← Back
BuildNYC
One story - permanent living quarter
199-43 KENO AVENUE
QUEENS · BIN 4224286
💬 Discuss this project
1950Year Built
1.5Stories
A2Building Class
R1-2Zoning
2,143 sfGross Floor Area
1Units
1 Active Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
One story - permanent living quarter · Owner of record: MSM 777 · 12,050 sf lot · 0.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Proposed First Floor Deck3p · 1 filing · 18 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/06/2021$1.6M—Private party → MSM 777 INC$733/sf building
03/17/2017$920K—Private party → Private party$429/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Haym S. Gross, Architect310/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Britz Enterprises603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FRSS GroupGeneral Contractor403/21/2026
V P ConstructionGeneral Contractor303/21/2026
Grey Goose ElectricElectrical103/22/2026
770 ElectricGeneral Contractor103/21/2026
L&J PLG & Heating Co of NYPlumbing105/18/2018
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Rike Tech Associates2965310/24/2023
Building Lifecycle
02/09/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/31/2024
Permit renewed — General Construction
Renewed with changes
Q00863500-I1-GC-CX
11/13/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/24/2023
Filed — Alteration
application filed for a new open deck at front of existin 1 family dwelling; retaining wall and perimetter fence
Q00863500-P2
10/23/2023
Special inspection requirement — Footing and Foundation
SYED RIZVI
28 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFRSS Group01/31/2024
DOB NOWStructuralSigned-offFRSS Group05/06/2023
BISOTISSUED770 Electric03/19/2020
BISPLISSUEDL&J PLG & Heating Co of NY05/18/2018
BISMHISSUEDV.P. Construction04/18/2018
BISEQISSUEDV.P. Construction04/18/2018
BISOTISSUEDV.P. Construction04/17/2018
2 projects · most recent 03/23/2020
General Wiring
FiledStatusContractorScope
03/23/2020CompleteGrid City Electric—
05/02/2018CompleteGrey Goose ElectricGeneral Wiring
1 project · most recent 10/24/2023
Steel Concrete Masonry
FiledStatusContractorScope
10/24/2023Signed-offFRSS GroupSteel, Concrete, Masonry
1 project · most recent 10/24/2023
Earthwork
FiledStatusContractorScope
10/24/2023Signed-offFRSS GroupEarthwork
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/09/2024Pass-Final General Construction Non-Directive 14PassView ↗
11/13/2023Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
10/23/2023Footing and FoundationSYED RIZVIprogress
10/23/2023Concrete - Cast-In-PlaceSYED RIZVIspecial
10/23/2023Excavations - Sheeting, Shoring, and BracingSYED RIZVIspecial
10/23/2023Fire-Resistant Penetrations and JointsSYED RIZVIspecial
10/23/2023MasonrySYED RIZVIspecial
10/23/2023Structural Stability – Alterations of existing buildingsSYED RIZVIspecial
10/23/2023Structural Steel - DetailsSYED RIZVIspecial
10/23/2023Structural Steel - High Strength BoltingSYED RIZVIspecial
10/23/2023Subgrade InspectionsSYED RIZVIspecial
10/23/2023FinalHAYM GROSSprogress
05/26/2023Concrete - Cast-In-PlaceSYED RIZVIspecial
05/26/2023Excavations - Sheeting, Shoring, and BracingSYED RIZVIspecial
05/26/2023Fire-Resistant Penetrations and JointsSYED RIZVIspecial
05/26/2023Footing and FoundationSYED RIZVIprogress
05/26/2023MasonrySYED RIZVIspecial
05/26/2023Structural Stability – Alterations of existing buildingsSYED RIZVIspecial
05/26/2023Structural Steel - DetailsSYED RIZVIspecial
05/26/2023Structural Steel - High Strength BoltingSYED RIZVIspecial
05/26/2023Subgrade InspectionsSYED RIZVIspecial
05/26/2023FinalHAYM GROSSprogress
56 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account