← Back
Shopping center, with or without parking
Bruckner Commons
1998 BRUCKNER BOULEVARD · BIN 2094834
💬 Discuss this project
1965Year Built
2Stories
K6Building Class
C4-1Zoning
330,240 sfGross Floor Area
21Units
LL97 Covered1 Open Violation ▸
Shopping center, with or without parking · Owner of record: VNO BRUCKNER PLAZA LLC · 593,357 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Roof4p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
URBAN EDGE PROPERTIES5409/13/2026
VNO BRUCKNER PLAZA403/22/2026
BRUCKNER PLAZA ASSOC403/21/2026
UE BRUCKNER PLAZA603/21/2026
BRUCKNER ASSOC503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK DESIGN ARCHITECTS, LLP406/15/2026
MURDOCH ENGINEERING205/13/2026
VINCENT J. LIOTTA P.E.101/20/2026
GEMINI ENGINEERING GROUP207/02/2025
LINK LAB107/02/2025
CARUSO TURLEY SCOTT, INC106/28/2025
HC ARCHITECT, PC303/14/2022
NORMAN C. LOK, PE811/22/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JP EXPEDITE603/21/2026
LOUIS STRIAR1603/21/2026
JAM CONSULTANTS, INC.803/21/2026
GREAT NECK SIGNS INC DBA MINEOLA203/21/2026
NEW YORK DESIGN ARCHITECT LLP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SIGNSTAR NYCScaffold807/08/2026
RIDGE CONSTRUCTION CORPGeneral Contractor307/08/2026
R.W. DAKE & CO.,INCGeneral Contractor303/21/2026
FULTON PLBG & HTG CORPPlumbing307/08/2026
SIGNS CADScaffold307/08/2026
ALPHONSE, MICHAELElectrical203/21/2026
PEREIRA, WESLLEYElectrical203/21/2026
ROBERT S. COVELLOElectrical203/22/2026
L S SIGNScaffold207/08/2026
STAN LYUBOMUDROVElectrical103/21/2026
SIS IXPATAC, FELIPEElectrical103/21/2026
AFGO MECHANICAL SVCS INCGeneral Contractor107/08/2026
ACEVEDO, ERNESTElectrical103/21/2026
BLUEWATER PLBG& HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AKS ARCHITECTURAL & ENGIN1957205/21/2026
VINCENT J. LIOTTA P. E.1974101/20/2026
CATALPA SPECIAL INSPECTIO2004207/02/2025
Building Lifecycle
All (100)Filed (22)Permit Issued (20)Signed Off (19)Violation (4)Inspection (5)Special Inspection (30)
07/28/2026
Signed off — Alteration
APPLICATION IS FILED FOR AN ALTERATION FOR AN EXISTING RETAIL SPACE TO INSTALL 1 NEW GREASE TRAP, NEW WASTE LINE PIPING AND WATER SUPPLY LINES AS NECESSARY.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00949334-I1
06/15/2026
Filed — Alteration
APPLICATION IS FILED FOR AN ALTERATION FOR AN EXISTING RETAIL SPACE TO INSTALL 1 NEW GREASE TRAP, NEW WASTE LINE PIPING AND WATER SUPPLY LINES AS NECESSARY.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00949334-P1
06/09/2026
Signed off — Alteration
REPLACEMENT OF LLUMINATED DOUBLE-SIDED HEADER PYLON SIGN FILED UNDER JOB# X00004400 - IN PROPERTY LINES - BRUCKNER COMMONS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
X01366005-I1
05/26/2026
Signed off — Alteration
APPLICATION IS FILED FOR AN ALT OF AN EXISTING RETAIL SPACE, INCLUDING NEW NON-LOAD BEARING PARTITIONS,FINISHES, LIGHTING,SIGNAGE DRIVE-THRU COMPONENTS,NEW HVAC & DUCTWORK THROUGHOUT& ALL OTHER RELATED WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCU
X00949257-I1
05/22/2026
Special inspection requirement — Ventilation and air distribution system
Giuseppe Anzalone
