← Back
Miscellaneous one family
1971 54 STREET
BROOKLYN · Mapleton-Midwood (West) · BIN 3130346
💬 Discuss this project
1930Year Built
3Stories
A9Building Class
R5Zoning
2,640 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Miscellaneous one family · 1,603 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Roof14p · 1 filing · 20 docs
Floor 315p · 1 filing · 20 docs
Floor 213p · 1 filing · 20 docs
Floor 113p · 1 filing · 20 docs
Cellar14p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES603/21/2026
BDF DESIGN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GS INTERIORS LLCGeneral Contractor2807/08/2026
QUALITY PIPING, INCFire Protection107/08/2026
NESS MECHANICAL P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING CONSULTING SE2050605/31/2023
Building Lifecycle
All (83)Filed (7)Permit Issued (20)Signed Off (5)Violation (3)Inspection (10)Objection (8)Special Inspection (30)
07/13/2023
Signed off — Alteration
Sprinkler work type hereby filed subsequent to GC job number: B00467681-I1
B00467681-S2
06/06/2023
Signed off — Alteration
Sprinkler work type hereby filed subsequent to GC job number: B00467681-I1
B00467681-S1
06/06/2023
Signed off — Alteration
Sprinkler work type hereby filed subsequent to GC job number: B00467681-I1
B00467681-I1
06/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
06/01/2023
Special inspection requirement — HVAC-R and service water heating system controls
PAUL MARINO
06/01/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PAUL MARINO
06/01/2023
Special inspection requirement — HVAC-R and service water heating equipment
PAUL MARINO
05/31/2023
Filed — Alteration
Sprinkler work type hereby filed subsequent to GC job number: B00467681-I1
B00467681-P1
05/31/2023
Special inspection requirement — HVAC-R and service water heating system controls
PAUL MARINO
05/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
05/31/2023
Special inspection requirement — HVAC-R and service water heating equipment
PAUL MARINO
05/31/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PAUL MARINO
04/26/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/25/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/27/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/22/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/22/2023
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
03/20/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/20/2023
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
03/20/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
03/20/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/25/2023
Signed off — Alteration
B00521528-I1
01/23/2023
Signed off — Alteration
Sprinkler work type hereby filed subsequent to GC job number: B00467681-I1
B00467681-S4
01/23/2023
Permit issued — Support of Excavation
B00467681-S4-SE
12/02/2022
Permit issued — Support of Excavation
B00467681-S4-SE
12/02/2022
Permit issued — Construction Fence
B00521528-I1-FN
12/02/2022
Permit issued — General Construction
B00467681-S3-GC-CX
12/02/2022
Permit issued — General Construction
B00467681-I1-GC
10/03/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/21/2022
Permit issued — Construction Fence
B00521528-I1-FN
09/20/2022
Permit issued — General Construction
B00467681-I1-GC
09/20/2022
Permit issued — Support of Excavation
B00467681-S4-SE
09/20/2022
Permit issued — General Construction
B00467681-S3-GC-CX
08/20/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/20/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/18/2022
Permit issued — General Construction
B00467681-I1-GC
08/18/2022
Permit issued — Structural
B00467681-S3-GC-CX
08/18/2022
Permit issued — Support of Excavation
B00467681-S4-SE
06/29/2022
Violation issued (ECB, closed)
Construction
06/16/2022
Permit issued — Plumbing
B00467681-S2-PL
06/15/2022
Permit issued — Sprinklers
B00467681-S1-EW-SP
03/22/2022
Permit issued — Foundation
B00467681-S3-GC-CX
03/16/2022
Permit issued — General Construction
B00467681-I1-GC
11/03/2021
Permit issued — Structural
B00467681-S3-GC-CX
09/30/2021
Objection resolved — Addressed
09/15/2021
Permit issued — General Construction
B00467681-I1-GC
09/03/2021
Permit issued — Support of Excavation
B00467681-S4-SE
09/02/2021
Permit issued — Construction Fence
B00521528-I1-FN
09/01/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
PAUL MARINO
08/31/2021
Objection raised — Scope
08/10/2021
Filed — Alteration
Sprinkler work type hereby filed subsequent to GC job number: B00467681-I1
B00467681-S4
08/10/2021
Filed — Alteration
Sprinkler work type hereby filed subsequent to GC job number: B00467681-I1
B00467681-S3
08/10/2021
