💬 Discuss this project
2021Year Built
8Stories
D6Building Class
R7-2Zoning
107,735 sfGross Floor Area
94Units
Rent Stabilized1 Active Violation 1 old, status unconfirmed ▸
Elevator apt, fireproof with stores · Owner of record: Harlem Multi One · 13,168 sf lot · 8.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsHarlem Multi One, LLC4 filings
RoofHarlem Multi One, LLC15p · 3 filings · 6 docs
Floor 7Harlem Multi One, LLC1 filing · 2 docs
Floor 6Harlem Multi One, LLC1 filing · 2 docs
Floor 5Harlem Multi One, LLC1p · 2 filings · 4 docs
Floor 4Harlem Multi One, LLC2 filings · 2 docs
Floor 3Harlem Multi One, LLC2 filings · 2 docs
Floor 2Harlem Multi One, LLC2 filings · 2 docs
Floor 1Unit 140Under Construction5p · 6 filings · 12 docs
CellarHarlem Multi One, LLC1p · 3 filings · 4 docs
Sub-CellarHarlem Multi One, LLC2p · 2 filings · 4 docs
Site & exteriorHarlem Multi One, LLC8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Harlem Multi One5907/08/2026
Haussmann Development708/29/2026
Roundsquare Development504/09/2026
Division West 29th Street503/22/2026
Eloise 1975 Madison203/21/2026
Metropolitan Methodist Church203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Domani Consulting2103/21/2026
Bridge Expediting203/21/2026
Royal Expediting403/21/2026
Platinum Services NY203/21/2026
KD Designs103/21/2026
Expedite Dem203/21/2026
HS Design Studio203/21/2026
MJ Engineering & Design403/21/2026
Synergy Building Consultants103/21/2026
Sandeep Kaur103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Platinum Services NYScaffold1007/08/2026
Safety Fire SprinklerFire Protection607/08/2026
Broadway Construction GroupGeneral Contractor507/08/2026
Creative Plumbing inPlumbing307/08/2026
Arsenal ScaffoldScaffold204/09/2026
Marine Plumbing & MechanicalPlumbing107/08/2026
Orbit SprinklerFire Protection107/10/2026
S & J IndustrialFire Protection107/08/2026
Empire State ElectlElectrical103/22/2026
Top Plumbing and HeatingPlumbing107/10/2026
E.S.B. ElectricElectrical103/21/2026
LW Interior RemodelingGeneral Contractor107/08/2026
Broadway Construction GroupScaffold104/09/2026
County-Wide MasonryScaffold104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
American Construction Tes9731307/27/2026
George J. Xerakias, PE1658106/06/2025
Domani Inspection Service843706/02/2025
MJ Engineering & Design5546212/10/2024
Mueser Rutledge Consulting977109/21/2023
Building Lifecycle
All (204)Filed (41)Permit Issued (34)Signed Off (17)Violation (18)Inspection (16)Objection (45)Special Inspection (30)Tax Incentive (3)
06/15/2031
421-a(16) construction completed
08/11/2026
Objection resolved — Resolved
08/07/2026
Objection raised — Other
07/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/27/2026
Filed — Alteration
ALTERATION TYPE 2 FOR COMMUNITY FACILTY UNIT 140 ON THE FIRST FLOOR, FITOUT FOR DAYCARE EXISITNG CONDITIONS PER NB# 121206818. NO CHANGE OF OCCPANCY, USE, AND EGRESS IS PROPOSED UNDER THIS APPLICATION.
M01367765-P1
07/09/2026
Permit issued — Sprinklers
M01367765-S1-PL
07/09/2026
Permit issued — Sprinklers
M01367765-S1-EW-SP
07/06/2026
Filed — Alteration
ALTERATION TYPE 2 FOR COMMUNITY FACILTY UNIT 140 ON THE FIRST FLOOR, FITOUT FOR DAYCARE EXISITNG CONDITIONS PER NB# 121206818. NO CHANGE OF OCCPANCY, USE, AND EGRESS IS PROPOSED UNDER THIS APPLICATION.
