← Back
Multi-story retail building (2+)
198 5 AVENUE
BROOKLYN · BIN 3019708
💬 Discuss this project
1920Year Built
2Stories
K2Building Class
R6AZoning
4,296 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Multi-story retail building (2+) · Owner of record: 200 PLAZA LLC · 2,300 sf lot · 1.87 FAR built · Flood zone X
Locations of Work
ElectricalMechanical
Roof4p · 2 filings · 20 docs
Floor 11p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MNK ENTERPRISES603/22/2026
MG PARTNERSHIP103/22/2026
200 PLAZA LLC OWNER203/22/2026
991 PLAZA203/21/2026
CONSTRUCTION SERVICES CONSULTING203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANDREW KATZ ENGINEERS404/28/2025
FORMACTIV304/21/2022
BRICOLAGE DESIGNS211/11/2021
ENTHINK ENGINEERS LLC106/04/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BRICOLAGE DESIGNS203/21/2026
KX CONSULTING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ABECO CONSTRUCTION LLCGeneral Contractor1107/08/2026
RJ BRUNO INCPlumbing707/08/2026
SWE DEVELOPMENT CORPGeneral Contractor303/21/2026
MNK ENTERPRISES LLCGeneral Contractor303/21/2026
J & F ELECL CONTNG INCElectrical203/22/2026
J F ELECL CONTNG INC 004438General Contractor103/22/2026
RICHARD NEUElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DAVID KATZ, P.E.6087404/28/2025
MJ ENGINEERING & DESIGN5546211/11/2021
FORMACTIV ARCHITECTURE3024109/15/2021
Building Lifecycle
All (68)Filed (10)Permit Issued (11)Signed Off (7)Violation (2)Inspection (5)Objection (6)Special Inspection (27)
05/01/2025
Signed off — Alteration
INSTALLATION OF NEW DUCTWORK, TOILET EXHAUST AS PER PLANS SUBMITTED. ROOFTOP UNITS FILED AND APPROVED UNDER JOB #B00618192. NO CHANGE IN USE, EGRESS OR OCCUPANCY,
B00695669-I1
04/29/2025
Special inspection requirement — Heating Systems
David Katz
04/29/2025
Special inspection requirement — Mechanical Systems
David Katz
04/29/2025
Special inspection requirement — Final
David Katz
04/29/2025
Special inspection requirement — Energy Code Compliance Inspections
David Katz
04/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
David Katz
04/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
David Katz
04/29/2025
Special inspection requirement — Maintenance information
David Katz
04/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
David Katz
04/28/2025
Filed — Alteration
INSTALLATION OF NEW DUCTWORK, TOILET EXHAUST AS PER PLANS SUBMITTED. ROOFTOP UNITS FILED AND APPROVED UNDER JOB #B00618192. NO CHANGE IN USE, EGRESS OR OCCUPANCY,
B00695669-P1
04/24/2025
Special inspection requirement — Maintenance information
David Katz
04/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
David Katz
04/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
David Katz
04/24/2025
Special inspection requirement — Heating Systems
David Katz
04/24/2025
Special inspection requirement — Mechanical Systems
David Katz
04/24/2025
Special inspection requirement — Energy Code Compliance Inspections
David Katz
04/24/2025
Special inspection requirement — Final
David Katz
04/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
David Katz
06/29/2023
Signed off — Alteration
B00593003-I1
06/29/2023
Signed off — Alteration
Remove and install plumbing fixtures with finishes on 1st floor commercial space as per plans submitted herewith.
B00593067-I1
06/07/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/06/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/01/2023
Permit issued — Plumbing
B00593067-I1-PL
12/15/2022
Signed off — Alteration
DIRECT REPLACEMENT OF 2 EXISTING ROOFTOP AC UNITS ON EXISTING STEEL DUNNAGE. RECONNECT TO EXISTING SUPPLY RETURN DUCTWORK. OBTAIN CERTIFICATE OF COMPLIANCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00618192-I1
12/15/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/20/2022
Signed off — Alteration
B00629286-I1
05/20/2022
Permit issued — General Construction
B00593003-I1-GC
05/19/2022
Permit issued — Mechanical Systems
B00695669-I1-MS
05/09/2022
Filed — Alteration
INSTALLATION OF NEW DUCTWORK, TOILET EXHAUST AS PER PLANS SUBMITTED. ROOFTOP UNITS FILED AND APPROVED UNDER JOB #B00618192. NO CHANGE IN USE, EGRESS OR OCCUPANCY,
B00695669-I1
05/04/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/28/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/21/2022
Filed — Alteration
Remove and install plumbing fixtures with finishes on 1st floor commercial space as per plans submitted herewith.
