← Back
Two stories - detached, small or mid-size
199-06 24 AVENUE
QUEENS · Bay Terrace-Clearview · BIN 4129831
💬 Discuss this project
1935Year Built
2.5Stories
A1Building Class
R2AZoning
1,540 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR101/23/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281101/23/2024
Building Lifecycle
All (10)Filed (1)Permit Issued (1)Signed Off (1)Objection (2)Special Inspection (5)
02/28/2025
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 17 Panels, 6.8 kW
Q00982131-I1
02/22/2024
Permit issued — Solar
Q00982131-I1-SL
02/07/2024
Objection resolved — Addressed
02/01/2024
Objection raised — Other
01/23/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 17 Panels, 6.8 kW
Q00982131-I1
12/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
12/26/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
12/26/2023
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
12/26/2023
Special inspection requirement — Final
Mina Makar
12/26/2023
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR02/22/2024
1 project · most recent 01/22/2024
FiledStatusContractorScope
01/22/2024CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/26/2023Fire-Resistant Penetrations and JointsMina Makarspecial
12/26/2023Structural Stability – Alterations of existing buildingsMina Makarspecial
12/26/2023Energy Code Compliance InspectionsMina Makarprogress
12/26/2023FinalMina Makarprogress
12/26/2023Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/23/2026Q00982131-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026Q00982131-I1Open ↗
08/28/2026Q00982131-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/23/2026Q00982131-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026Q00982131-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/23/2026Q00982131-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q00982131-I1Open ↗