← Back
Two stories - detached, small or mid-size
199-07 100 AVENUE
QUEENS · BIN 4231891
💬 Discuss this project
1940Year Built
2.5Stories
A1Building Class
R3AZoning
1,520 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · Owner of record: HAMAN REALTY CORP · 4,000 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
Floor 2Under Construction10p · 1 filing · 20 docs
Floor 1Under Construction11p · 1 filing · 20 docs
CellarUnder Construction15p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
135-223 STREET1208/29/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/14/2025$650K—— → —$428/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
D&E BUILD EVERGREEN INC.305/22/2026
PETER CHO ARCHITECTS, PLLC109/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RISHON HOMES CORPGeneral Contractor304/09/2026
SUPERIOR PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
D&E BUILD EVERGREEN I9342205/22/2026
NKM ENGINEERING PLLC6244109/22/2025
TRIANGLE INSPECTION & TES7495109/22/2025
Building Lifecycle
All (55)Filed (4)Permit Issued (4)Signed Off (2)Inspection (1)Objection (14)Special Inspection (30)
07/17/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW APPLICATION #Q01290471-I1 FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
Q01290471-S2
07/15/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/02/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW APPLICATION #Q01290471-I1 FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
Q01290471-S1
07/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Danny Chen
07/02/2026
Special inspection requirement — Electric vehicle service equipment requirements
Danny Chen
07/02/2026
Special inspection requirement — Fenestration air leakage
Danny Chen
07/02/2026
Special inspection requirement — Ventilation and air distribution system
Danny Chen
07/02/2026
Special inspection requirement — Maintenance information
Danny Chen
07/02/2026
Special inspection requirement — Air barrier — testing
Danny Chen
07/02/2026
Special inspection requirement — Insulation placement and R values
Danny Chen
07/02/2026
Special inspection requirement — Subgrade Inspections
Danny Chen
07/02/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
07/02/2026
Special inspection requirement — Heating Systems
Danny Chen
07/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Danny Chen
07/02/2026
Special inspection requirement — Masonry
Danny Chen
07/02/2026
Special inspection requirement — Concrete - Cast-In-Place
Danny Chen
07/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Danny Chen
07/02/2026
Special inspection requirement — Structural Steel - Details
Danny Chen
07/02/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Danny Chen
07/02/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Danny Chen
07/02/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Danny Chen
07/02/2026
Special inspection requirement — Mechanical Systems
Danny Chen
07/02/2026
Special inspection requirement — Structural Wood Frame
Danny Chen
07/02/2026
Special inspection requirement — Final
PETER CHO
07/02/2026
Special inspection requirement — Energy Code Compliance Inspections
Danny Chen
07/02/2026
Special inspection requirement — Footing and Foundation
Danny Chen
07/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
Danny Chen
07/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Danny Chen
07/02/2026
Special inspection requirement — Air barrier - visual inspection
Danny Chen
07/02/2026
Special inspection requirement — Interior lighting power
Danny Chen
07/02/2026
Special inspection requirement — Duct leakage testing, insulation and design
Danny Chen
07/02/2026
Special inspection requirement — Permanent certificate
Danny Chen
07/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
Danny Chen
05/22/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW APPLICATION #Q01290471-I1 FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
Q01290471-P1
02/09/2026
Permit issued — Plumbing
Q01290471-S2-PL
01/08/2026
Permit issued — Foundation
Q01290471-I1-GC-CX
01/07/2026
Permit issued — Mechanical Systems
Q01290471-I1-FO-EA
01/06/2026
Objection resolved — Addressed
12/23/2025
Objection resolved — Addressed
12/01/2025
Permit issued — Construction Fence
Q01290471-S1-FN
11/19/2025
Objection resolved — Addressed
11/19/2025
Objection resolved — Addressed
11/03/2025
Objection resolved — Addressed
11/03/2025
Objection resolved — Addressed
11/03/2025
Objection resolved — Addressed
10/23/2025
Objection raised — Admin
10/23/2025
Objection raised — Plumbing
10/22/2025
Objection raised — Zoning
10/22/2025
Objection raised — Admin
10/22/2025
Objection raised — Fire_Protection
10/22/2025
Objection raised — Zoning
10/22/2025
Objection raised — Plumbing
09/22/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW APPLICATION #Q01290471-I1 FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