M01367765-S1
05/21/2026
Permit issued — General Construction
M01367765-I1-GC
05/04/2026
Objection raised — Other
04/20/2026
Objection resolved — Addressed
04/08/2026
Filed — Alteration
ALTERATION TYPE 2 FOR COMMUNITY FACILTY UNIT 140 ON THE FIRST FLOOR, FITOUT FOR DAYCARE EXISITNG CONDITIONS PER NB# 121206818. NO CHANGE OF OCCPANCY, USE, AND EGRESS IS PROPOSED UNDER THIS APPLICATION.
M01367765-S2
04/07/2026
Objection raised — Admin
04/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/06/2026
Special inspection requirement — Interior lighting power
04/06/2026
Special inspection requirement — Energy Code Compliance Inspections
04/06/2026
Special inspection requirement — Shutoff dampers
04/06/2026
Special inspection requirement — Lighting controls
04/06/2026
Special inspection requirement — Maintenance information
04/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
04/06/2026
Special inspection requirement — Duct leakage testing, insulation and design
04/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/31/2026
Special inspection requirement — Tenant Protection Plan Compliance
EDWIN HOPKINS
03/31/2026
Special inspection requirement — Mechanical Systems
03/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
03/31/2026
Special inspection requirement — Sprinkler Systems
EDWIN HOPKINS
03/31/2026
Special inspection requirement — Final
03/10/2026
Filed — Alteration
ALTERATION TYPE 2 FOR COMMUNITY FACILTY UNIT 140 ON THE FIRST FLOOR, FITOUT FOR DAYCARE EXISITNG CONDITIONS PER NB# 121206818. NO CHANGE OF OCCPANCY, USE, AND EGRESS IS PROPOSED UNDER THIS APPLICATION.
M01367765-I1
03/05/2026
Violation issued (ECB, open)
Elevators
03/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
03/05/2026
Special inspection requirement — Final
EDWIN HOPKINS
03/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
EDWIN HOPKINS
11/21/2025
Signed off — Alteration
Suspended scaffold out rigger system for Facade restoration work and inspections.
M01086302-I1
11/12/2025
Filed — Alteration
Suspended scaffold out rigger system for Facade restoration work and inspections.
M01086302-P1
11/07/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY MATERIAL HOIST EQUIPMENT (COUNTERWEIGHTED SYSTEM)
M01234701-I1
10/17/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED, CONTRUCTION FENCE, OVERHEAD PROTECTION AND ROOF PROTECTION AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE 2022. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00950182-I1
10/17/2025
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01062700-I1
10/17/2025
Signed off — Alteration
M01049850-I1
10/16/2025
Signed off — Alteration
TO ERECT A NEW TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH NB 121206818. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00335327-I1
09/26/2025
Signed off — Alteration
Installation of pipe scaffolding as per the plans. Pipe scaffolding shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.
M01121026-I1
08/13/2025
Signed off — Alteration
INSTALLATION OF NEW SPRINKLER AND STANDPIPE SYSTEMS IN CONJUNCTION WITH NEW BUILDING APPLICATION 121206818. PAA FILED TO INDICATE REVISED PLANS AS PER AI 1 DESCRIPTION OF CHANGES.
M00333139-I1
08/12/2025
Signed off — Alteration
HEREWITH FILING TEMPORARY STANDPIPE IN CONJUNCTION WITH NB APPLICATION #121206818
M00350082-I1
07/10/2025
Signed off — Alteration
STRUCTURAL APPLICATION IN CONJUNCTION WITH NEW BUILDING 121206818. 11-30-2023-PAA FILED TO REVISE PLANS AS BUBBLED
M00328470-I1
06/23/2025
Signed off — Alteration
FILING FOR UNDERGROUND PIPING IN CONJUNCTION WITH NB APPLICATION # 121206818
M00319465-I1
06/20/2025
Signed off — Alteration
SUBSEQUENT APPLICANT FILING FOR PLUMBING WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION 121206818. PAA FILED TO INDICATE REVISED PLANS AS PER AI 1 DESCRIPTION OF CHANGES.
