← Back
BuildNYC
Miscellaneous two family
199 LEWISTON STREET
STATEN ISLAND · BIN 5038999
💬 Discuss this project
1975Year Built
2Stories
B9Building Class
R3-1Zoning
2,024 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Miscellaneous two family · 3,200 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
General
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 11p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SU Architect107/11/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kale ConstructionGeneral Contractor104/09/2026
Building Lifecycle
03/30/2026
Signed off — Alteration
TO RESOLVE ECB VIO#39146891H BY RESTORING ILLEGAL CURB CUTS TO ITS PRIOR LEGAL CONDITION FILED UNDER SIGNED-OFF JOB #NB53-76. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01250954-I1
03/27/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/24/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
03/04/2026
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
03/03/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM AT SOUTH WALL IN THE 2nd BATHROOM FROM NORTH…
HPD violation · closed
20 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offKale Construction01/23/2026
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/27/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
03/24/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
2 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account