B00593067-P1
04/11/2022
Permit issued — General Construction
B00593003-I1-GC
03/30/2022
Filed — Alteration
DIRECT REPLACEMENT OF 2 EXISTING ROOFTOP AC UNITS ON EXISTING STEEL DUNNAGE. RECONNECT TO EXISTING SUPPLY RETURN DUCTWORK. OBTAIN CERTIFICATE OF COMPLIANCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00618192-P1
03/29/2022
Special inspection requirement — Mechanical Systems
David Katz
03/29/2022
Special inspection requirement — Heating Systems
David Katz
03/29/2022
Special inspection requirement — Energy Code Compliance Inspections
David Katz
03/29/2022
Special inspection requirement — Final
David Katz
03/29/2022
Special inspection requirement — HVAC-R and service water heating system controls
David Katz
03/29/2022
Special inspection requirement — HVAC-R and service water heating equipment
David Katz
03/29/2022
Special inspection requirement — Maintenance information
David Katz
02/16/2022
Permit issued — General Construction
B00593003-I1-GC
02/14/2022
Permit issued — General Construction
B00593003-I1-GC
02/08/2022
Permit issued — Plumbing
B00593067-I1-PL
12/01/2021
Permit issued — General Construction
B00629286-I1-GC
11/15/2021
Permit issued — Mechanical Systems
B00618192-I1-MS
11/11/2021
Filed — Alteration
B00629286-I1
10/28/2021
Filed — Alteration
DIRECT REPLACEMENT OF 2 EXISTING ROOFTOP AC UNITS ON EXISTING STEEL DUNNAGE. RECONNECT TO EXISTING SUPPLY RETURN DUCTWORK. OBTAIN CERTIFICATE OF COMPLIANCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00618192-I1
09/20/2021
Permit issued — General Construction
B00593003-I1-GC
09/17/2021
Filed — Alteration
Remove and install plumbing fixtures with finishes on 1st floor commercial space as per plans submitted herewith.
B00593067-I1
09/15/2021
Filed — Alteration
B00593003-I1
07/07/2021
Signed off — Alteration
B00533215-I1
06/24/2021
Signed off — Alteration
PROPOSED RELOCATED LAVATORY ON EXISTING SECOND FLOOR.ADDITIONALLY, A DRINKING FOUNTAIN AND SERVICE SINK IS BEING ADDED.
B00411475-I1
06/04/2021
Filed — Alteration
B00533215-I1
06/04/2021
Permit issued — Sidewalk Shed
B00533215-I1-SH
10/27/2020
Objection raised — Inspections
10/27/2020
Objection resolved — Addressed
10/27/2020
Objection raised — Inspections
10/27/2020
Objection resolved — Addressed
10/27/2020
Objection raised — Structural
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offRJ BRUNO INC06/01/2023
DOB NOWGeneral ConstructionSigned-offABECO CONSTRUCTION LLC05/20/2022
DOB NOWMechanical SystemsSigned-offABECO CONSTRUCTION LLC05/19/2022
DOB NOWGeneral ConstructionSigned-offABECO CONSTRUCTION LLC04/11/2022
DOB NOWGeneral ConstructionSigned-offABECO CONSTRUCTION LLC02/16/2022
DOB NOWGeneral ConstructionSigned-offSWE DEVELOPMENT CORP02/14/2022
DOB NOWPlumbingSigned-offRJ BRUNO INC02/08/2022
DOB NOWGeneral ConstructionSigned-offABECO CONSTRUCTION LLC12/01/2021
DOB NOWMechanical SystemsSigned-offABECO CONSTRUCTION LLC11/15/2021
DOB NOWGeneral ConstructionSigned-offABECO CONSTRUCTION LLC09/20/2021
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC06/04/2021
BISOTISSUEDABECO CONSTRUCTION LLC11/04/2020
BISOTISSUEDDWC CONSTRUCTION LLC09/07/2018
BISEQISSUEDCONSTRUCTION SVS CON NY08/23/2018
BISEQISSUEDCONSTRUCTION SVS CON NY03/06/2017
2 projects · most recent 12/17/2024
General Wiring
FiledStatusContractorScope
12/17/2024CompleteJ & F ELECL CONTNG INCGeneral Wiring
06/03/2021CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/07/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/06/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/15/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/28/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
04/29/2025Heating SystemsDavid Katzspecial
04/29/2025Mechanical SystemsDavid Katzspecial
04/29/2025FinalDavid Katzprogress
04/29/2025Energy Code Compliance InspectionsDavid Katzprogress
04/29/2025HVAC-R and service water heating system controlsDavid Katzenergy_progress
04/29/2025HVAC-R and service water piping design and insulationDavid Katzenergy_progress
04/29/2025Maintenance informationDavid Katzenergy_progress
04/29/2025HVAC-R and service water heating equipmentDavid Katzenergy_progress