M00289169-I1
06/17/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
06/17/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/17/2025
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
06/17/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
06/17/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/16/2025
Permit issued — Supported Scaffold
M01062700-I1-SF
06/13/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/09/2025
Permit issued — Suspended Scaffold
M01234701-I1-SC
06/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
06/09/2025
Special inspection requirement — Sprinkler Systems
JOHN MCMONAGLE
06/09/2025
Special inspection requirement — Standpipe Systems
JOHN MCMONAGLE
06/06/2025
Filed — Alteration
INSTALLATION OF TEMPORARY MATERIAL HOIST EQUIPMENT (COUNTERWEIGHTED SYSTEM)
M01234701-I1
06/06/2025
Special inspection requirement — Post-installed Anchors
George Xerakias
Latest 60 of 204 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedTop Plumbing and Heating07/09/2026
DOB NOWSprinklersPermit IssuedOrbit Sprinkler07/09/2026
DOB NOWGeneral ConstructionPermit IssuedLW Interior Remodeling05/21/2026
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY06/16/2025
DOB NOWSuspended ScaffoldSigned-offPioneer Window Manufacturing06/09/2025
DOB NOWProtection and Mechanical MethodsSigned-offPlatinum Services NY05/12/2025
DOB NOWGeneral ConstructionSigned-offBroadway Construction Group04/24/2025
DOB NOWStandpipeSigned-offSafety Fire Sprinkler04/22/2025
DOB NOWStandpipeSigned-offSafety Fire Sprinkler04/22/2025
DOB NOWSprinklersSigned-offSafety Fire Sprinkler04/22/2025
DOB NOWGeneral ConstructionSigned-offBroadway Construction Group04/21/2025
DOB NOWCurb CutPermit IssuedBroadway Construction Group04/18/2025
DOB NOWPlumbingSigned-offAB Plumbing03/24/2025
DOB NOWSuspended ScaffoldPermit IssuedM.G.R. Restoration01/10/2025
DOB NOWSidewalk ShedSigned-offPlatinum Services NY12/02/2024
DOB NOWSidewalk ShedSigned-offPlatinum Services NY12/02/2024
DOB NOWSupported ScaffoldSigned-offCounty-Wide Masonry10/22/2024
DOB NOWSuspended ScaffoldPermit IssuedM.G.R. Restoration09/12/2024
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY06/18/2024
DOB NOWMechanical SystemsSigned-offBroadway Construction Group05/31/2024
DOB NOWStandpipeSigned-offSafety Fire Sprinkler05/20/2024
DOB NOWSprinklersSigned-offSafety Fire Sprinkler05/20/2024
DOB NOWStandpipeSigned-offSafety Fire Sprinkler05/20/2024
DOB NOWProtection and Mechanical MethodsSigned-offPlatinum Services NY05/14/2024
DOB NOWStructuralSigned-offBroadway Construction Group04/26/2024
DOB NOWPlumbingSigned-offAB Plumbing03/26/2024
DOB NOWPlumbingSigned-offAB Plumbing02/01/2024
DOB NOWConstruction FenceSigned-offPlatinum Services NY12/05/2023
DOB NOWSidewalk ShedSigned-offPlatinum Services NY12/05/2023
DOB NOWConstruction FenceSigned-offBroadway Construction Group07/14/2023
DOB NOWPlumbingSigned-offMarine Plumbing & Mechanical08/31/2022
DOB NOWStandpipeSigned-offS & J Industrial04/21/2022
DOB NOWConstruction FencePermit IssuedArsenal Scaffold03/18/2021
DOB NOWConstruction FencePermit IssuedArsenal Scaffold12/04/2020
BIS—ISSUEDBroadway Construction Group02/02/2026
BIS—ISSUEDBroadway Construction Group12/11/2025
BIS—ISSUEDBroadway Construction Group06/11/2025
BISEQISSUEDV&P Altitude02/27/2025
BIS—ISSUEDBroadway Construction Group01/20/2025
BIS—ISSUEDBroadway Construction Group01/17/2024
+ 7 more permits on file
2 projects · most recent 07/27/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/27/2026Permit IssuedLW Interior RemodelingAir Conditioning Systems
Cooling
Daikin FXFQ12AAVJU 23,000 BTU · Vrf Indoor ×1
FXSQ24TAVJU 24,000 BTU · Vrf Indoor ×1
FXSQ36TAVJU 36,000 BTU · Vrf Indoor ×1
FXZQ12TBVJU 12,000 BTU · Vrf Indoor ×1