Q01290471-S2
09/22/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW APPLICATION #Q01290471-I1 FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
Q01290471-S1
09/22/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW APPLICATION #Q01290471-I1 FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
Q01290471-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSUPERIOR PLUMBING & HEATI02/09/2026
DOB NOWFoundationPermit IssuedRISHON HOMES CORP01/08/2026
DOB NOWMechanical SystemsSigned-offRISHON HOMES CORP01/07/2026
DOB NOWConstruction FenceSigned-offRISHON HOMES CORP12/01/2025
1 project · most recent 05/22/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/22/2026Permit IssuedRISHON HOMES CORPAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Cooper & Hunter CH-N48LCU-230VO 46,740 BTU · Condensing Unit ×1
CH-N60LCU-230VO 60,000 BTU · Condensing Unit ×1
Heating
Cooper & Hunter CH-48AHU 48,000 BTU · Ahu ×1
CH-60AHU 60,000 BTU · Ahu ×1
Ventilation
Hampton Bay 7114-01 50 CFM · Exhaust Fan ×5
Delta Breeze SMT150 150 CFM · Exhaust Fan ×2
1 project · most recent 05/22/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/22/2026Signed-offSUPERIOR PLUMBING & HEATIGas, Storm, Water/Sanitary
1 project · most recent 08/19/2026
General Wiring
FiledStatusContractorScope
08/19/2026CompleteRONEY ELECTRIC INCGeneral Wiring
1 project · most recent 05/22/2026
Steel Wood
FiledStatusContractorScope
05/22/2026Signed-offSUPERIOR PLUMBING & HEATISteel, Wood
1 project · most recent 05/22/2026
Fence
FiledStatusContractorScope
05/22/2026Signed-offSUPERIOR PLUMBING & HEATIFence
1 project · most recent 05/22/2026
Earthwork
FiledStatusContractorScope
05/22/2026Signed-offSUPERIOR PLUMBING & HEATIEarthwork
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/15/2026Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
07/02/2026Structural Steel - High Strength BoltingDanny Chenspecial
07/02/2026Subgrade InspectionsDanny Chenspecial
07/02/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
07/02/2026Heating SystemsDanny Chenspecial
07/02/2026Fire-Resistant Penetrations and JointsDanny Chenspecial
07/02/2026MasonryDanny Chenspecial
07/02/2026Concrete - Cast-In-PlaceDanny Chenspecial
07/02/2026Structural Stability – Alterations of existing buildingsDanny Chenspecial
07/02/2026Structural Steel - DetailsDanny Chenspecial
07/02/2026Excavations - Sheeting, Shoring, and BracingDanny Chenspecial
07/02/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDanny Chenspecial
07/02/2026Mechanical SystemsDanny Chenspecial
07/02/2026Structural Wood FrameDanny Chenprogress
07/02/2026FinalPETER CHOprogress
07/02/2026Energy Code Compliance InspectionsDanny Chenprogress
07/02/2026Footing and FoundationDanny Chenprogress
07/02/2026Fire-Resistance Rated ConstructionDanny Chenprogress
07/02/2026Fenestration and door U-factor and product ratingsDanny Chenenergy_progress
07/02/2026Air barrier - visual inspectionDanny Chenenergy_progress
07/02/2026Interior lighting powerDanny Chenenergy_progress
07/02/2026Duct leakage testing, insulation and designDanny Chenenergy_progress
07/02/2026Permanent certificateDanny Chenenergy_progress
07/02/2026Insulation placement and R valuesDanny Chenenergy_progress
07/02/2026Fenestration air leakageDanny Chenenergy_progress
07/02/2026Ventilation and air distribution systemDanny Chenenergy_progress
Latest 25 of 74.
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/16/2026Q01290471-S2Request digital key ↗
08/16/2026Q01290471-S1Request digital key ↗
08/16/2026Q01290471-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/16/2026Q01290471-I1Open ↗
08/16/2026Q01290471-P1Open ↗
08/13/2026Q01290471-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01290471-I1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026Q01290471-I1Open ↗
09/23/2026Q01290471-I1Open ↗
09/23/2026Q01290471-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026Q01290471-I1Open ↗
09/23/2026Q01290471-I1Open ↗
09/01/2026Q01290471-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/16/2026Q01290471-I1Open ↗
08/16/2026Q01290471-S2Open ↗
08/16/2026Q01290471-S1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/16/2026Q01290471-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/16/2026Q01290471-I1Open ↗
08/16/2026Q01290471-P1Open ↗
08/16/2026Q01290471-S2Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/16/2026Q01290471-P1Open ↗
08/13/2026Q01290471-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01290471-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/16/2026Q01290471-P1Open ↗
08/13/2026Q01290471-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/16/2026Q01290471-P1Open ↗
08/13/2026Q01290471-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/16/2026Q01290471-I1Open ↗
08/16/2026Q01290471-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01290471-I1Open ↗