04/24/2025Maintenance informationDavid Katzenergy_progress
04/24/2025HVAC-R and service water heating system controlsDavid Katzenergy_progress
04/24/2025HVAC-R and service water heating equipmentDavid Katzenergy_progress
04/24/2025Heating SystemsDavid Katzspecial
04/24/2025Mechanical SystemsDavid Katzspecial
04/24/2025Energy Code Compliance InspectionsDavid Katzprogress
04/24/2025FinalDavid Katzprogress
04/24/2025HVAC-R and service water piping design and insulationDavid Katzenergy_progress
03/29/2022Mechanical SystemsDavid Katzspecial
03/29/2022Heating SystemsDavid Katzspecial
03/29/2022Energy Code Compliance InspectionsDavid Katzprogress
03/29/2022FinalDavid Katzprogress
03/29/2022HVAC-R and service water heating system controlsDavid Katzenergy_progress
03/29/2022HVAC-R and service water heating equipmentDavid Katzenergy_progress
03/29/2022Maintenance informationDavid Katzenergy_progress
10/26/2020HVAC insulation and sealing Magdy Youssefenergy_progress
10/26/2020Maintenance informationMagdy Youssefenergy_progress
Latest 25 of 27.
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
09/01/2026B00533215-I1Request digital key ↗
09/01/2026B00593003-I1Request digital key ↗
08/31/2026B00618192-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
08/15/2026B00411475-I1Request digital key ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION5
03/15/2021340774638Open ↗
10/22/2020340774638Open ↗
07/30/2018321771329Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION4
11/04/2020340774638Open ↗
09/07/2018321771329Open ↗
08/24/2018340478780Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026B00695669-I1Open ↗
09/01/2026B00695669-I1Open ↗
08/30/2026B00411475-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/02/2026B00411475-I1Open ↗
09/01/2026B00533215-I1Open ↗
09/01/2026B00593003-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B00695669-I1Open ↗
08/30/2026B00411475-I1Open ↗
08/26/2026B00695669-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
03/18/2019321771329Open ↗
09/07/2018321771329Open ↗
06/14/2018321771329Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
03/15/2021340774638Open ↗
03/04/2017340478780Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/04/2017340478780Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/04/2017340478780Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/28/2020340774638Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
08/15/2018321771329Open ↗
06/14/2018321771329Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/01/2026B00593003-I1Open ↗
08/31/2026B00629286-I1Open ↗
08/29/2026B00593067-P1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/28/2020340774638Open ↗
08/15/2018321771329Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
03/18/2019321771329Open ↗
08/15/2018321771329Open ↗
06/14/2018321771329Open ↗
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00618192-I1Open ↗
08/13/2026B00593003-I1Open ↗
08/13/2026B00695669-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/23/2021340774638Open ↗
11/04/2020340774638Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
06/23/2021340774638Open ↗
03/18/2019321771329Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/15/2021340774638Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
06/23/2021340774638Open ↗
11/04/2020340774638Open ↗
03/04/2017340478780Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
03/29/2019321771329Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
06/23/2021340774638Open ↗
03/29/2019321771329Open ↗
03/18/2019321771329Open ↗
▸BISSHED LETTER1
08/24/2018340478780Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
06/23/2021340774638Open ↗
10/28/2020340774638Open ↗
06/14/2018321771329Open ↗
▸Filing & Intake Forms6
▸BISEFILING JOB APPLICATION COVER SHEET2
03/15/2021340774638Open ↗
03/04/2017340478780Open ↗
▸BISBOROUGH INTAKE FORM2
03/29/2019321771329Open ↗
03/29/2019321771329Open ↗
▸BISADDITIONAL INFORMATION1
03/04/2017340478780Open ↗
▸BISEFILING COVER SHEET1
06/14/2018321771329Open ↗
▸Other Documents1
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
10/28/2020340774638Open ↗