← Back
Over six families without stores
199 BAY 17 STREET
BROOKLYN · Bath Beach · BIN 3168621
💬 Discuss this project
1928Year Built
4Stories
C1Building Class
R5Zoning
19,268 sfGross Floor Area
26Units
Rent Stabilized115 Open Violations 113 unresolved · 2 paperwork only ▸FDNY Report ↗
Over six families without stores · 7,688 sf lot · 2.51 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CLASSIC PTG AND REST INC103/22/2026
209 BAY 17TH ST NY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREGORY V. PEROTTO, P.E.209/19/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PEROTTO GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AURORA P & H CONT INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREGORY V. PEROTTO, P.E.947209/19/2022
Building Lifecycle
All (72)Filed (2)Permit Issued (1)Signed Off (2)Violation (60)Inspection (1)Special Inspection (6)
05/01/2026
Violation issued (HPD, closed)
A
03/11/2026
Violation issued (HPD, closed)
C
03/11/2026
Violation issued (HPD, closed)
B
03/11/2026
Violation issued (HPD, closed)
B
11/19/2025
Violation issued (HPD, closed)
I
11/17/2025
Violation issued (HPD, open)
C
11/17/2025
Violation issued (HPD, closed)
C
10/31/2025
Violation issued (HPD, open)
B
10/31/2025
Violation issued (HPD, open)
C
10/31/2025
Violation issued (HPD, open)
B
10/31/2025
Violation issued (HPD, closed)
C
07/31/2025
Violation issued (HPD, open)
C
07/31/2025
Violation issued (HPD, open)
C
06/06/2025
Violation issued (HPD, closed)
A
12/19/2023
Violation issued (HPD, open)
C
12/19/2023
Violation issued (HPD, open)
C
12/19/2023
Violation issued (HPD, open)
C
12/19/2023
Violation issued (HPD, open)
C
12/12/2023
Violation issued (HPD, closed)
A
12/12/2023
Violation issued (HPD, open)
C
12/12/2023
Violation issued (HPD, open)
A
12/12/2023
Violation issued (HPD, open)
B
12/12/2023
Violation issued (HPD, open)
C
12/12/2023
Violation issued (HPD, open)
B
12/12/2023
Violation issued (HPD, open)
B
12/12/2023
Violation issued (HPD, open)
C
12/12/2023
Violation issued (HPD, open)
A
12/12/2023
Violation issued (HPD, open)
C
12/12/2023
Violation issued (HPD, open)
C
12/12/2023
Violation issued (HPD, open)
B
12/12/2023
Violation issued (HPD, closed)
C
12/12/2023
Violation issued (HPD, open)
B
12/12/2023
Violation issued (HPD, open)
C
12/12/2023
Violation issued (HPD, open)
C
12/12/2023
Violation issued (HPD, open)
B
03/21/2023
Violation issued (HPD, closed)
A
03/20/2023
Signed off — Alteration
INSTALL NEW GAS LINE TO NEW DUAL FUEL BURNER. NEW DUAL FUEL BURNER FILED UNDER SEPARATE DOB NOW BUILD BE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08004146-I1
03/20/2023
Signed off — Alteration
B08004140-I1
02/12/2023
Violation issued (HPD, closed)
C
02/12/2023
Violation issued (HPD, open)
B
02/12/2023
Violation issued (HPD, open)
B
02/12/2023
Violation issued (HPD, open)
A
02/12/2023
Violation issued (HPD, open)
B
02/08/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/29/2022
Permit issued — Boiler Equipment
B08004140-I1-BE
09/19/2022
Filed — Alteration
INSTALL NEW GAS LINE TO NEW DUAL FUEL BURNER. NEW DUAL FUEL BURNER FILED UNDER SEPARATE DOB NOW BUILD BE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08004146-I1
09/19/2022
Filed — Alteration
B08004140-I1
09/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
09/15/2022
Special inspection requirement — Heating Systems
Gregory Perotto
09/15/2022
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Perotto
09/15/2022
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Perotto
09/15/2022
Special inspection requirement — Maintenance information
Gregory Perotto
09/15/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Gregory Perotto
02/23/2022
Violation issued (HPD, closed)
A
04/07/2021
Violation issued (HPD, closed)
A
01/08/2021
Violation issued (HPD, open)
C
12/08/2020
Violation issued (HPD, closed)
A
11/24/2020
Violation issued (HPD, open)
B
10/11/2020
Violation issued (HPD, open)
C
10/11/2020
Violation issued (HPD, open)
C
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offPETRO INC09/29/2022
BISOTISSUEDEMMA GROUP MANAGEMENT INC07/09/2015
BISOTISSUEDEROC CONSTRUCTION INC07/09/2014
BISFSISSUEDCAMBRIDGE MECH. CORP.08/30/1993
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
02/08/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
09/15/2022Fire-Resistant Penetrations and JointsGregory Perottospecial
09/15/2022Heating SystemsGregory Perottospecial
09/15/2022HVAC-R and service water heating system controlsGregory Perottoenergy_progress
09/15/2022HVAC-R and service water heating equipmentGregory Perottoenergy_progress
09/15/2022Maintenance informationGregory Perottoenergy_progress
09/15/2022HVAC-R and service water piping design and insulationGregory Perottoenergy_progress
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/28/2026B08004146-I1Request digital key ↗
08/28/2026B08004140-I1Request digital key ↗
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
07/14/2015320990157Open ↗
07/24/2014320990157Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
06/13/2014320990157Open ↗
▸Seals & Professional Certifications14
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
01/13/2017320990157Open ↗
11/30/2016320990157Open ↗
07/13/2015320990157Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026B08004140-I1Open ↗
09/23/2026B08004140-I1Open ↗
09/23/2026B08004140-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/28/2026B08004140-I1Open ↗
08/13/2026B08004146-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026B08004140-I1Open ↗
09/23/2026B08004140-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/13/2014320990157Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/13/2014320990157Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/28/2026B08004140-I1Open ↗
08/13/2026B08004146-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/13/2014320990157Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B08004140-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
01/13/2017320990157Open ↗
07/13/2015320990157Open ↗
07/24/2014320990157Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
07/13/2015320990157Open ↗
07/24/2014320990157Open ↗
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT1
01/13/2017320990157Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/13/2017320990157Open ↗
11/30/2016320990157Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/13/2014320990157Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/30/2016320990157Open ↗
06/13/2014320990157Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
06/13/2014320990157Open ↗