Two family converted from one family
199 ST JOHNS PLACE
BROOKLYN · BIN 3024392
💬 Discuss this project
1881Year Built
3Stories
B3Building Class
R7BZoning
3,744 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 2,000 sf lot · 1.87 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction13p · 4 filings · 20 docs
Floor 3Under Construction14p · 4 filings · 20 docs
Floor 2Under Construction13p · 3 filings · 20 docs
Floor 1
CellarUnder Construction16p · 5 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/24/2020$3.4M—— → —$900/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHARLES G. MICHEL ENGINEERING, PC.507/17/2026
SOLK ARCHITECTURE PLLC207/16/2026
MARTOS ENGINEERING302/18/2026
CWB ARCHITECTS502/23/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING1603/21/2026
EC BUILDING CONSULTANTS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
E.L. CONTRACTING INCGeneral Contractor807/08/2026
CONSTRUCTION BROOKLYN INCGeneral Contractor407/08/2026
ARCON PLBG SOLUTIONSPlumbing307/08/2026
FOCUS ELECTRICAL INCElectrical103/22/2026
HANUKA ELYAGUOVElectrical103/21/2026
BLAZE PLUMBING & HEATINGPlumbing109/18/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHRISTIAN L. MARTOS ENGIN5965302/18/2026
THE BROOKLYN STUDIO OF AR2684108/19/2022
CHARLES G MICHEL ENGINEER2871108/25/2021
FRAME DESIGN AND CONSTRUC7971107/26/2021
Building Lifecycle
All (92)Filed (15)Permit Issued (11)Signed Off (3)Violation (2)Inspection (10)Objection (25)Special Inspection (26)
09/21/2026
Special inspection requirement — Final
Charles Michel
09/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANA ACCETTA
09/21/2026
Special inspection requirement — Mechanical Systems
Charles Michel
09/17/2026
Permit issued — Plumbing
B01354726-I1-PL
09/17/2026
Objection resolved — Addressed
08/14/2026
Objection raised — Scope
08/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/10/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/17/2026
Filed — Alteration
Installation of plumbing fixtures and related piping as shown on drawings. No change to occupancy use or egress.
B01354726-P1
07/17/2026
Filed — Alteration
Installation of new mechanical system and related piping as shown on drawings. No change to occupancy use or egress.
B01354743-P1
07/17/2026
Special inspection requirement — Final
LEAH SOLK
07/16/2026
Filed — Alteration
INTERIOR RENOVATIONS TO 2ND AND 3RD FLOORS OF AN EXISTING 2-FAMILY ROW HOUSE. PARTITION WORKAND INSTALLATION OF NEW FINISHES AND MILLWORK IN AREAS OF WORK. PLUMBING, MECHANICAL, AND STRUCTURAL WORK TO BE FILED UNDER SEPARATE APPLICATIONS.
B01354719-P1
07/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/29/2026
Special inspection requirement — Mechanical Systems
06/29/2026
Special inspection requirement — Final
06/29/2026
Special inspection requirement — Final
LEAH SOLK
06/05/2026
Permit issued — General Construction
B01354719-I1-GC
06/05/2026
Permit issued — Structural
B01355277-I1-ST
06/03/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/28/2026
Permit issued — General Construction
B01354719-I1-GC
04/27/2026
Permit issued — Structural
B01355277-I1-ST
04/10/2026
Objection resolved — Addressed
04/10/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/23/2026
Objection resolved — Addressed
03/23/2026
Objection resolved — Addressed
02/20/2026
Objection raised — Structural
02/20/2026
Objection raised — Cost
02/20/2026
Objection raised — Inspections
02/20/2026
Objection raised — Plumbing
02/20/2026
Objection raised — Fire_Protection
02/20/2026
Objection raised — Inspections
02/20/2026
Objection raised — Zoning
02/20/2026
Objection raised — Mechanical
02/20/2026
Objection raised — Cost
02/20/2026
Objection raised — Mechanical
02/18/2026
Filed — Alteration
B01355277-I1
02/09/2026
Filed — Alteration
Installation of new mechanical system and related piping as shown on drawings. No change to occupancy use or egress.
B01354743-I1
02/09/2026
Filed — Alteration
Installation of plumbing fixtures and related piping as shown on drawings. No change to occupancy use or egress.
B01354726-I1
02/06/2026
Filed — Alteration
INTERIOR RENOVATIONS TO 2ND AND 3RD FLOORS OF AN EXISTING 2-FAMILY ROW HOUSE. PARTITION WORKAND INSTALLATION OF NEW FINISHES AND MILLWORK IN AREAS OF WORK. PLUMBING, MECHANICAL, AND STRUCTURAL WORK TO BE FILED UNDER SEPARATE APPLICATIONS.
B01354719-I1
04/25/2025
Signed off — Alteration
B00531168-I1
03/10/2025
Signed off — Alteration
MECHANICAL WORK PROPOSED FOR AN EXISTING TWO FAMILY HOME.
B00532583-I1
02/19/2025
Signed off — Alteration
STRUCTURAL WORK FOR AN EXISTING TWO FAMILY HOME
B00531199-I1
10/06/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/29/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/05/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Water Test
Certified
View inspection ↗
08/15/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/01/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/23/2023
Filed — Alteration
REMOVAL AND RELOCATION OF PLUMBING FIXTURES AND RELATED PIPING AS PER PLANS.
