DOB06/10/2006WORK WITHOUT A PERMIT-HAZARDOUS. NOTED: 1ST FLOOR RENOVATION ONGOING WITH NEW PARTITION, ELECTRICAL/PLUMBING- NEW LINES BEING RUN STAIRCASE FROM 1ST FLOOR TO BASEMENT, BOILER/HOT WATER INSTALLED IN 1997 NOT PERMITTED. REMEDY:STOP ALL WORK-OBTAIN PERMIT/ARCHITERCTUAL PLANS
HPD09/21/1993SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION OPENING CREATED IN WALL AT TOP OF CELLAR STAIRS ENCLOSURE CREATING NEW ENTRANCE TO 1ST STY APT.
Two family brick · 2,000 sf lot · 1.12 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.