12/19/2024Signed-offBroadway Construction GroupAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Daikin RZQ18TAVJU 24,000 BTU · Condensing Unit ×152
RZQ24TAVJU 24,000 BTU · Condensing Unit ×34
FBQ30PVJU 27,000 BTU · Vrf Indoor ×10
RZQ30TAVJU 30,000 BTU · Vrf Outdoor ×8
FXSQ12TAVJU 73,000 BTU · Vrf Indoor ×4
FBQ18PVJU 20,000 BTU · Vrf Indoor ×2
FBQ24PVJU 73,000 BTU · Split System ×2
FBQ36PVJU 73,000 BTU · Split System ×2
FXSQ24TAVJU 280,000 BTU · Vrf Indoor ×2
RXYQ360TATJU 372,000 BTU · Vrf Outdoor ×2
RXYQ72TTJU 69,000 BTU · Vrf Outdoor ×2
Heating
Daikin FBQ18PVJU 27,000 BTU · Vrf Indoor ×152
FBQ24PVJU 27,000 BTU · Fan Coil Indoor ×26
FBQ21PVJU 27,000 BTU · Vrf Indoor ×4
Ventilation
Daikin DPS005A 62,000 BTU · Rooftop Unit ×2
1 project · most recent 02/19/2025
Storm Water/Sanitary
FiledStatusContractorScope
02/19/2025Signed-offCreative Plumbing inStorm, Water/Sanitary
10 projects · most recent 07/23/2026
General Wiring
FiledStatusContractorScope
07/23/2026Permit IssuedP & Z ElectricGeneral Wiring
03/27/2026CompleteE.S.B. Electric—
10/15/2025CompleteEmpire State ElectlGeneral Wiring
02/25/2025Permit IssuedStar Electrical Contractors—
05/15/2024CompleteIlluminous Electric—
05/09/2024CompleteEmpire State Electl—
11/28/2023CompleteNova Electric—
10/23/2023CompleteIlluminous ElectricGeneral Wiring
08/22/2019CompleteRichard Neu—
07/29/2019CompleteRoma Electric—
1 project · most recent 12/03/2020
Fence
FiledStatusContractorScope
12/03/2020Permit IssuedArsenal ScaffoldFence
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
07/28/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/17/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
06/17/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/17/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
06/17/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
06/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/13/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/29/2025Pass-Final General Construction Non-Directive 14PassView ↗
05/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/27/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/18/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
06/21/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
06/21/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
04/19/2024Pass-Final PL - UndergroundPassView ↗
02/22/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
04/06/2026HVAC-R and service water piping design and insulation—energy_progress
04/06/2026Interior lighting power—energy_progress
04/06/2026Energy Code Compliance Inspections—progress
04/06/2026Shutoff dampers—energy_progress
04/06/2026Lighting controls—energy_progress
04/06/2026Maintenance information—energy_progress
04/06/2026Tenant Protection Plan Compliance—special
04/06/2026Fire-Resistant Penetrations and Joints—special
04/06/2026HVAC-R and service water heating equipment—energy_progress
04/06/2026Duct leakage testing, insulation and design—energy_progress
04/06/2026HVAC-R and service water heating system controls—energy_progress
03/31/2026Tenant Protection Plan ComplianceEDWIN HOPKINSspecial
03/31/2026Mechanical Systems—special
03/31/2026Fire-Resistant Penetrations and JointsEDWIN HOPKINSspecial
03/31/2026Sprinkler SystemsEDWIN HOPKINSspecial
03/31/2026Final—progress
03/05/2026Fire-Resistant Penetrations and JointsEDWIN HOPKINSspecial
03/05/2026FinalEDWIN HOPKINSprogress
03/05/2026Tenant Protection Plan ComplianceEDWIN HOPKINSspecial
06/09/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
06/09/2025Sprinkler SystemsJOHN MCMONAGLEspecial
06/09/2025Standpipe SystemsJOHN MCMONAGLEspecial
06/06/2025Post-installed AnchorsGeorge Xerakiasspecial
05/30/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
05/30/2025Sprinkler SystemsJOHN MCMONAGLEspecial
Latest 25 of 53.
