← Back
Elevator cooperative
Garfield North
199 GARFIELD PLACE · BIN 3020549
💬 Discuss this project
1931Year Built
4Stories
D4Building Class
R6BZoning
45,950 sfGross Floor Area
68Units
LL97 CoveredRent Stabilized11 Open Violations ▸FDNY Report ↗
Elevator cooperative · Owner of record: GARFIELD NORTH TENANTS CORP · 15,000 sf lot · 3.06 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 1 filing · 3 docs
Floor 4Under Construction2p · 1 filing · 3 docs
Floor 3Under Construction2p · 1 filing · 3 docs
Floor 2Under Construction2p · 1 filing · 3 docs
Floor 1Under Construction2p · 1 filing · 3 docs
1 job · most recent 01/30/2025
Water/Sanitary
FiledStatusContractorScope
01/30/2025——Water/Sanitary
9 jobs · most recent 12/27/2024
General Wiring
FiledStatusContractorScope
12/27/2024CompleteTITANIUM ELECTRICAL CORP1 meters, 1 new_meters
02/15/2024CompleteMACINTOSH ELECTRIC CORPGeneral Wiring
08/09/2023Permit IssuedHIGH QUALITY ELECTRIC OF—
06/28/2023CompleteS.A.L. ELECTRIC CO INC.—
07/07/2021Permit IssuedSUPER CHARGED ELEC. INC.General Wiring
02/04/2021CompleteNEKA ELECTRIC INCGeneral Wiring
07/21/2020CompleteNEKA ELECTRIC INCGeneral Wiring
12/17/2019CompleteFIRST STAR ELECTRIC INCGeneral Wiring
11/08/2019CompleteLENS ELECTRIC, INCGeneral Wiring
2 jobs · most recent 08/30/2023
Sidewalk Shed Scaffold
FiledStatusContractorScope
08/30/2023Permit IssuedAVARGA CONSTRUCTION CORPScaffold, Sidewalk Shed
02/24/2022Permit IssuedJ & G CONSTRUCTION SVCSSidewalk Shed
Building Lifecycle
All (121)Filed (12)Permit Issued (21)Signed Off (5)Violation (46)Inspection (2)Objection (28)Special Inspection (7)
07/07/2026
Permit issued — Suspended Scaffold
B01024044-I1-SC
07/02/2026
Permit issued — Sidewalk Shed
B00914631-I1-SH
04/02/2026
Permit issued — Sidewalk Shed
B00914631-I1-SH
03/27/2026
Permit issued — Supported Scaffold
B00914631-S1-SF
03/27/2026
Permit issued — General Construction
B00836141-I1-GC
12/29/2025
Violation issued (FDNY_NOV, closed)
11/19/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/11/2025
Permit issued — General Construction
B00836141-I1-GC
08/14/2025
Permit issued — Supported Scaffold
B00914631-S1-SF
08/11/2025
Permit issued — Sidewalk Shed
B00914631-I1-SH
07/01/2025
Violation issued (ECB, open)
Boilers
05/07/2025
Permit issued — Suspended Scaffold
B01024044-I1-SC
04/22/2025
Signed off — Alteration
REMOVE EXISTING KITCHEN SINK, REPLACE TUB TO SHOWER PAN, REPLACE TOILET, REPLACE SINK, ADD NEW WASHER MACHINE
B01125069-I1
02/10/2025
Permit issued — General Construction
B01125069-I1-GC
02/03/2025
Objection raised — Zoning
02/03/2025
Objection resolved — Addressed
01/30/2025
Filed — Alteration
REMOVE EXISTING KITCHEN SINK, REPLACE TUB TO SHOWER PAN, REPLACE TOILET, REPLACE SINK, ADD NEW WASHER MACHINE
B01125069-I1
01/30/2025
Filed — Alteration
REMOVE EXISTING KITCHEN SINK, REPLACE TUB TO SHOWER PAN, REPLACE TOILET, REPLACE SINK, ADD NEW WASHER MACHINE
B01125069-S1
12/10/2024
Signed off — Alteration
Installation of plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy.
B00991953-S2
12/10/2024
Signed off — Alteration
Installation of plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy.
