NEW BOILERS.
X00776026-A6
01/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Robert Santoriello
01/29/2026
Special inspection requirement — Fenestration air leakage
Justin Moses
01/29/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Justin Moses
01/29/2026
Special inspection requirement — Insulation placement and R values
Justin Moses
01/29/2026
Special inspection requirement — Lighting in dwelling units
Justin Moses
01/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
Robert Santoriello
01/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Santoriello
01/29/2026
Special inspection requirement — Maintenance information
Justin Moses
01/29/2026
Special inspection requirement — Lighting controls
Justin Moses
01/29/2026
Special inspection requirement — Permanent certificate
Justin Moses
01/29/2026
Special inspection requirement — Interior lighting power
Justin Moses
01/29/2026
Special inspection requirement — Masonry
Robert Santoriello
11/17/2025
Permit issued — General Construction
X01302182-I1-GC
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/10/2025
Signed off — Alteration CO
INSTALLATION OF TWO NEW BOILERS.
X00776026-S2
11/03/2025
Filed — Alteration
X01302182-I1
08/25/2025
Signed off — Alteration CO
INSTALLATION OF TWO NEW BOILERS.
X00776026-S3
08/21/2025
Signed off — Alteration CO
INSTALLATION OF TWO NEW BOILERS.
X00776026-S1
07/20/2025
Violation issued (HPD, closed)
C
07/14/2025
Permit issued — Plumbing
X00776026-S2-EW-SP
06/05/2025
Violation issued (HPD, closed)
A
06/04/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/03/2025
Signed off — Alteration
Filing for construction fence in conjunction with Alt-CO job X00776026-I1.
X00979039-I1
04/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
Justin Moses
04/21/2025
Special inspection requirement — Heating Systems
Matthew Wavro
04/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Justin Moses
04/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
Justin Moses
04/21/2025
Special inspection requirement — Maintenance information
Justin Moses
04/14/2025
Filed — Alteration CO
INSTALLATION OF TWO NEW BOILERS.
X00776026-A5
04/11/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X01041840-I1
04/09/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Justin Moses
04/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
Justin Moses
04/09/2025
Special inspection requirement — Heating Systems
Matthew Wavro
04/09/2025
Special inspection requirement — Maintenance information
Justin Moses
04/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
Justin Moses
04/03/2025
Special inspection requirement — Maintenance information
Justin Moses
04/03/2025
Special inspection requirement — Heating Systems
Matthew Wavro
04/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
Justin Moses
04/03/2025
Special inspection requirement — Mechanical Systems
Matthew Wavro
04/03/2025
Special inspection requirement — Final
Matthew Wavro
04/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Justin Moses
04/03/2025
Special inspection requirement — Shutoff dampers
Justin Moses
04/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
Justin Moses
03/31/2025
Signed off — Alteration
Installation of 21.8 kw solar energy system on roof. No change of occupancy, use or egress.
X01096372-I1
03/25/2025
Filed — Alteration CO
INSTALLATION OF TWO NEW BOILERS.
X00776026-P9
03/24/2025
Filed — Alteration CO
INSTALLATION OF TWO NEW BOILERS.
X00776026-A3
03/24/2025
Filed — Alteration CO
INSTALLATION OF TWO NEW BOILERS.
X00776026-A4
03/13/2025
Filed — Alteration CO
INSTALLATION OF TWO NEW BOILERS.
X00776026-A1
02/28/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/10/2025
Permit issued — Plumbing
X00776026-S2-PL
02/07/2025
Permit issued — Mechanical Systems
X00776026-S1-MS
Latest 60 of 170 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHOME BUILDERS 1 L.P11/17/2025
DOB NOWPlumbingSigned-offM. EARLY PLBG & HTG CORP07/14/2025
DOB NOWPlumbingSigned-offM. EARLY PLBG & HTG CORP02/10/2025
DOB NOWMechanical SystemsSigned-offHOME BUILDERS 1 L.P02/07/2025
DOB NOWConstruction FenceSigned-offHOME BUILDERS 1 L.P02/03/2025
DOB NOWGeneral ConstructionPermit IssuedHOME BUILDERS 1 L.P01/09/2025
DOB NOWSolarSigned-offACCORD POWER INC10/29/2024
DOB NOWPlumbingSigned-offM. EARLY PLBG & HTG CORP06/27/2024
DOB NOWBoiler EquipmentSigned-offM. EARLY PLBG & HTG CORP06/21/2024
DOB NOWSupported ScaffoldSigned-offMNK ENTERPRISES NY INC04/25/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC03/06/2024
DOB NOWConstruction FenceSigned-offHOME BUILDERS 1 L.P02/26/2024
DOB NOWSprinklersSigned-offM. EARLY PLBG & HTG CORP02/20/2024
DOB NOWPlumbingSigned-offM. EARLY PLBG & HTG CORP02/20/2024
DOB NOWGeneral ConstructionPermit IssuedHOME BUILDERS 1 L.P02/14/2024
DOB NOWMechanical SystemsSigned-offHOME BUILDERS 1 L.P02/14/2024
