← Back
Three families
1972 83 STREET
BROOKLYN · BIN 3165189
💬 Discuss this project
1935Year Built
2Stories
C0Building Class
R5Zoning
2,708 sfGross Floor Area
3Units
Rent Stabilized7 Open Violations ▸FDNY Report ↗
Three families · 2,000 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
Architecture
Floor 21p · 1 filing · 3 docs
Floor 1
Basement3p · 1 filing · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN FENG111/12/2025
NIC 88 CORP107/27/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS203/21/2026
HIGH QUALITY 338203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor107/08/2026
HIGH QUALITY CONSTRUCTIONGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244111/12/2025
SQ. ARCH, LLC4802111/12/2025
NIC 88 CORP8371107/27/2022
Building Lifecycle
All (28)Filed (2)Permit Issued (2)Signed Off (2)Violation (18)Special Inspection (4)
05/01/2026
Violation issued (HPD, closed)
A
02/09/2026
Signed off — Alteration
B01315105-I1
11/18/2025
Permit issued — General Construction
B01315105-I1-GC
11/12/2025
Filed — Alteration
B01315105-I1
06/06/2025
Violation issued (HPD, closed)
A
04/08/2024
Violation issued (HPD, closed)
A
05/16/2023
Signed off — Alteration
PROPOSED INTERIOR RENOVATION OF BASEMENT OF EXISTING 2 STORY BUILDING. REPAIR EXISTING FLOORING, CEILING AND PAINTING THROUGHOUT, CONSTRUCTION AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY
B00782716-I1
03/21/2023
Violation issued (HPD, closed)
A
08/03/2022
Permit issued — General Construction
B00782716-I1-GC
07/27/2022
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF BASEMENT OF EXISTING 2 STORY BUILDING. REPAIR EXISTING FLOORING, CEILING AND PAINTING THROUGHOUT, CONSTRUCTION AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY
B00782716-I1
07/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
07/27/2022
Special inspection requirement — Final
Eric Sun
07/27/2022
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
07/27/2022
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
02/23/2022
Violation issued (HPD, closed)
A
04/07/2021
Violation issued (HPD, closed)
I
04/07/2021
Violation issued (HPD, closed)
A
10/29/2019
Violation issued (HPD, closed)
I
10/15/2018
Violation issued (HPD, closed)
I
10/07/2015
Violation issued (HPD, closed)
I
02/17/2015
Violation issued (HPD, closed)
I
03/07/1986
Violation issued (HPD, open)
A
03/07/1986
Violation issued (HPD, open)
A
10/12/1983
Violation issued (HPD, open)
C
10/12/1983
Violation issued (HPD, open)
B
10/12/1983
Violation issued (HPD, open)
A
10/12/1983
Violation issued (HPD, open)
C
10/12/1983
Violation issued (HPD, open)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION11/18/2025
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY08/03/2022
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
07/27/2022Fire-Resistant Penetrations and JointsEric Sunspecial
07/27/2022FinalEric Sunprogress
07/27/2022Energy Code Compliance InspectionsEric Sunprogress
07/27/2022Fire-Resistance Rated ConstructionEric Sunprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026B01315105-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026B01315105-I1Open ↗
08/13/2026B00782716-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026B00782716-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026B00782716-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026B01315105-I1Open ↗
08/13/2026B00782716-I1Open ↗