B00991953-S1
12/10/2024
Signed off — Alteration
Installation of plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy.
B00991953-I1
12/03/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/27/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/14/2024
Permit issued — Plumbing
B00991953-S1-PL
10/09/2024
Permit issued — Mechanical Systems
B00991953-S2-MS
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/13/2024
Permit issued — Supported Scaffold
B00914631-S1-SF
08/09/2024
Permit issued — Sidewalk Shed
B00914631-I1-SH
05/06/2024
Permit issued — Suspended Scaffold
B01024044-I1-SC
04/29/2024
Objection resolved — Addressed
04/29/2024
Objection resolved — Addressed
04/25/2024
Objection resolved — Addressed
04/25/2024
Objection resolved — Addressed
04/25/2024
Objection resolved — Addressed
04/23/2024
Objection raised — Scope
04/23/2024
Objection raised — Admin
04/23/2024
Objection raised — Fire_Protection
04/23/2024
Objection raised — Mechanical
04/23/2024
Objection raised — Inspections
04/23/2024
Objection resolved — Addressed
04/23/2024
Objection resolved — Addressed
04/17/2024
Filed — Alteration
Installation of plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy.
B00991953-S2
04/17/2024
Filed — Alteration
Installation of plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy.
B00991953-S1
04/17/2024
Objection resolved — Addressed
04/17/2024
Objection resolved — Addressed
04/17/2024
Objection resolved — Addressed
04/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Loyer Hughes AIA
03/25/2024
Permit issued — Suspended Scaffold
B01024044-I1-SC
03/21/2024
Filed — Alteration
B01024044-I1
02/28/2024
Objection raised — Scope
02/28/2024
Objection raised — Scope
02/28/2024
Objection raised — Other
02/28/2024
Objection raised — Fire_Protection
02/28/2024
Objection raised — Other
02/22/2024
Filed — Alteration
Installation of plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy.
B00991953-I1
02/22/2024
Special inspection requirement — Lighting controls
Alexander Loyer Hughes AIA
02/22/2024
Special inspection requirement — Lighting in dwelling units
Alexander Loyer Hughes AIA
02/14/2024
Special inspection requirement — Final
Alexander Loyer Hughes AIA
02/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Loyer Hughes AIA
Latest 60 of 121 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EBMG2807/09/2026
AVARGA CONSTRUCTION1707/08/2026
J G CONSTRUCTION SRVCS503/22/2026
BILLY ENTERPRISES703/22/2026
NEST CONTRACTING103/22/2026
AMS MANAGEMENT CO103/22/2026
BPC MGMT CO.103/22/2026
C O ADVANCED MANAGEMENT SERVICES203/21/2026
BROWNSTONE MANAGEMENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS303/21/2026
JME BUILDING CONSULTING603/21/2026
ARCH-FORM DESIGN BUILD403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AVARGA CONSTRUCTION CORPGeneral Contractor1907/08/2026
CAMI CONSTRUCTION CORPGeneral Contractor903/21/2026
J & G CONSTRUCTION SVCSGeneral Contractor303/21/2026
MACINTOSH ELECTRIC CORPElectrical103/22/2026
SPADARO, JERRYElectrical103/21/2026
TITANIUM ELECTRICAL CORPElectrical103/22/2026
CESAR QUERYElectrical103/21/2026
GAROFALO PLMBNG & HTG LTDPlumbing107/08/2026
INTERBORO PLBG & HTG CORPElectrical103/21/2026
KANE, PAPAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KURV ARCHITECTURE DPC8428304/17/2024
FALCON ENGINEERING CO.LLC5649104/13/2023
OUTSOURCE SPECIAL INSPECT2827104/13/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedAVARGA CONSTRUCTION CORP07/07/2026
DOB NOWSidewalk ShedPermit IssuedAVARGA CONSTRUCTION CORP07/02/2026
DOB NOWSidewalk ShedPermit IssuedAVARGA CONSTRUCTION CORP04/02/2026
DOB NOWSupported ScaffoldPermit IssuedAVARGA CONSTRUCTION CORP03/27/2026