Special inspection requirement — Structural Steel - Details
PAUL MARINO
08/10/2021
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
PAUL MARINO
08/10/2021
Special inspection requirement — Underpinning
PAUL MARINO
08/04/2021
Special inspection requirement — Structural Cold-Formed Steel
PAUL MARINO
08/04/2021
Special inspection requirement — Subgrade Inspections
PAUL MARINO
08/04/2021
Special inspection requirement — Footing and Foundation
PAUL MARINO
08/04/2021
Special inspection requirement — Final
Rizwan Salam
08/04/2021
Special inspection requirement — Concrete - Cast-In-Place
PAUL MARINO
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupport of ExcavationSigned-offGS INTERIORS01/23/2023
DOB NOWSupport of ExcavationSigned-offGS INTERIORS12/02/2022
DOB NOWConstruction FenceSigned-offGS INTERIORS12/02/2022
DOB NOWGeneral ConstructionPermit IssuedGS INTERIORS12/02/2022
DOB NOWGeneral ConstructionSigned-offGS INTERIORS12/02/2022
DOB NOWConstruction FenceSigned-offGS INTERIORS09/21/2022
DOB NOWGeneral ConstructionSigned-offGS INTERIORS09/20/2022
DOB NOWSupport of ExcavationSigned-offGS INTERIORS09/20/2022
DOB NOWGeneral ConstructionPermit IssuedGS INTERIORS09/20/2022
DOB NOWGeneral ConstructionSigned-offGS INTERIORS08/18/2022
DOB NOWStructuralPermit IssuedGS INTERIORS08/18/2022
DOB NOWSupport of ExcavationSigned-offGS INTERIORS08/18/2022
DOB NOWPlumbingSigned-offNESS MECHANICAL P & H INC06/16/2022
DOB NOWSprinklersSigned-offQUALITY PIPING, INC06/15/2022
DOB NOWFoundationPermit IssuedGS INTERIORS03/22/2022
DOB NOWGeneral ConstructionSigned-offGS INTERIORS03/16/2022
DOB NOWStructuralPermit IssuedGS INTERIORS11/03/2021
DOB NOWGeneral ConstructionSigned-offGS INTERIORS09/15/2021
DOB NOWSupport of ExcavationSigned-offGS INTERIORS09/03/2021
DOB NOWConstruction FenceSigned-offGS INTERIORS09/02/2021
BIS—ISSUEDGS INTERIORS LLC08/19/2022
1 project · most recent 05/31/2023
Sprinkler System
FiledStatusContractorScope
05/31/2023Signed-offQUALITY PIPING, INCSprinkler System
1 project · most recent 05/31/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/31/2023Signed-offMELONIK PLBG & HTG CORPGas, Storm, Water/Sanitary
1 project · most recent 08/21/2022
General Wiring
FiledStatusContractorScope
08/21/2022CompleteTHIRD GENERATION ELECTRICGeneral Wiring
1 project · most recent 05/31/2023
Steel Concrete Masonry
FiledStatusContractorScope
05/31/2023Signed-offGS INTERIORS LLCSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/26/2023Pass-Final General Construction Non-Directive 14PassView ↗
04/25/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/27/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/22/2023Fail-Final General Construction Non-Directive 14FailView ↗
03/22/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
03/20/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/20/2023Certified Sprinkler - SP - RoughingCertifiedView ↗
03/20/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
03/20/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/03/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
06/01/2023Fire-Resistant Penetrations and JointsPAUL MARINOspecial
06/01/2023HVAC-R and service water heating system controlsPAUL MARINOenergy_progress
06/01/2023HVAC-R and service water piping design and insulationPAUL MARINOenergy_progress
06/01/2023HVAC-R and service water heating equipmentPAUL MARINOenergy_progress
05/31/2023HVAC-R and service water heating system controlsPAUL MARINOenergy_progress
05/31/2023Fire-Resistant Penetrations and JointsPAUL MARINOspecial
05/31/2023HVAC-R and service water heating equipmentPAUL MARINOenergy_progress
05/31/2023HVAC-R and service water piping design and insulationPAUL MARINOenergy_progress
09/01/2021Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
08/10/2021Structural Steel - DetailsPAUL MARINOspecial
08/10/2021Excavations - Sheeting, Shoring, and BracingPAUL MARINOspecial
08/10/2021UnderpinningPAUL MARINOspecial
08/04/2021Structural Cold-Formed SteelPAUL MARINOspecial
08/04/2021Subgrade InspectionsPAUL MARINOspecial
08/04/2021Footing and FoundationPAUL MARINOprogress
08/04/2021FinalRizwan Salamprogress
08/04/2021Concrete - Cast-In-PlacePAUL MARINOspecial
08/04/2021MasonryPAUL MARINOspecial
06/14/2021Fire-Resistant Penetrations and JointsPAUL MARINOspecial
06/14/2021Sprinkler SystemsPAUL MARINOspecial
02/18/2021Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
02/09/2021Fire-Resistance Rated ConstructionPAUL MARINOprogress
02/09/2021MeteringPAUL MARINOenergy_progress
02/09/2021Fenestration and door U-factor and product ratingsPAUL MARINOenergy_progress
02/09/2021Air barrier — testing PAUL MARINOenergy_progress
Latest 25 of 38.