05/22/2026
Special inspection requirement — Interior lighting power
Giuseppe Anzalone
05/22/2026
Special inspection requirement — Lighting controls
Giuseppe Anzalone
05/22/2026
Special inspection requirement — Air barrier - visual inspection
Giuseppe Anzalone
05/22/2026
Special inspection requirement — Maintenance information
Giuseppe Anzalone
05/22/2026
Special inspection requirement — Insulation placement and R values
Giuseppe Anzalone
05/22/2026
Special inspection requirement — Shutoff dampers
Giuseppe Anzalone
05/22/2026
Special inspection requirement — Duct leakage testing, insulation and design
Giuseppe Anzalone
05/22/2026
Special inspection requirement — Final
Giuseppe Anzalone
05/22/2026
Special inspection requirement — Energy Code Compliance Inspections
Giuseppe Anzalone
05/22/2026
Special inspection requirement — Mechanical Systems
Giuseppe Anzalone
05/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Giuseppe Anzalone
05/21/2026
Filed — Alteration
APPLICATION IS FILED FOR AN ALT OF AN EXISTING RETAIL SPACE, INCLUDING NEW NON-LOAD BEARING PARTITIONS,FINISHES, LIGHTING,SIGNAGE DRIVE-THRU COMPONENTS,NEW HVAC & DUCTWORK THROUGHOUT& ALL OTHER RELATED WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCU
X00949257-P1
05/21/2026
Permit issued — Sign
X01366005-I1-SG
05/13/2026
Filed — Alteration
REPLACEMENT OF LLUMINATED DOUBLE-SIDED HEADER PYLON SIGN FILED UNDER JOB# X00004400 - IN PROPERTY LINES - BRUCKNER COMMONS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
X01366005-I1
05/08/2026
Special inspection requirement — Insulation placement and R values
Giuseppe Anzalone
05/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Giuseppe Anzalone
05/08/2026
Special inspection requirement — Mechanical Systems
Giuseppe Anzalone
05/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Giuseppe Anzalone
05/08/2026
Special inspection requirement — Final
Giuseppe Anzalone
05/08/2026
Special inspection requirement — Interior lighting power
Giuseppe Anzalone
05/08/2026
Special inspection requirement — Air barrier - visual inspection
Giuseppe Anzalone
05/08/2026
Special inspection requirement — Shutoff dampers
Giuseppe Anzalone
05/08/2026
Special inspection requirement — Duct leakage testing, insulation and design
Giuseppe Anzalone
05/08/2026
Special inspection requirement — Ventilation and air distribution system
Giuseppe Anzalone
05/08/2026
Special inspection requirement — Lighting controls
Giuseppe Anzalone
05/08/2026
Special inspection requirement — Maintenance information
Giuseppe Anzalone
03/30/2026
Signed off — Alteration
TMOBILE-- PLUMBING MODIFICATIONS AND INSTALLATION IN CONJUNCTION WITH RETAIL RENOVATION.
X01217700-S1
03/24/2026
Signed off — Alteration
TMOBILE-- PLUMBING MODIFICATIONS AND INSTALLATION IN CONJUNCTION WITH RETAIL RENOVATION.
X01217700-I1
03/24/2026
Signed off — Alteration
TMOBILE-- STRUCTURAL SUPPORT FOR HUNG EQUIPMENT IN CONJUNCTION WITH RETAIL RENOVATION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X01217741-I1
03/19/2026
Signed off — Alteration
TMOBILE-- PLUMBING MODIFICATIONS AND INSTALLATION IN CONJUNCTION WITH RETAIL RENOVATION.
