ECB05/13/2025FAILURE TO OBEY VACATE ORDER FROM THE COMMISSIONER PER 28-207.4. NOTED: AT THE TIME OF INSPECTION APT 1 AT 1ST FLOOR HAS BEEN FULLY REOCCUPIED DESPITE THE ACTIVE VACATE ORDER M70/2019 ISSUED ON 04/16/2019. REME$25K due
HPD02/08/2022§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 3rd STORY
HPD02/08/2022§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 4th STORY
HPD02/08/2022§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 1st STORY
HPD02/08/2022§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 2nd STORY
HPD02/08/2022§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF GARBAGE BINS AT PUBLIC HALL, 2nd STORY
ECB04/16/2019WORK WITHOUT A PERMIT. NOTED: ERECTED FULL HEIGHT PARTITIONS @APT #1 TO CREATE 1 ADDITIONAL BEDROOM. REMEDY: OBTAIN PERMITS.$-30 due
DOB08/30/2010V-DOB VIOLATION - ACTIVE
DOB03/03/2008V-DOB VIOLATION - ACTIVE
ECB09/04/2025NO ACCESS: UNABLE TO GAIN ACCESS INTO VACATED APT 1 AT 1ST FLOOR. SUPER GRANTED ACCESS TO LOBBY. HOWEVER, NO ANSWER TO KNOCKS AT APARTMENT DOOR. NO ANSWER AT INTERCOM OR DOORBELL AT MAIN ENTRY DOOR TO BUILDING.Nothing owed — awaiting certificate of correction
ECB07/21/2021FAILURE TO COMPLY W/COMMISSIONER'S ORDER TO FILE C/C FOR V35417672Y ISSUED4/16/19 PURSUANT TO CODE28204.2 FILE C/CNothing owed — awaiting certificate of correction
ECB03/05/2011FAILURE TO COMPLY W/ THE COMMS ORDER TO FILE A CERT OF CORRECTION W/ THE DOB NOTED RESPONDENT FAILED TO COMPLY W/ THE COMMS ORDER TO CORRECTTHE VIOLATING CONDITIONS & FILE A CERT OF CORRECTION PURSUANT TO 28-20Nothing owed — awaiting certificate of correction
ECB08/25/2010FAIL TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.CELLAR. 1)LATH & PLASTER MISS @ CEILING- MISS FIRE STOPPING. 2)1ST FL JOISTS ROTTED OUT IN VARIOUS LOCATIONS. SUBMIT STRUCTURAL STABILITY REPORT TO NAWEED CHAUDHRINothing owed — awaiting certificate of correction
ECB09/07/2007WORK W/O PERMIT. WORK NOTED: @ SOUTH SIDE OF PREMISES (EXPOSURE # 7) ERECTED 8'CONSTRUCTION WOOD FRAME FENCE APPROX 25'. REMEDY: OBTAIN PERMIT OR RESTORE TO PRIOR LEGAL CONDITIONS.Nothing owed — awaiting certificate of correction