DOB03/17/2020V-DOB VIOLATION - ACTIVE
DOB09/06/2019VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
DOB09/06/2019VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
DOB03/04/2019V-DOB VIOLATION - ACTIVE
DOB01/26/2018VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
DOB01/26/2018VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
DOB01/03/2017VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
DOB01/03/2017VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
DOB11/14/2016VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
DOB11/14/2016VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
DOB06/01/2016FAILURE TO PERFORM CATEGORY 5 INSPECTION
DOB10/18/2007```
DOB02/24/2001WORK WITHOUT A PERMIT. UPON INSPECTION OF ABOVE PREMISES WALLS WERE ERECTED AT 2ND & 3RD FL LEVEL CREATING SEPARATE SPACES WITH THE INSTALLATION OF DOORS. AT THE 3RD FLOOR LEVEL 3 DOORS WERE INSTALLED REMEDY: OBTAIN PERMIT OR RESTORE TO LEGAL PRIOR CONDITION
DOB10/18/1999HAZARDOUS
ECB09/02/2024FAILURE TO MAINTAIN BLDG IN A CODE-COMPLIANT MANNER. NOTED: PREMISES ENCOMPASSED ADDRESS FROM CROSS STREETS, EAGLE ST TO FREEMAN ST. PREMISES IS 200'X200'(FULL BLOCK) IN WHICH DEFECTIVE MASONRY(PARAPET) PRESENTNothing owed — awaiting certificate of correction
ECB05/07/2013FAILURE TO MAINTAIN ELEVATOR DEVICE. RESPONDENT FAILED TO PROVIDE PROPER ACCESS IN ORDER THAT THE DEPT CAN PERFORM PERIODIC INSPECTION PER 28-304.6 AND APPENDIX K OF BLDG CODE. RESPONDENT FAILED TO PROVIDENothing owed — awaiting certificate of correction
ECB05/07/2013FAILURE TO MAINTAIN ELEVATOR DEVICE. RESPONDENT FAILED TO PROVIDE PROPER ACCESS IN ORDER THAT THE DEPT CAN PERFORM PERIODIC INSPECTION PER 28-309.6 & APPENDIX OF BLDG CODE. RESPONDENT FAILED TO PROVIDE ACCESSNothing owed — awaiting certificate of correction
ECB04/25/1998OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY. C/O #218649 STATES TOTAL OCCUPANCY FACTORY AND OFFICE. NOW THE 2ND AND 3RD FLOORS HAVE BEEN CONVERTED TO RESIDENTIAL WITH. ON THE 2ND AND 3RDNothing owed — awaiting certificate of correction