DOB NOWProtection and Mechanical MethodsSigned-offCELTIC SERVICES NYC INC01/25/2024
1 project · most recent 05/19/2026
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/19/2026Signed-offHOME BUILDERS 1 L.PHeating Systems, Ventilation Systems
Heating
Sterling Sterling 30,200 BTU ×6
Ventilation
N/A N/A 1 BTU · Ductwork ×1
1 project · most recent 05/19/2026
Sprinkler System
FiledStatusContractorScope
05/19/2026Signed-offM. EARLY PLBG & HTG CORPSprinkler System
1 project · most recent 05/19/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/19/2026Signed-offM. EARLY PLBG & HTG CORPGas, Storm, Water/Sanitary
8 projects · most recent 12/15/2025
General Wiring Boiler Controls
FiledStatusContractorScope
12/15/2025CompleteTRIBORO ELEC'L CONTR'G COGeneral Wiring
10/16/2025CompleteTRIBORO ELEC'L CONTR'G COGeneral Wiring
06/16/2025CompleteTRIBORO ELEC'L CONTR'G COBoiler Controls
08/19/2024CompletePOWER SURGE ELECTRIC, INC—
02/08/2024CompleteILLUMINOUS ELECTRIC CORP.General Wiring
01/29/2024CompleteTRIBORO ELEC'L CONTR'G COGeneral Wiring
01/29/2024CompleteTRIBORO ELEC'L CONTR'G CO—
01/20/2021CompletePJZ MAINTENANCE CORP.Boiler Controls
1 project · most recent 05/19/2026
FiledStatusContractorScope
05/19/2026Signed-offM. EARLY PLBG & HTG CORP2 scope_items
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
06/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/25/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
06/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/09/2025Pass-Final Boiler Equipment InspectionPassView ↗
02/28/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/06/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
02/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/27/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 84
DateRequirementInspectorRole
01/29/2026Lighting controlsJustin Mosesenergy_progress
01/29/2026MasonryRobert Santoriellospecial
01/29/2026Structural Stability – Alterations of existing buildingsRobert Santoriellospecial
01/29/2026Fire-Resistance Rated ConstructionRobert Santorielloprogress
01/29/2026Fenestration air leakageJustin Mosesenergy_progress
01/29/2026Insulation placement and R valuesJustin Mosesenergy_progress
01/29/2026Permanent certificateJustin Mosesenergy_progress
01/29/2026Fenestration and door U-factor and product ratingsJustin Mosesenergy_progress
01/29/2026Lighting in dwelling unitsJustin Mosesenergy_progress
01/29/2026Interior lighting powerJustin Mosesenergy_progress
01/29/2026Maintenance informationJustin Mosesenergy_progress
01/29/2026Fire-Resistant Penetrations and JointsRobert Santoriellospecial
04/21/2025Heating SystemsMatthew Wavrospecial
04/21/2025HVAC-R and service water piping design and insulationJustin Mosesenergy_progress
04/21/2025HVAC-R and service water heating equipmentJustin Mosesenergy_progress
04/21/2025HVAC-R and service water heating system controlsJustin Mosesenergy_progress
04/21/2025Maintenance informationJustin Mosesenergy_progress
04/09/2025Heating SystemsMatthew Wavrospecial
04/09/2025Maintenance informationJustin Mosesenergy_progress
04/09/2025HVAC-R and service water piping design and insulationJustin Mosesenergy_progress
04/09/2025HVAC-R and service water heating system controlsJustin Mosesenergy_progress
04/09/2025HVAC-R and service water heating equipmentJustin Mosesenergy_progress
04/03/2025Shutoff dampersJustin Mosesenergy_progress
04/03/2025Heating SystemsMatthew Wavrospecial
04/03/2025Mechanical SystemsMatthew Wavrospecial
Latest 25 of 84.
▾Documents — 120 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch25
08/21/2026X00993620-I1Request digital key ↗
08/21/2026X00979039-I1Request digital key ↗
08/21/2026X00993871-I1Request digital key ↗
Showing 3 of 25 on file for this type
▸Seals & Professional Certifications67
▸DOB NOWDPL-1: Design Professional Seal & Signature25
08/21/2026X00993620-I1Open ↗
08/21/2026X00979039-I1Open ↗
08/21/2026X00993871-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/23/2026X00776026-S3Open ↗
09/02/2026X00776026-A5Open ↗
09/01/2026X01096372-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/23/2026X00776026-S3Open ↗
09/23/2026X00776026-S3Open ↗
09/02/2026X00776026-A5Open ↗
Showing 3 of 20 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/16/2026X00776026-S3Open ↗
08/16/2026X00776026-I1Open ↗
08/16/2026X00776026-S2Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026X00776026-S1Open ↗
08/13/2026X00776026-S3Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00776026-I1Open ↗
▸Approvals, Objections & Sign-offs18
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter17
08/18/2026X01302182-I1Open ↗
08/16/2026X00776026-A7Open ↗
08/13/2026X00776026-A4Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01096372-I1Open ↗
▸Filing & Intake Forms3
▸DOB NOWAI1 Form (from plan PDF)3
08/16/2026X00776026-P8Open ↗
08/16/2026X00776026-P8Open ↗
08/16/2026X00776026-P8Open ↗