← Back
BuildNYC
Miscellaneous two family
198 LAKE AVENUE
STATEN ISLAND · BIN 5129427
💬 Discuss this project
1999Year Built
2Stories
B9Building Class
R3AZoning
—Gross Floor Area
2Units
Miscellaneous two family · 0.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofInstallation of Solar Panels on Existing Roof of Residential4p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Unisolar104/23/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Centurion Solar EnergyGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Centurion Solar Energy9475104/23/2025
Building Lifecycle
06/17/2025
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
S01207549-I1
04/30/2025
Permit issued — Solar
S01207549-I1-SL
04/23/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
S01207549-I1
04/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Andres Arias Londono
04/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Andres Arias Londono
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offCenturion Solar Energy04/30/2025
BISPLISSUEDRJ Bruno05/17/1999
BIS—ISSUEDWest Shore Park01/21/1999
1 project · most recent 04/06/2025
FiledStatusContractorScope
04/06/2025CompleteBerger Quality Electrical Con—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/08/2025Fire-Resistant Penetrations and JointsAndres Arias Londonospecial
04/08/2025Structural Stability – Alterations of existing buildingsAndres Arias Londonospecial
04/08/2025Energy Code Compliance InspectionsAndres Arias Londonoprogress
04/08/2025FinalAndres Arias Londonoprogress
04/08/2025Air barrier - visual inspectionAndres Arias Londonoenergy_progress
6 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account