199 NORTH 5 STREET
BROOKLYN · BIN 3335711
💬 Discuss this project
1920Year Built
1Stories
M1Building Class
R6BZoning
4,290 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Church, synagogue, chapel · Owner of record: WILLIAMSBURG ON 5TH LLC · 5,700 sf lot · 0.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction35p · 4 filings · 20 docs
Floor 5Under Construction34p · 1 filing · 20 docs
Floor 4Under Construction44p · 1 filing · 20 docs
Floor 3Under Construction45p · 2 filings · 20 docs
Floor 2Under Construction64p · 2 filings · 20 docs
Floor 1Under Construction56p · 3 filings · 20 docs
CellarUnder Construction61p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
INVESTMATES3709/19/2026
NEW BEGINNINGS CHURCH OF WILLIAM503/21/2026
INVESTMATES REAL ESTATE203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/08/2025$4.3M—NEW BEGINNINGS CHURCH OF WILLIAMSBURG → WILLIAMSBURG ON 5TH LLC$1,014/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BOYD CONSULTING603/21/2026
B2 CODE CONSULTANTS2203/21/2026
SNR EXPEDITING DESIGN803/21/2026
NYC PERMIT SERVICES1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LCS RESTORATION CORPGeneral Contractor909/26/2026
ONNG INCGeneral Contractor809/19/2026
CANDID CONNECTION INCGeneral Contractor407/08/2026
ALL PRO PLBG & HTG INCPlumbing208/30/2026
RICHARD MARTINEZElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
LELIS, ARILSONElectrical103/21/2026
ALL PRO PLBG & HTG INCFire Protection108/27/2026
URBAN MASONRY&CONCRETE COGeneral Contractor108/26/2026
SERGIO GIANNACHIElectrical103/21/2026
MARTINEZ, RICHARDElectrical103/21/2026
MOSHE ROTHElectrical103/21/2026
NEU, RICHARDElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161507/24/2026
BGM ENGINEERING, LLC1514104/04/2025
CITY-WIDE TESTING INC416212/21/2020
Building Lifecycle
All (171)Filed (31)Permit Issued (21)Violation (1)Inspection (11)Objection (77)Special Inspection (30)
09/25/2026
Permit issued — Supported Scaffold
B01238206-I1-SF
09/25/2026
Permit issued — Sidewalk Shed
B01223577-I1-SH
09/18/2026
Permit issued — General Construction
B01198594-I1-GC
08/28/2026
Permit issued — Plumbing
B01198594-S5-PL
08/26/2026
Permit issued — Sprinklers
B01198594-S6-EW-SP
08/26/2026
Objection resolved — Addressed
08/26/2026
Objection resolved — Addressed
08/25/2026
Permit issued — Suspended Scaffold
B01198594-Z1-SC
08/24/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Foundation worktype
B01198594-Z1
08/19/2026
Objection raised — Cost
08/07/2026
Objection raised — Other
07/28/2026
Objection raised — Other
07/24/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Foundation worktype
B01198594-P6
07/24/2026
Objection raised — Scope
07/24/2026
Objection resolved — Resolved
07/14/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Foundation worktype
B01198594-P9
07/09/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Foundation worktype
B01198594-A1
07/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/01/2026
Special inspection requirement — Maintenance information
07/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/01/2026
Special inspection requirement — Energy Code Compliance Inspections
07/01/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
06/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SHAHRIAR QUAYYUM
06/30/2026
Special inspection requirement — Final
SHAHRIAR QUAYYUM
06/26/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/23/2026
Permit issued — Sidewalk Shed
B01223577-I1-SH
05/18/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/18/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/04/2026
Permit issued — Construction Fence
B01387735-I1-FN
04/28/2026
Filed — Alteration
INSTALLATION OF 8'-0" HT. TEMPORARY CONSTRUCTION FENCE.
