ECB01/27/20103314.6.8.5.5MISC.VIO.SUPPORT SCAFFOLD DOES NOT CONFORM TO OSHA/DOB SPECIFICATION. NOTE:NOT TIED TO BUILDING GUARDRAILS MISSING.TOE BAORDS MISSING PLANKS NOT TIE DOWN & OVER EXTENDED UNSOUND FOOTING. REMEDY:COMPNothing owed — awaiting certificate of correction
ECB10/07/2009SEC. 3306.5.1;28-104.7.1;1603.1;27-157;27-162. ARCHITECTURAL AND STRUCTURAL PLANS (ALT 320023201, APPROVED 7.24.09) ARE NOT ADEQUATE. THE PLANS ARE NOT COMPLETE AND OF NOT SUFFICIENT CLARITY TO INDICATE ENTIRENothing owed — awaiting certificate of correction
ECB10/07/2009SEC. 1704.19;27-132;RCNY16-01C. FAILURE TO ADEQUATELUY PERFORM SPECIALINSPECTIONS FOR THE STRUCTURAL SAFETY DURING CONSTRUCTION OPERATIONS. AT THE TIME OF INSPECTION BLDG WAS IMPROPERLY SHORED AND INADEQUATENothing owed — awaiting certificate of correction
ECB09/29/2009WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS & AMENDMENTS AT HORIZONTAL EXTENSION FLRS. CALL FOR STEEL C JOISTS BUT NOW WOOD I JOISTS ARE BEING PREPARED TO BE INSTALLED.REMEDY:STOP WORK ON EXTENSIONNothing owed — awaiting certificate of correction
ECB09/29/20091704.1.1 MISC.VIO.FAILURE TO FILE A SPECIAL INSPECTION STATEMENT OF RESPONSIBILITY PRIOR TO THE START OF WORK NO TR1 FILED FOR INSTALLATION OF WOOD I JOIST. AT HORIZONTAL EXTENSION.REMEDY:STOP ALL WORK ON ADDITNothing owed — awaiting certificate of correction
ECB09/21/20093306.5.1 MISC.VIO.FAILURE TO SUBMIT REQUIRED DETAILS OF PARTIAL DEMOLITION(INCLUDING ALTERATIONS INVOLVINGREMOVAL OF STRUCTURAL MEMBERS)WITHTHE CONSTRUCTION DOCUMENTS.NOTED CONTRACTOR FAILED TO SUBMIT REQ'D DOCNothing owed — awaiting certificate of correction
ECB09/02/2009BC3307.3.2 MISC.VIO. FAILURE TO PROVIDE LOT LINE CONSTRUCTION FENCE NOTED @ TIME OF INSPEC. CONTRACTOR FAILED TO PROVIDE LOT LINE CONSTRUCTION FENCE AT EXP.2,3,4, @ REAR OF SITE. JOB#320023201 REMEDY:COMPLY W/NNothing owed — awaiting certificate of correction
ECB09/02/2009BC3304.3.1 MISC.VIO.FAILURE TO NOTIFY DOB WITHIN 24-48 HRS. BEFORE THESTART OF EXCAVATION.CONTRACTOR FAILED TO NOTIFY DOB PRIOR TO THE STARTOF EXCAVATION OF NEW ADDITION.JOB#320023201.REMEDY:COMPLY W/NOTICE CALNothing owed — awaiting certificate of correction
ECB09/02/200927-1036(B)MISC.VIO.FAILURE TO PROPERLY SHORE & BRACE WEAKEND STRUCTURE PRIOR TO FULL OR PARTIAL DEMOLITION.NOTED @ TIME OF INSPECTION CONTRACTOR REMOVED 1ST FLR. STRUCTURAL WALL AT EXP. 3 & FAILED TO PROPERLYNothing owed — awaiting certificate of correction