Whole building & multi-floor projectsNew York City Housing AuthorityUnder Construction1 filing
REPLACE EXISTING PLUMBING EQUIPMENT AS INDICATED ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
54 documents · 11 drawing sheets
RoofNew York City Housing Authority1p · 3 filings
ArchitectureElectricalGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Plumbing · Protection and Mechanical Methods · Structural
INSTALLATION OF BETA HOIST AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2022 BC.
On file for this project
3 documents
SCOPE OF WORK INCLUDES BUT NOT BE LIMITED TO NEW RAILING INSTALLATION HORIZONTALLY TO THE PARAPET WALL AT MAIN ROOF AND MECHANICALROOM ROOF, REPLACING EXISTING STAIRS OUTSIDE THE MECHANICAL ROOM, CONCRETE AND CMU REPAIR.
On file for this project
24 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
3 documents
BulkheadNew York City Housing Authority2p · 2 filings
ArchitectureDMEquipmentGeneralMechanicalStructural
Installation of suspended scaffold for facade work and/or inspection. Amend #1 remove anchor and tr1, no anchors will be used at site
On file for this project
4 documents · 1 drawing sheet
SCOPE OF WORK INCLUDES BUT NOT BE LIMITED TO NEW RAILING INSTALLATION HORIZONTALLY TO THE PARAPET WALL AT MAIN ROOF AND MECHANICALROOM ROOF, REPLACING EXISTING STAIRS OUTSIDE THE MECHANICAL ROOM, CONCRETE AND CMU REPAIR.
On file for this project
24 documents · 1 drawing sheet
Floor 1Boiler Replacement and Hot Water HeatersUnder Construction2p · 1 filing
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing
REMOVE AND REPLACE TWO STEAM BOILERS WITH TWO HOT WATER BOILERS IN THE BOILER ROOM. REMOVE AND REPLACE ONE STEAM WATER HEATER WITH FOUR HOT WATER HEATERS IN THE BOILER ROOM.
On file for this project
31 documents · 2 drawing sheets
CellarBoiler Replacement and Hot Water HeatersUnder Construction4p · 3 filings
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Structural
REMOVE AND REPLACE TWO STEAM BOILERS WITH TWO HOT WATER BOILERS IN THE BOILER ROOM. REMOVE AND REPLACE ONE STEAM WATER HEATER WITH FOUR HOT WATER HEATERS IN THE BOILER ROOM.
On file for this project
31 documents
NYCHA BOILER- DEMOLITION AND REMOVALS OF BOILERS AND RELATED HEATING PLANT EQUIPMENT. NEW LOW PRESSURE HOT WATER BOILERS AND RELATED EQUIPMENT, AND CONNECTIONS TO BUILDING DISTRIBUTION SYSTEM.
On file for this project
17 documents
NYCHA BOILER- 1.REMOVE EXISTING STEAM INSTANTANEOUS TO HOT WATER HEATERS AND ASSOCIATED PIPING AND EQUIPMENT IN BOILER ROOM. PROVIDE NEW PACKAGED CONDENSING GAS FIRED WATER HEATERS AND STORAGE TANKS IN BOILER ROOM ALONG WITH ALL ASSOCIATED. PUMPS, PIPING
On file for this project
15 documents · 4 drawing sheets
Site & exteriorHarlem PACT Partners LLCUnder Construction13 filings
ArchitectureCivilElectricalEquipmentGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
Boiler Equipment · Construction Fence · General Construction · Mechanical Systems · Plumbing · Sidewalk Shed · Supported Scaffold
CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR FENCE INSTALLED ON SIDEWALK/ROADWAY.
On file for this project
2 documents · 4 drawing sheets
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
On file for this project
1 document · 4 drawing sheets
UPACA - SITE #5, INSTALLATION OF TEMPORARY 8 GAS PIPING AND 4 HOT / COLD WATER PIPING CONNECTED TO (2) MOBILE BOILER TRAILERS AND THE EXISTING BUILDING HEATING SYSTEM TO PROVIDE HEAT DURING THE HEATING SEASON. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
23 documents · 12 drawing sheets
Latest 3 of 13 filings on this floor.
Filed — no permit issuedTemporary heating and hot water installation2 filings · 18 docs
CivilDMGeneralMechanicalStructuralOther
NYCHA BOILER- INSTALLATION OF TEMPORARY BOILERS
On file for this project
10 documents · 12 drawing sheets
NYCHA BOILER: Tenching, Restoration, and Excavation of exterior site elements to accomodate gas service related work.
On file for this project
8 documents · 12 drawing sheets