B01387735-I1
03/31/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/27/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/25/2026
Objection raised — Cost
03/25/2026
Objection resolved — Addressed
03/18/2026
Permit issued — Sidewalk Shed
B01223577-I1-SH
03/16/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/13/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/10/2026
Permit issued — Supported Scaffold
B01238206-I1-SF
03/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/06/2026
Objection raised — Plumbing
03/06/2026
Objection raised — Mechanical
03/06/2026
Objection raised — Plumbing
03/06/2026
Objection raised — Plumbing
03/06/2026
Objection raised — Zoning
03/06/2026
Objection resolved — Addressed
03/03/2026
Objection raised — Cost
02/26/2026
Special inspection requirement — Insulation placement and R values
SHAHRIAR QUAYYUM
02/26/2026
Special inspection requirement — Air barrier - visual inspection
SHAHRIAR QUAYYUM
02/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
02/26/2026
Special inspection requirement — Fenestration air leakage
SHAHRIAR QUAYYUM
02/26/2026
Special inspection requirement — Fenestration areas
SHAHRIAR QUAYYUM
02/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SHAHRIAR QUAYYUM
Latest 60 of 171 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedLCS RESTORATION CORP09/25/2026
DOB NOWSidewalk ShedPermit IssuedLCS RESTORATION CORP09/25/2026
DOB NOWGeneral ConstructionPermit IssuedONNG INC09/18/2026
DOB NOWPlumbingPermit IssuedALL PRO PLBG & HTG INC08/28/2026
DOB NOWSprinklersPermit IssuedALL PRO PLBG & HTG INC08/26/2026
DOB NOWSuspended ScaffoldPermit IssuedURBAN MASONRY&CONCRETE CO08/25/2026
DOB NOWSidewalk ShedPermit IssuedLCS RESTORATION CORP06/23/2026
DOB NOWConstruction FencePermit IssuedONNG INC05/04/2026
DOB NOWSidewalk ShedPermit IssuedLCS RESTORATION CORP03/18/2026
DOB NOWSupported ScaffoldPermit IssuedLCS RESTORATION CORP03/10/2026
DOB NOWPlumbingPermit IssuedALL PRO PLBG & HTG INC02/18/2026
DOB NOWStructuralPermit IssuedONNG INC01/16/2026
DOB NOWFoundationPermit IssuedONNG INC01/16/2026
DOB NOWGeneral ConstructionPermit IssuedONNG INC12/22/2025
DOB NOWFoundationPermit IssuedONNG INC12/19/2025
DOB NOWConstruction FencePermit IssuedONNG INC12/18/2025
DOB NOWSupport of ExcavationPermit IssuedONNG INC12/04/2025
DOB NOWSupported ScaffoldPermit IssuedLCS RESTORATION CORP06/09/2025
DOB NOWSidewalk ShedPermit IssuedLCS RESTORATION CORP05/23/2025
DOB NOWConstruction FencePermit IssuedCANDID CONNECTION INC05/22/2025
DOB NOWGeneral ConstructionSigned-offCANDID CONNECTION INC05/20/2025
BISOTISSUEDNEPTUNE INC05/24/2004
BISPLISSUEDMONARCH MECH INC05/24/2004
1 project · most recent 08/24/2026
Sprinkler System
FiledStatusContractorScope
08/24/2026Permit IssuedALL PRO PLBG & HTG INCSprinkler System
2 projects · most recent 08/24/2026
Water/Sanitary Storm
FiledStatusContractorScope
08/24/2026Permit IssuedALL PRO PLBG & HTG INCStorm, Water/Sanitary
01/12/2026Permit IssuedALL PRO PLBG & HTG INCWater/Sanitary
3 projects · most recent 09/04/2026
General Wiring
FiledStatusContractorScope
09/04/2026Permit IssuedAL-LECTRIC ELECT'L CONTRG—
07/17/2026Permit IssuedB.P. ELECTRIC CORPGeneral Wiring
06/25/2025Permit IssuedRICHARD NEU—
1 project · most recent 08/24/2026
Concrete
FiledStatusContractorScope
08/24/2026Permit IssuedONNG INCConcrete
5 projects · most recent 08/24/2026
Fence Sidewalk Shed Scaffold
FiledStatusContractorScope
08/24/2026Permit IssuedONNG INCFence
04/28/2026Permit IssuedONNG INCFence
01/09/2026Permit IssuedLCS RESTORATION CORPSidewalk Shed
06/16/2025Permit IssuedONNG INCFence
06/09/2025Permit IssuedLCS RESTORATION CORPScaffold
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
07/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/26/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/18/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/18/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/31/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/16/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/13/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/13/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
07/01/2026Fire-Resistant Penetrations and Joints—special
07/01/2026HVAC-R and service water heating system controls—energy_progress
07/01/2026HVAC-R and service water piping design and insulation—energy_progress
07/01/2026Maintenance information—energy_progress
07/01/2026HVAC-R and service water heating equipment—energy_progress
07/01/2026Energy Code Compliance Inspections—progress
07/01/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
06/30/2026Structural Stability – Alterations of existing buildingsSHAHRIAR QUAYYUMspecial
06/30/2026FinalSHAHRIAR QUAYYUMprogress
03/09/2026Structural Stability – Alterations of existing buildings—special
02/26/2026Insulation placement and R valuesSHAHRIAR QUAYYUMenergy_progress
02/26/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
02/26/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
02/26/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
02/26/2026Fenestration areasSHAHRIAR QUAYYUMenergy_progress
02/26/2026Structural Stability – Alterations of existing buildingsSHAHRIAR QUAYYUMspecial
02/13/2026Post-installed AnchorsSHAHRIAR QUAYYUMspecial
02/12/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
02/10/2026HVAC-R and service water heating system controls—energy_progress
02/10/2026Fire-Resistant Penetrations and Joints—special
02/10/2026Heating Systems—special
02/10/2026Mechanical Systems—special
02/10/2026Energy Code Compliance Inspections—progress
02/10/2026Fire-Resistance Rated Construction—progress
02/10/2026Final—progress
Latest 25 of 58.
