← Back
One family attached or semi-detached
198 ADA DRIVE
STATEN ISLAND · Mariner's Harbor-Arlington-Graniteville · BIN 5032595
💬 Discuss this project
1978Year Built
2Stories
A5Building Class
R3-2Zoning
1,288 sfGross Floor Area
1Units
One family attached or semi-detached · 2,530 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC112/11/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272112/11/2023
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
03/11/2024
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00965449-I1
12/15/2023
Permit issued — Solar
S00965449-I1-SL
12/11/2023
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00965449-I1
11/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
11/20/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
11/20/2023
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
11/20/2023
Special inspection requirement — Final
Walid Abdulla
11/20/2023
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC12/15/2023
1 project · most recent 11/20/2023
FiledStatusContractorScope
11/20/2023CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/20/2023Fire-Resistant Penetrations and JointsWalid Abdullaspecial
11/20/2023Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
11/20/2023Energy Code Compliance InspectionsWalid Abdullaprogress
11/20/2023FinalWalid Abdullaprogress
11/20/2023Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026S00965449-I1Open ↗
08/24/2026S00965449-I1Open ↗
08/24/2026S00965449-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026S00965449-I1Open ↗
08/24/2026S00965449-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S00965449-I1Open ↗