▾Documents — 337 on file (BIS + DOB NOW)
▸Plans & Drawings41
▸DOB NOWPlans/Sketch19
08/28/2026M00950182-I1Request digital key ↗
08/28/2026M00950182-P2Request digital key ↗
08/28/2026M00950182-P1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Standpipe5
08/25/2026M00333139-P2Request digital key ↗
08/25/2026M00333139-P3Request digital key ↗
08/15/2026M00333139-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
08/25/2026M00333139-P3Request digital key ↗
08/25/2026M00333139-P2Request digital key ↗
08/15/2026M00333139-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00289159-I1Request digital key ↗
09/05/2026M00289159-P4Request digital key ↗
09/05/2026M00289159-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence3
09/05/2026M00230326-I1Request digital key ↗
09/05/2026M00335327-I1Request digital key ↗
09/04/2026M00432589-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/28/2026M00328470-I1Request digital key ↗
08/14/2026M00328470-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00220812-I1Request digital key ↗
09/05/2026M00318988-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/05/2026M00334748-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00217546-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/25/2026M00319465-I1Request digital key ↗
▸Applications & Permits64
▸BISPLAN / WORK APPROVAL APPLICATION42
03/06/2026141025183Open ↗
12/11/2025141025183Open ↗
11/17/2025121206818Open ↗
Showing 3 of 42 on file for this type
▸BISWORK PERMIT APPLICATION20
12/12/2025121206818Open ↗
06/11/2025121206818Open ↗
02/27/2025141026994Open ↗
Showing 3 of 20 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
05/05/2025141025183Open ↗
03/03/2020140886959Open ↗
▸Zoning, Tax Lot & Property Records11
▸BISZONING DIAGRAM2
05/10/2024121206818Open ↗
06/11/2020121206818Open ↗
▸BISZONING EXHIBIT V: CERTIFICATION1
06/09/2020121206818Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
06/09/2020121206818Open ↗
▸BISVERIFY TAX LOT1
10/16/2025121206818Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
03/27/2025121206818Open ↗
▸BISZONING EXHIBIT IV: CERTIFICATION1
06/09/2020121206818Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT II: CERTIFICATION1
06/09/2020121206818Open ↗
▸Seals & Professional Certifications68
▸DOB NOWDPL-1: Design Professional Seal & Signature36
09/05/2026M00217546-I1Open ↗
09/05/2026M00289159-P4Open ↗
09/05/2026M00289159-P1Open ↗
Showing 3 of 36 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
04/29/2022121206818Open ↗
04/29/2022121206818Open ↗
04/29/2022121206818Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026M00333139-P3Open ↗
08/31/2026M01234701-I1Open ↗
08/30/2026M00289159-P4Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/02/2026M00230326-I1Open ↗
08/30/2026M00289159-P4Open ↗
08/30/2026M00289159-P4Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
03/08/2024141025183Open ↗
03/03/2020140886959Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
02/11/2025141026994Open ↗
03/08/2024141025183Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
02/11/2025141026994Open ↗
Showing 1 of 2 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment6
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
07/14/2025121206818Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER SYSTEMS1
05/16/2025121206818Open ↗
▸BISSTANDPIPE SYSTEMS1
07/14/2025121206818Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
06/09/2020121206818Open ↗
▸BISHEATING SYSTEMS1
07/14/2025121206818Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST3
06/09/2020121206818Open ↗