DOB NOWGeneral ConstructionPermit IssuedAVARGA CONSTRUCTION CORP03/27/2026
DOB NOWGeneral ConstructionPermit IssuedAVARGA CONSTRUCTION CORP09/11/2025
DOB NOWSupported ScaffoldPermit IssuedAVARGA CONSTRUCTION CORP08/14/2025
DOB NOWSidewalk ShedPermit IssuedAVARGA CONSTRUCTION CORP08/11/2025
DOB NOWSuspended ScaffoldPermit IssuedAVARGA CONSTRUCTION CORP05/07/2025
DOB NOWGeneral ConstructionSigned-offCAMI CONSTRUCTION CORP02/10/2025
DOB NOWPlumbingSigned-offGAROFALO PLMBNG & HTG LTD11/14/2024
DOB NOWMechanical SystemsSigned-offCAMI CONSTRUCTION CORP10/09/2024
DOB NOWSupported ScaffoldPermit IssuedAVARGA CONSTRUCTION CORP08/13/2024
DOB NOWSidewalk ShedPermit IssuedAVARGA CONSTRUCTION CORP08/09/2024
DOB NOWSuspended ScaffoldPermit IssuedAVARGA CONSTRUCTION CORP05/06/2024
DOB NOWSuspended ScaffoldPermit IssuedAVARGA CONSTRUCTION CORP03/25/2024
DOB NOWGeneral ConstructionPermit IssuedAVARGA CONSTRUCTION CORP09/11/2023
DOB NOWSupported ScaffoldPermit IssuedAVARGA CONSTRUCTION CORP08/15/2023
DOB NOWSidewalk ShedPermit IssuedAVARGA CONSTRUCTION CORP08/07/2023
DOB NOWGeneral ConstructionSigned-offCAMI CONSTRUCTION CORP05/08/2023
DOB NOWSidewalk ShedPermit IssuedJ & G CONSTRUCTION SVCS02/25/2022
BISPLISSUEDALPINE REFRIGERATION CO03/01/2021
BISPLISSUEDSUPERB PLUMBING & HEATING08/19/2020
BISOTISSUEDMETRO PROJECTS CONST INC05/28/2020
BISOTISSUEDBLUESTONE STUDIO INC01/30/2020
BISOTISSUEDBLUESTONE STUDIO INC01/30/2020
BISOTISSUEDBLUESTONE STUDIO INC01/07/2020
BISOTISSUEDBLUESTONE STUDIO INC01/07/2020
BISOTISSUEDBLUESTONE STUDIO INC01/07/2020
BISOTISSUEDNEST CONTRACTING LLC06/24/2019
BISMHISSUEDMETRO PROJECTS CONST INC06/20/2019
BISPLISSUEDGO GREENER PLUMBING LLC02/27/2019
BISPLISSUEDPLUMBING PLBG & PLBG CORP02/01/2019
BISOTISSUEDMAC GLOBAL DESIGN & RENOV01/24/2019
BISOTISSUEDMAC GLOBAL DESIGN & RENOV01/24/2019
BISOTISSUEDJONATHAN R POPE08/31/2018
BISEQISSUEDBILLY ENTERPRISES INC10/21/2015
BISOTISSUEDJOSEPH & SON RESTORATION06/24/2015
BISEQISSUEDBILLY ENTERPRISES INC06/17/2015
BISEQISSUEDBILLY ENTERPRISES INC06/17/2015
+ 9 more permits on file
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/03/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
04/17/2024Fire-Resistant Penetrations and JointsAlexander Loyer Hughes AIAspecial
02/22/2024Lighting controlsAlexander Loyer Hughes AIAenergy_progress
02/22/2024Lighting in dwelling unitsAlexander Loyer Hughes AIAenergy_progress
02/14/2024FinalAlexander Loyer Hughes AIAprogress
02/14/2024Fire-Resistant Penetrations and JointsAlexander Loyer Hughes AIAspecial
02/14/2024Energy Code Compliance InspectionsAlexander Loyer Hughes AIAprogress
04/12/2023FinalMICHAEL DERUVOprogress
▾Documents — 223 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/31/2026B00686353-I1Request digital key ↗
08/27/2026B00836141-I1Request digital key ↗
08/26/2026B00914631-S1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits45
▸BISPLAN / WORK APPROVAL APPLICATION26
04/18/2025300854804Open ↗
09/14/2022340270913Open ↗
09/08/2022340270913Open ↗
Showing 3 of 26 on file for this type
▸BISWORK PERMIT APPLICATION18
03/10/2021321784618Open ↗
02/24/2021321784618Open ↗
01/30/2020321784609Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
07/20/2018321784609Open ↗
▸Seals & Professional Certifications45
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
08/30/2019321955014Open ↗
08/30/2019321955014Open ↗
06/25/2019321955014Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026B00858569-I1Open ↗
08/27/2026B00836141-I1Open ↗
08/26/2026B00914631-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026B00858569-I1Open ↗
08/28/2026B00991953-I1Open ↗
08/28/2026B00991953-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
10/18/2015340316116Open ↗
06/16/2015340270931Open ↗
