← Back
Miscellaneous two family
198 LAKE AVENUE
STATEN ISLAND · Mariner's Harbor-Arlington-Graniteville · BIN 5129427
💬 Discuss this project
1999Year Built
2Stories
B9Building Class
R3AZoning
—Gross Floor Area
2Units
Miscellaneous two family · 0.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Roof3p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
UNISOLAR104/23/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CENTURION SOLAR ENERGYGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURION SOLAR ENERGY LL9475104/23/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
06/17/2025
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
S01207549-I1
04/30/2025
Permit issued — Solar
S01207549-I1-SL
04/23/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
S01207549-I1
04/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Andres Arias Londono
04/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Andres Arias Londono
04/08/2025
Special inspection requirement — Energy Code Compliance Inspections
Andres Arias Londono
04/08/2025
Special inspection requirement — Final
Andres Arias Londono
04/08/2025
Special inspection requirement — Air barrier - visual inspection
Andres Arias Londono
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offCENTURION SOLAR ENERGY04/30/2025
BISPLISSUEDRJ BRUNO INC05/17/1999
BIS—ISSUEDWEST SHORE PARK, INC.01/21/1999
1 project · most recent 04/06/2025
FiledStatusContractorScope
04/06/2025CompleteBERGER QUALITY ELEC'L CON—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/08/2025Fire-Resistant Penetrations and JointsAndres Arias Londonospecial
04/08/2025Structural Stability – Alterations of existing buildingsAndres Arias Londonospecial
04/08/2025Energy Code Compliance InspectionsAndres Arias Londonoprogress
04/08/2025FinalAndres Arias Londonoprogress
04/08/2025Air barrier - visual inspectionAndres Arias Londonoenergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026S01207549-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026S01207549-I1Open ↗
09/23/2026S01207549-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01207549-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026S01207549-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01207549-I1Open ↗