| Owner | Filings | Most Recent |
|---|---|---|
| LEAD IT BUILDERS | 3 | 07/01/2026 |
| GRUN GROUP | 18 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| ADROIT ENGINEERING PLLC | 1 | 06/12/2026 |
| NIKOLAI KATZ ARCHITECT | 5 | 02/25/2026 |
| VASILIOS ARTEMIOU PE | 3 | 10/21/2025 |
| Representative | Filings | Most Recent |
|---|---|---|
| EXPRESS FILING INC | 16 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| N TECH DESIGN OF AMERICA | General Contractor | 1 | 07/01/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Construction Fence | Permit Issued | N TECH DESIGN OF AMERICA | 06/29/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 02/25/2026 | — | — | Heating and Air Conditioning Systems | Heat / Cool Amana PTH093J30 9,000 BTU · Ptac ×35 PTH073J30 7,000 BTU · Ptac ×31 PTH153J30 14,400 BTU · Ptac ×28 PTH123J30 11,600 BTU · Ptac ×13 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/25/2026 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/25/2026 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/24/2025 | Permit Issued | POWER DIRECT ELECTRIC INC | General Wiring |
| 11/24/2025 | Permit Issued | POWER DIRECT ELECTRIC INC | 1 meters, 1 new_meters |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/25/2026 | — | — | 2 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/12/2026 | Permit Issued | N TECH DESIGN OF AMERICA | Fence |
| 02/25/2026 | — | — | Fence |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 02/16/2026 | Subgrade Inspections | — | special |
| 02/16/2026 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 02/16/2026 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 02/16/2026 | Construction Operations Influencing Adjacent Structures | — | special |
| 02/16/2026 | Subsurface Conditions – Fill Placement & In-Place Density | — | special |
| 10/21/2025 | Maintenance information | — | energy_progress |
| 10/21/2025 | HVAC-R and service water heating system controls | — | energy_progress |
| 10/21/2025 | HVAC-R and service water heating equipment | — | energy_progress |
| 10/21/2025 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 10/21/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 09/29/2025 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 09/29/2025 | Shutoff dampers | — | energy_progress |
| 09/29/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 09/29/2025 | Post-installed Anchors | — | special |
| 09/29/2025 | Mechanical Systems | — | special |
| 09/29/2025 | Energy Code Compliance Inspections | — | progress |
| 09/29/2025 | Final | — | progress |
| 09/29/2025 | Maintenance information | — | energy_progress |
| 09/29/2025 | HVAC-R and service water heating system controls | — | energy_progress |
| 09/29/2025 | Duct leakage testing, insulation and design | — | energy_progress |
| 09/29/2025 | HVAC-R and service water heating equipment | — | energy_progress |
| 09/18/2025 | Sprinkler Systems | — | special |
| 09/18/2025 | Post-installed Anchors | — | special |
| 09/18/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 09/16/2025 | Construction Operations Influencing Adjacent Structures | — | special |