← Back
Two family converted from one family
1977 80 STREET
BROOKLYN · BIN 3162830
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R5Zoning
3,264 sfGross Floor Area
2Units
Two family converted from one family · 3,600 sf lot · 0.91 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Floor 23p · 2 filings · 20 docs
Floor 1
Cellar6p · 2 filings · 20 docs
1 job · most recent 12/09/2021
General Wiring
FiledStatusContractorScope
12/09/2021CompleteJ Y ELECTRIC INCGeneral Wiring
Building Lifecycle
All (43)Filed (5)Permit Issued (2)Signed Off (2)Inspection (5)Special Inspection (29)
07/13/2022
Signed off — Alteration
INSTALL H.W.H. IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00629816-I1
06/30/2022
Signed off — Alteration
INTERIOR RENOVATION OF BASEMENT, 1ST AND 2ND FLOOR OF EXISTING 3 STORY BUILDING. PARTITION, FLOORING AND PAINTING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00627149-I1
05/12/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/07/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
HO YIN LAW
04/15/2022
Special inspection requirement — HVAC-R and service water heating equipment
HO YIN LAW
04/15/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
HO YIN LAW
04/15/2022
Special inspection requirement — HVAC-R and service water heating system controls
HO YIN LAW
04/15/2022
Special inspection requirement — Energy Code Compliance Inspections
HO YIN LAW
04/14/2022
Filed — Alteration
INSTALL H.W.H. IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00629816-P2
01/18/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/18/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/18/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/07/2022
Special inspection requirement — Final
HO YIN LAW
01/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
HO YIN LAW
01/07/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
HO YIN LAW
01/07/2022
Special inspection requirement — Energy Code Compliance Inspections
HO YIN LAW
01/07/2022
Special inspection requirement — Fire-Resistance Rated Construction
HO YIN LAW
01/07/2022
Special inspection requirement — Insulation placement and R values
HO YIN LAW
01/07/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
HO YIN LAW
01/07/2022
Special inspection requirement — Fenestration areas
HO YIN LAW
01/07/2022
Special inspection requirement — Interior lighting power
HO YIN LAW
01/07/2022
Special inspection requirement — Metering
HO YIN LAW
01/07/2022
Special inspection requirement — Air barrier - visual inspection
HO YIN LAW
01/07/2022
Special inspection requirement — Fenestration air leakage
HO YIN LAW
01/06/2022
Filed — Alteration
INTERIOR RENOVATION OF BASEMENT, 1ST AND 2ND FLOOR OF EXISTING 3 STORY BUILDING. PARTITION, FLOORING AND PAINTING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00627149-P1
01/06/2022
Filed — Alteration
INSTALL H.W.H. IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00629816-P1
01/06/2022
Special inspection requirement — Energy Code Compliance Inspections
HO YIN LAW
01/06/2022
Special inspection requirement — Fenestration air leakage
HO YIN LAW
01/06/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
HO YIN LAW
01/06/2022
Special inspection requirement — Fenestration areas
HO YIN LAW
01/06/2022
Special inspection requirement — Interior lighting power
HO YIN LAW
01/06/2022
Special inspection requirement — Metering
HO YIN LAW
01/06/2022
Special inspection requirement — Insulation placement and R values
HO YIN LAW
01/06/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
HO YIN LAW
01/06/2022
Special inspection requirement — Air barrier - visual inspection
HO YIN LAW
01/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
HO YIN LAW
01/06/2022
Special inspection requirement — Fire-Resistance Rated Construction
HO YIN LAW
01/06/2022
Special inspection requirement — Final
HO YIN LAW
11/19/2021
Permit issued — Plumbing
B00629816-I1-PL
11/18/2021
Permit issued — General Construction
B00627149-I1-GC
11/16/2021
Filed — Alteration
INSTALL H.W.H. IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00629816-I1
11/16/2021
Filed — Alteration
INTERIOR RENOVATION OF BASEMENT, 1ST AND 2ND FLOOR OF EXISTING 3 STORY BUILDING. PARTITION, FLOORING AND PAINTING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00627149-I1
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/23/2021$1.7M—Private party → Private party$514/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KL INNOVATIVE DESIGN INC304/14/2022
NIC 88 CORP211/16/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor107/08/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KL INNOVATIVE DESIGN INC7225504/14/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT & T PLUMBING INC11/19/2021
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY11/18/2021
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/12/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/07/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/18/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/18/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
04/15/2022Fire-Resistant Penetrations and JointsHO YIN LAWspecial
04/15/2022HVAC-R and service water heating equipmentHO YIN LAWenergy_progress
04/15/2022HVAC-R and service water piping design and insulationHO YIN LAWenergy_progress
04/15/2022HVAC-R and service water heating system controlsHO YIN LAWenergy_progress
04/15/2022Energy Code Compliance InspectionsHO YIN LAWprogress
01/07/2022FinalHO YIN LAWprogress
01/07/2022Fire-Resistant Penetrations and JointsHO YIN LAWspecial
01/07/2022Structural Stability – Alterations of existing buildingsHO YIN LAWspecial
01/07/2022Energy Code Compliance InspectionsHO YIN LAWprogress
01/07/2022Fire-Resistance Rated ConstructionHO YIN LAWprogress
01/07/2022Insulation placement and R valuesHO YIN LAWenergy_progress
01/07/2022Fenestration and door U-factor and product ratingsHO YIN LAWenergy_progress
01/07/2022Fenestration areasHO YIN LAWenergy_progress
01/07/2022Interior lighting powerHO YIN LAWenergy_progress
01/07/2022MeteringHO YIN LAWenergy_progress
01/07/2022Air barrier - visual inspectionHO YIN LAWenergy_progress
01/07/2022Fenestration air leakageHO YIN LAWenergy_progress
01/06/2022Energy Code Compliance InspectionsHO YIN LAWprogress
01/06/2022Fenestration air leakageHO YIN LAWenergy_progress
01/06/2022Fenestration and door U-factor and product ratingsHO YIN LAWenergy_progress
01/06/2022Fenestration areasHO YIN LAWenergy_progress
01/06/2022Interior lighting powerHO YIN LAWenergy_progress
01/06/2022MeteringHO YIN LAWenergy_progress
01/06/2022Insulation placement and R valuesHO YIN LAWenergy_progress
01/06/2022Structural Stability – Alterations of existing buildingsHO YIN LAWspecial
Latest 25 of 29.
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/31/2026B00627149-I1Request digital key ↗
08/31/2026B00627149-P1Request digital key ↗
08/31/2026B00629816-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026B00627149-P1Open ↗
09/01/2026B00627149-P1Open ↗
09/01/2026B00627149-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/31/2026B00627149-I1Open ↗
08/31/2026B00627149-P1Open ↗
08/31/2026B00629816-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B00627149-P1Open ↗
08/27/2026B00627149-I1Open ↗
08/26/2026B00629816-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/31/2026B00627149-I1Open ↗
08/31/2026B00627149-P1Open ↗
08/31/2026B00629816-P2Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00627149-I1Open ↗
08/13/2026B00629816-I1Open ↗