2 Open Violations 1 unresolved · 1 paperwork only▸
DOB06/19/2013FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB03/28/2013WORK W/O A PERMIT. APPROX 20'X 15' X 10' EXTENSION ERECTED AT REAR 1STFLOOR. RMDY: OBTAIN PERMIT OR RESTORE TO PRIOR LEGAL CONDITIONS.Nothing owed — awaiting certificate of correction
Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.