06/16/2015340270913Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
10/18/2015340316116Open ↗
06/16/2015340270931Open ↗
06/16/2015340270913Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
10/18/2015340316116Open ↗
06/16/2015340270931Open ↗
06/16/2015340270913Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/07/2026B00991953-S1Open ↗
08/28/2026B00991953-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/15/2015321144454Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
04/26/2019321738312Open ↗
04/18/2019321955014Open ↗
08/29/2018321806088Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING1
01/03/2013320695440Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
03/07/2013320695440Open ↗
▸Safety & Tenant Protection12
▸BISTenant Protection Plan and Notes9
04/26/2019321738312Open ↗
04/18/2019321955014Open ↗
08/29/2018321806088Open ↗
Showing 3 of 9 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
02/20/2018321784618Open ↗
02/20/2018321784609Open ↗
02/16/2018321784618Open ↗
▸Environmental & Asbestos12
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
06/19/2019321738312Open ↗
06/07/2019321738312Open ↗
06/07/2019321955014Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026B00991953-S1Open ↗
08/13/2026B00991953-I1Open ↗
08/13/2026B00991953-S2Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
08/30/2019321955014Open ↗
06/25/2019321955014Open ↗
06/11/2019321806088Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
07/07/2021321784609Open ↗
07/07/2021321784618Open ↗
08/11/2020321738312Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
07/07/2021321784618Open ↗
08/19/2020321738312Open ↗
08/19/2020321738312Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY12
12/25/2022340270931Open ↗
12/25/2022340270931Open ↗
12/22/2022340270931Open ↗
Showing 3 of 12 on file for this type
▸BISDOB FINAL INSPECTION REQUIRED2
11/02/2022340270913Open ↗
11/02/2022340270931Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
12/20/2022340270931Open ↗
▸Approvals, Objections & Sign-offs15
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
12/27/2022340270931Open ↗
11/10/2022340270913Open ↗
08/24/2022340316116Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER4
03/10/2021321784618Open ↗
02/24/2021321784618Open ↗
01/08/2020321784618Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL1
06/09/2022340316116Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
01/03/2013320695440Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/27/2026B00836141-I1Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT13
07/07/2021321784609Open ↗
07/07/2021321784618Open ↗
08/11/2020321738312Open ↗
Showing 3 of 13 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
08/30/2018321806088Open ↗
▸Filing & Intake Forms17
▸BISEFILING COVER SHEET7
04/26/2019321738312Open ↗
04/18/2019321955014Open ↗
08/29/2018321806088Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM4
03/10/2021321784618Open ↗
08/30/2019321955014Open ↗
06/11/2019321806088Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
06/07/2021321784618Open ↗
12/14/2018321806088Open ↗
02/16/2018321784618Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
10/18/2015340316116Open ↗
06/16/2015340270931Open ↗
06/16/2015340270913Open ↗
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
10/21/2015340316116Open ↗
10/18/2015340316116Open ↗
▸BISACCESSIBILITY WAIVER (PEO1)1
02/16/2018321784618Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
06/16/2015340270913Open ↗
▸BISALTERNATIVE MATERIALS - OTCR BUILDINGS BULLETIN1
12/20/2022340270931Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01024044-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01024044-I1Open ↗