▾Documents — 187 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch31
08/22/2026B01178247-I1Request digital key ↗
08/21/2026B01223577-P1Request digital key ↗
08/21/2026B01223577-I1Request digital key ↗
Showing 3 of 31 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler1
09/02/2026B00439452-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00439452-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00439457-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION10
08/31/2021321592772Open ↗
08/26/2021321599748Open ↗
06/14/2021321592772Open ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records13
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B01198594-I1Open ↗
08/13/2026B01198594-P5Open ↗
08/13/2026B01198594-P6Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026B01198594-P6Open ↗
08/13/2026B01198594-P5Open ↗
08/13/2026B01198594-I1Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION2
11/19/2021321592772Open ↗
08/24/2021321599748Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
11/09/2021321592772Open ↗
08/27/2021321599748Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
11/19/2021321592772Open ↗
08/24/2021321599748Open ↗
▸BISZONING DIAGRAM1
11/19/2021321592772Open ↗
▸Seals & Professional Certifications55
▸DOB NOWDPL-1: Design Professional Seal & Signature33
09/02/2026B00439452-I1Open ↗
09/02/2026B00439457-I1Open ↗
08/22/2026B01178247-I1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/19/2026B01198594-S2Open ↗
09/02/2026B01198594-S6Open ↗
09/01/2026B01198594-S3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/19/2026B01198594-S2Open ↗
09/01/2026B01198594-S3Open ↗
09/01/2026B01198594-P5Open ↗
Showing 3 of 9 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B01198594-P6Open ↗
08/13/2026B01198594-P5Open ↗
08/13/2026B01198594-I1Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
11/09/2021321592772Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
11/09/2021321592772Open ↗
▸Safety & Tenant Protection4
▸BISANTI-HARASSMENT AREA CHECKLIST2
11/09/2021321592772Open ↗
08/27/2021321599748Open ↗
▸BISSTREET TREE CHECKLIST1
11/09/2021321592772Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01198594-I1Open ↗
▸Environmental & Asbestos22
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
08/21/2026B01181900-I1Open ↗
08/19/2026B01344557-P1Open ↗
08/18/2026B01198594-P7Open ↗
Showing 3 of 22 on file for this type
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
11/19/2021321592772Open ↗
11/09/2021321592772Open ↗
07/22/2021321592772Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY6
11/19/2021321592772Open ↗
11/19/2021321592772Open ↗
11/19/2021321592772Open ↗
Showing 3 of 6 on file for this type
▸BISSOIL REPORT1
11/09/2021321592772Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
11/19/2021321592772Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSCHEDULE A - OCCUPANCY / USE1
02/04/2021321592772Open ↗
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION9
11/09/2021321592772Open ↗
11/09/2021321592772Open ↗
08/27/2021321599748Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET2
08/20/2020321592772Open ↗
08/20/2020321592772Open ↗
▸Other Documents21
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
11/19/2021321592772Open ↗
11/19/2021321592772Open ↗
08/27/2021321599748Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification4
08/18/2026B01198594-P5Open ↗
08/14/2026B01198594-P6Open ↗
08/14/2026B01198594-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM3
11/09/2021321592772Open ↗
02/12/2021321599748Open ↗
02/12/2021321599748Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B01198594-P6Open ↗
08/13/2026B01198594-P5Open ↗
08/13/2026B01198594-I1Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026B01198594-P6Open ↗
08/13/2026B01198594-I1Open ↗
08/13/2026B01198594-P5Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
11/09/2021321592772Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01198594-S1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B00909926-I1Open ↗