▾Documents — 109 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
09/01/2026B00521528-I1Request digital key ↗
09/01/2026B00467681-P1Request digital key ↗
09/01/2026B00467681-S4Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
08/15/2026B00467681-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION4
09/13/2023321599980Open ↗
09/08/2023321599980Open ↗
08/26/2022321599980Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/20/2023321599980Open ↗
▸BISWORK PERMIT APPLICATION1
08/22/2022321599980Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00467681-S3Open ↗
08/13/2026B00467681-I1Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
05/12/2021321599980Open ↗
▸BISVERIFY TAX LOT1
01/30/2023321599980Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
05/12/2021321599980Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/23/2023321599980Open ↗
▸BISZONING DIAGRAM1
05/25/2021321599980Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
05/12/2021321599980Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B00467681-I1Open ↗
▸Seals & Professional Certifications45
▸DOB NOWProgress Inspector Seal & Signature22
09/01/2026B00467681-P1Open ↗
09/01/2026B00467681-P1Open ↗
09/01/2026B00467681-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/17/2026B00467681-S1Open ↗
09/17/2026B00467681-S1Open ↗
09/01/2026B00467681-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/01/2026B00467681-S4Open ↗
09/01/2026B00467681-S3Open ↗
09/01/2026B00467681-P1Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B00467681-I1Open ↗
08/13/2026B00467681-S3Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
05/25/2021321599980Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/01/2026B00467681-S4Open ↗
09/01/2026B00467681-P1Open ↗
09/01/2026B00467681-S1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
05/12/2021321599980Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00467681-I1Open ↗
08/13/2026B00467681-S2Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/23/2023321599980Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/23/2023321599980Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY2
05/12/2021321599980Open ↗
05/12/2021321599980Open ↗
▸BISSOIL REPORT1
05/12/2021321599980Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
05/12/2021321599980Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00467681-S3Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00467681-S3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00467681-S3Open ↗
▸Approvals, Objections & Sign-offs3
▸BISSCHEDULE A - OCCUPANCY / USE2
09/13/2023321599980Open ↗
09/08/2023321599980Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/12/2021321599980Open ↗
▸Cost, Insurance & Ownership5
▸DOB NOWCertification by Insurance Broker or Agency2
08/13/2026B00467681-I1Open ↗
08/13/2026B00467681-S3Open ↗
▸DOB NOWCertificate of Insurance2
08/13/2026B00467681-S3Open ↗
08/13/2026B00467681-I1Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
08/22/2022321599980Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION4
09/21/2023321599980Open ↗
09/21/2023321599980Open ↗
09/15/2022321599980Open ↗
Showing 3 of 4 on file for this type
▸Other Documents9
▸DOB NOWPlot Diagram3
08/13/2026B00467681-S3Open ↗
08/13/2026B00467681-S4Open ↗
08/13/2026B00467681-I1Open ↗
▸DOB NOWAdditional Insured Authorizations2
08/13/2026B00467681-S3Open ↗
08/13/2026B00467681-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00467681-I1Open ↗
08/13/2026B00467681-S3Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
05/12/2021321599980Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00467681-S4Open ↗