B00531183-P2
11/14/2022
Permit issued — Mechanical Systems
B00532583-I1-MS
11/14/2022
Permit issued — General Construction
B00531168-I1-GC
08/19/2022
Filed — Alteration
B00531168-P1
08/19/2022
Special inspection requirement — Chimneys and vents
SURESH WARREN
08/19/2022
Special inspection requirement — Final
SURESH WARREN
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBLAZE PLUMBING & HEATING09/17/2026
DOB NOWGeneral ConstructionPermit IssuedCONSTRUCTION BROOKLYN INC06/05/2026
DOB NOWStructuralPermit IssuedCONSTRUCTION BROOKLYN INC06/05/2026
DOB NOWGeneral ConstructionPermit IssuedCONSTRUCTION BROOKLYN INC04/28/2026
DOB NOWStructuralPermit IssuedCONSTRUCTION BROOKLYN INC04/27/2026
DOB NOWMechanical SystemsSigned-offEL CONTRACTING INC11/14/2022
DOB NOWGeneral ConstructionSigned-offEL CONTRACTING INC11/14/2022
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS02/11/2022
DOB NOWMechanical SystemsSigned-offEL CONTRACTING INC11/29/2021
DOB NOWGeneral ConstructionSigned-offEL CONTRACTING INC11/29/2021
DOB NOWStructuralSigned-offEL CONTRACTING INC11/23/2021
1 project · most recent 07/17/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/17/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NLHZ 4 tons · Condensing Unit ×2
Ventilation
Fantech FR150 150 CFM · Exhaust Fan ×4
FG 4XL EC 100 CFM · Exhaust Fan ×1
Pennbarry DX08S 120 CFM · Exhaust Fan ×2
2 projects · most recent 07/17/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/17/2026Permit IssuedBLAZE PLUMBING & HEATINGGas, Water/Sanitary
02/23/2023Signed-offDONATO PLUMBING, INCGas, Water/Sanitary
1 project · most recent 02/13/2023
General Wiring
FiledStatusContractorScope
02/13/2023CompleteFOCUS ELECTRICAL INCGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/10/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/03/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/06/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/29/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/05/2023Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
08/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/01/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/26/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/25/2022Fail-Final PL - Up to 9 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
09/21/2026FinalCharles Michelprogress
09/21/2026Fire-Resistant Penetrations and JointsANA ACCETTAspecial
09/21/2026Mechanical SystemsCharles Michelspecial
08/14/2026Fire-Resistant Penetrations and Joints—special
07/17/2026FinalLEAH SOLKprogress
06/29/2026Fire-Resistant Penetrations and Joints—special
06/29/2026Fire-Resistant Penetrations and Joints—special
06/29/2026Mechanical Systems—special
06/29/2026Final—progress
06/29/2026FinalLEAH SOLKprogress
08/19/2022Chimneys and ventsSURESH WARRENspecial
08/19/2022FinalSURESH WARRENprogress
08/19/2022Fire-Resistance Rated ConstructionSURESH WARRENprogress
08/19/2022Fire-Resistant Penetrations and JointsSURESH WARRENspecial
07/28/2022Fire-Resistance Rated ConstructionBRENDAN COBURNprogress
07/28/2022FinalBRENDAN COBURNprogress
07/28/2022Fire-Resistant Penetrations and JointsBRENDAN COBURNspecial
07/28/2022Chimneys and ventsBRENDAN COBURNspecial
01/27/2022Structural Steel - DetailsChristian Martosspecial
01/27/2022Structural Steel - WeldingChristian Martosspecial
01/27/2022FinalChristian Martosprogress
01/27/2022Structural Wood FrameChristian Martosprogress
01/27/2022MasonryChristian Martosspecial
01/27/2022Post-installed AnchorsChristian Martosspecial
01/27/2022Structural Stability – Alterations of existing buildingsChristian Martosspecial
Latest 25 of 26.
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
09/01/2026B00531183-P2Request digital key ↗
09/01/2026B00531183-P1Request digital key ↗
09/01/2026B00531183-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits12
▸DOB NOWLPC Approval/Permit12
08/18/2026B01354719-P1Open ↗
08/18/2026B01354743-P1Open ↗
08/18/2026B01354726-P1Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/01/2026B00531168-P1Open ↗
09/01/2026B00531168-I1Open ↗
09/01/2026B00532583-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/23/2026B01354743-I1Open ↗
09/12/2026B01354719-P1Open ↗
08/29/2026B00531168-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026B01354743-I1Open ↗
09/23/2026B01354743-I1Open ↗
08/29/2026B00531168-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/01/2026B00531168-I1Open ↗
09/01/2026B00531168-P1Open ↗
08/18/2026B01354719-P1Open ↗
Showing 3 of 15 on file for this type
▸Other Documents6
▸DOB NOWProof of Historic Building6
08/18/2026B01354719-P1Open ↗
08/18/2026B01354743-P1Open ↗
08/18/2026B01354726-P1Open ↗
Showing 3 of 6 on file for this type