ECB04/29/2025ATOI OBSERVED: 3 WORKERS ON CONSTRUCTION ACTIVITY CONSISTING OF DEMOLITION ALL PARTITIONS AND WORKING PLUMBING AND ALSO REMOVED ALL ELECTRICAL WIRE AND BX CABLES AND REMOVED ALSO THE ELECTRICAL PANEL BOX, AT FL$6K due
ECB10/02/2019FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35250162M ISSUED ON 02/22/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1&1RCNY 102-01.FOR WORK WITHOUT A PERMIT.REMEDY$2K due
ECB05/11/2019FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35250162M ISSUED ON 02/22/18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. WORK W/O PERMIT. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A C OF$6K due
ECB03/09/2019FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35250162M ISSUED ON 2/22/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. WORK W/O PERMIT. REMEDY:CO$6K due
ECB11/23/2018FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35250162M ISSUED ON 02/22/18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A C OF C.$2K due
ECB09/27/2018FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35250162M ISSUED ON 02/22/18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR WORK W/O A PERMIT. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE$2K due
ECB08/23/2018FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35250162M ISSUED ON 2/22/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.COMPLY WITH COMMISSIONER;$2K due
ECB07/02/2018FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35250162M ISSUED ON 02/22/18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. WORK W/O A PERMIT.(CELLAR) REMEDY: COMPLY W/COMM'S ORDER &/OR$3K due
ECB05/14/2018FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35250162M ISSUED 02/22/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. NOTE: NO DOCUMENT FILE FO$2K due
ECB05/01/2018GAS BEING SUPPLIED TO BLDG W/O INSPECTION & CERTIFICATION BY DOB. AT TIME OF MY INSPECTION I OBSERVED GAS BEING SUPPLIED TO THE BLDG W/O DOB AUTHORIZATION AFTER NEW GAS PIPING WAS INSTALLED IN THE BACK OF THE$5K due
ECB05/01/2018WORK W/O A PERMIT. AT TIME OF MY INSPECTION I OBSERVED ON THE MAIN FLOOR IN THE BACK OF THE STORE THE INSTALLATION OF NEW GAS PIPING TO A HEATING UNIT W/O A PERMIT. UTILITY COMPANY LOCKED HEAD OF SERVICE GAS$2K due
ECB05/01/2018FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. AT TIME OF MY INSPECTION,I OBSERVED IN THE CELLAR A GAS FLEX INSTALLED IN A PROHIBITED LOCATION. UTILITY COMPANY LOCKED HEAD OF SERVICE GAS VALVE & REMOVED FLE$1K due
ECB05/01/2018FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTED. AT TIME OF MY INSPECTION,I OBSERVED NEW GAS PIPING INSTALLED THAT HAVE NOT BEEN TESTED IN THE BACK OF THE STORE BY THE HEATING UNIT. UTILITY COMPANY LOCKED$2K due
ECB04/04/2018FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION, I OBSERVED AT EXP #2 STEEL DOOR HAD BEEN BEND ONTO THE BUIDING LEADING INFESTED MICE/RATS THROUGH THE OPENING. AT EXP #2 SIDEWAL$2K due
ECB02/22/2018WORK W/O A PERMIT. NOTED: IN CELLAR WOODEN 8INCH BY 8INCH WOODEN TIMBERS THROUGHOUT SUPPORTING BEAM FOR GROUND FLOOR STORE. SOME ALONG EXP#4MIDDLE OF BLDG FROM EXPOSE 1 TO 3 & ALONG EXP#2,ALSO AT EXP#1 THE SIDE$2K due
ECB02/22/2018FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: 1)SIDEWALK VAULT IN FROMT EXP#1 EXTENDS APPROX 5FFET FROMT BLDG FRONT TOWARDS STREET. APPROX 3FEET FRONT CORNER(AX 1,4)THE SIDEWALK VAULT AT STREET LEVE$500 due