2 Open Violations 1 unresolved · 1 paperwork only▸
DOB04/25/2013FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB01/30/2013WORK W/O PERMIT.WORK NOTED:AT CELLAR LEVEL INSTALLED WATER AND WASTE LINES FOR 3PC BATHROOM (SINK,TOILET,TUB) AND ADDITIONAL LINES FOR SINK.INSTALLED NEW GAS LINES AT CELLAR REAR SIDE NEXT SINK LINES AND AT FRONothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 3,000 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.