03/03/2020140886959Open ↗
Showing 2 of 3 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
02/13/2024121206818Open ↗
03/03/2020140886959Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/08/2024141025183Open ↗
▸BISSTREET TREE SIGNOFF1
11/18/2025121206818Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
04/29/2022121206818Open ↗
04/29/2022121206818Open ↗
Showing 2 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
11/18/2025121206818Open ↗
03/03/2022123895142Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/17/2021121206818Open ↗
01/26/2021121206818Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/14/2025121206818Open ↗
▸BISLIGHTING IN DWELLING UNITS1
07/14/2025121206818Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/14/2025121206818Open ↗
▸BISLIGHTING CONTROLS1
07/14/2025121206818Open ↗
▸BISEXTERIOR LIGHTING POWER1
07/14/2025121206818Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY5
02/27/2025141026994Open ↗
02/11/2025141026994Open ↗
07/29/2020121206818Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX5
04/17/2024121206818Open ↗
04/17/2024121206818Open ↗
04/17/2024121206818Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
07/29/2020121206818Open ↗
06/09/2020121206818Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
10/15/2025121206818Open ↗
02/13/2024121206818Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
04/09/2025121206818Open ↗
▸BISSOIL REPORT1
06/09/2020121206818Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
04/26/2022121206818Open ↗
▸BISMECHANICAL SYSTEMS1
07/28/2025121206818Open ↗
▸Approvals, Objections & Sign-offs34
▸BISSCHEDULE A - OCCUPANCY / USE14
11/17/2025121206818Open ↗
10/31/2025121206818Open ↗
04/07/2025121206818Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
04/26/2022121206818Open ↗
04/26/2022121206818Open ↗
04/26/2022121206818Open ↗
Showing 3 of 10 on file for this type
▸BISSUPERSEDING LETTER8
12/12/2025121206818Open ↗
06/11/2025121206818Open ↗
02/29/2024121206818Open ↗
Showing 3 of 8 on file for this type
▸BISFINAL1
03/03/2022123895142Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M00318988-I1Open ↗
▸Cost, Insurance & Ownership9
▸BISPROJECT-SPECIFIC GL INSURANCE5
02/28/2024121206818Open ↗
01/04/2024121206818Open ↗
08/30/2023121206818Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT3
02/11/2025141026994Open ↗
Showing 1 of 3 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/28/2025123895142Open ↗
▸Filing & Intake Forms25
▸BISADDITIONAL INFORMATION17
12/15/2025141025183Open ↗
11/06/2025141025183Open ↗
04/11/2025121206818Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING COVER SHEET5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
02/11/2025141026994Open ↗
03/08/2024141025183Open ↗
Showing 2 of 3 on file for this type
▸Other Documents23
▸BISBPP - SUPPORTING DOCUMENTATION5
12/15/2025141025183Open ↗
11/06/2025141025183Open ↗
11/06/2025141025183Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM5
06/09/2020121206818Open ↗
05/04/2020121206818Open ↗
Showing 2 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
05/02/2022121206818Open ↗
04/26/2022121206818Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWCalculations3
08/13/2026M01234701-I1Open ↗
08/13/2026M01086302-P1Open ↗
08/13/2026M01086302-I1Open ↗
▸DOB NOWManufacturer's Specifications3
08/13/2026M01234701-I1Open ↗
08/13/2026M01086302-P1Open ↗
08/13/2026M01086302-I1Open ↗
▸BISVESTIBULES1
07/14/2025121206818Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
03/08/2024141025183Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
08/19/2024121206818Open ↗