← Back
Four families
199 GATES AVENUE
BROOKLYN · BIN 3056501
💬 Discuss this project
1930Year Built
3Stories
C3Building Class
R6BZoning
2,592 sfGross Floor Area
4Units
Rent Stabilized
Four families · Owner of record: 199 GATES AVE, LLC · 1,810 sf lot · 1.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingLandscape
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 2 filings · 6 docs
Floor 3Under Construction17p · 2 filings · 17 docs
Floor 2Under Construction19p · 3 filings · 20 docs
Floor 1Under Construction22p · 3 filings · 20 docs
CellarUnder Construction15p · 2 filings · 17 docs
Sub-BasementUnder Construction13p · 2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACE GROUP NY209/29/2026
199 GATES AVE, LLC303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EDISON PAUL CONSULTING ENGINEER, PC703/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TRIANGLE INSPECTION & TES7495303/02/2026
Building Lifecycle
All (7)Filed (7)
03/02/2026
Filed — Alteration
Interior modifications at cellar,basement, 1,2,3rd floor, to include drywall partition, drop ceiling; 10% joist replacement, sub/finish floor, skylight replacement, & address building violations, no change in egress,use, occupancy as per plan
B01161700-S1
01/14/2026
Filed — Alteration
Interior modifications at cellar,basement, 1,2,3rd floor, to include drywall partition, drop ceiling; 10% joist replacement, sub/finish floor, skylight replacement, & address building violations, no change in egress,use, occupancy as per plan
B01161700-P1
05/05/2025
Filed — Alteration
To replace with new plumbing fixtures[ w.c lav bathtub sink washer] at all floors as per plan
B01210221-I1
05/05/2025
Filed — Alteration
To install 5- Mini split heat pump for heating and cooling as per plan
B01210314-I1
01/08/2025
Filed — Alteration
Interior modifications at cellar,basement, 1,2,3rd floor, to include drywall partition, drop ceiling; 10% joist replacement, sub/finish floor, skylight replacement, & address building violations, no change in egress,use, occupancy as per plan
B01161700-I1
12/06/2024
Filed — Alteration
8'-0" high plywood fence
B01151537-I1
10/16/2024
Filed — Alteration
Building renovation , to include 15% joist replacement, interior partition modfications , drop ceiling, new finish floor , kitchen , bathrooms and heat pump units as per plans no change in use egress or occupancy is being proposed under this job filing.
B01116034-I1
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.