ECB07/12/200651/6A CLEAVER BROOKS HIGH PRESSURE BOILER. 6A)FRONT SAFETY VALVE DID NOT LIFT AT THE SET PRESSURE OF 150 P.S.I. BUT IT LIFTED AT 180 PSI.Nothing owed — awaiting certificate of correction
ECB08/19/200450 CLEAVER BROOKS 1989 N.B. 66911 50A PLATFORM SHALL BE INSTALL AT THEEND OF STEAM DRUM TO PERMIT SAFE ACCESS TO THE INTERIOR OF THE DRUMS FOR CLEANOUTS AND INSPECTION AS PER NEW YORK STATE CODE R.14-1.10Nothing owed — awaiting certificate of correction
ECB08/19/200450 50) A PLATFORM SHALL BE INSTALLED AT THE END OF THE STEAM DRUM TO PERMIT SAFE ACCESS TO THE INTERIOR OF THE DRUMS FOR CLEANOUTS AND INSPECTION AS PER NEW YORK STATE CODE R14-1.10Nothing owed — awaiting certificate of correction
ECB08/19/200450 CLEAVER BROOK N.B. 67088. 50) A PLATFORM SHALL BE INSTALLED AT THE END OF THE STEAM DRUM TO PERMIT SAFE ACCESS TO THE INTERIOR OF THE DRUMS FOR CLEANOUTS AND INSPECTION AS PER NEW YORK STATE CODE R14-1.10Nothing owed — awaiting certificate of correction
Miscellaneous utility property · Owner of record: NYC TRANSIT AUTHORITY · 716,404 sf lot · 0.5 FAR built · Flood zone X