X01217700-S2
02/05/2026
Signed off — Alteration
REPLACEMENT
X01348265-I1
01/21/2026
Permit issued — Mechanical Systems
X01348265-I1-MS
01/20/2026
Filed — Alteration
REPLACEMENT
X01348265-I1
01/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Liotta
01/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Liotta
01/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
01/20/2026
Special inspection requirement — Maintenance information
Vincent Liotta
01/19/2026
Special inspection requirement — Final
Vincent Liotta
01/19/2026
Special inspection requirement — Mechanical Systems
Vincent Liotta
11/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/15/2025
Permit issued — Plumbing
X01217700-S2-PL
07/09/2025
Permit issued — Structural
X01217741-I1-ST
07/09/2025
Permit issued — General Construction
X01217700-I1-GC
07/09/2025
Permit issued — Mechanical Systems
X01217700-S1-MS
07/02/2025
Filed — Alteration
TMOBILE-- PLUMBING MODIFICATIONS AND INSTALLATION IN CONJUNCTION WITH RETAIL RENOVATION.
X01217700-S1
07/02/2025
Filed — Alteration
TMOBILE-- PLUMBING MODIFICATIONS AND INSTALLATION IN CONJUNCTION WITH RETAIL RENOVATION.
X01217700-I1
07/02/2025
Filed — Alteration
TMOBILE-- PLUMBING MODIFICATIONS AND INSTALLATION IN CONJUNCTION WITH RETAIL RENOVATION.
X01217700-S2
06/28/2025
Filed — Alteration
TMOBILE-- STRUCTURAL SUPPORT FOR HUNG EQUIPMENT IN CONJUNCTION WITH RETAIL RENOVATION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X01217741-I1
06/20/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/19/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/27/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/03/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/24/2024
Permit issued — Plumbing
X00949334-I1-PL
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offL.S. SIGN CO., INC05/21/2026
DOB NOWMechanical SystemsSigned-offAFGO MECHANICAL SVCS01/21/2026
DOB NOWPlumbingSigned-offFULTON PLBG & HTG CORP07/15/2025
DOB NOWStructuralSigned-offRIDGE CONSTRUCTION CORP07/09/2025
DOB NOWGeneral ConstructionSigned-offRIDGE CONSTRUCTION CORP07/09/2025
DOB NOWMechanical SystemsSigned-offRIDGE CONSTRUCTION CORP07/09/2025
DOB NOWPlumbingSigned-offBLUEWATER PLBG& HTG INC04/24/2024
DOB NOWMechanical SystemsSigned-offR.W. DAKE & CO.,INC04/05/2024
DOB NOWSignSigned-offSIGNS CAD CORP03/15/2022
DOB NOWSignSigned-offSIGNS CAD CORP03/15/2022
DOB NOWSignSigned-offSIGNS CAD CORP03/15/2022
DOB NOWSignPermit IssuedTRU-ART SIGN CO. INC03/12/2018
DOB NOWSignSigned-offSIGNSTAR NYC11/28/2017
DOB NOWSignSigned-offSIGNSTAR NYC11/28/2017
DOB NOWSignSigned-offSIGNSTAR NYC11/28/2017
DOB NOWSignSigned-offSIGNSTAR NYC11/28/2017
DOB NOWSignSigned-offSIGNSTAR NYC11/27/2017
DOB NOWSignSigned-offSIGNSTAR NYC11/27/2017
DOB NOWSignSigned-offSIGNSTAR NYC11/27/2017
DOB NOWSignSigned-offSIGNSTAR NYC11/27/2017
BISOTISSUEDSIGNS CAD CORP03/17/2022
BISPLISSUEDVILLAGE P & H NY INC03/15/2021
BISPLISSUEDMC CREADY & RICE PLBG INC.05/21/2019
BISOTISSUEDCAPITOL AWNING CO INC11/22/2017
BISPLISSUEDVILLAGE P & H NY INC11/21/2017
BISFPISSUEDRELIABLE FIRE PROT. INC10/24/2017
BISPLISSUEDR.J.C. MECHANICAL CORP10/02/2017
BISOTISSUEDTORC, INC09/27/2017
BISOTISSUEDLAKEVIEW CONSTRUCTION INC.09/20/2017
BISMHISSUEDLAKEVIEW CONSTRUCTION INC.09/20/2017
BISOTISSUEDDEMARTINO CONSTR. CO. INC09/15/2017
BISMHISSUEDDEMARTINO CONSTR. CO. INC09/15/2017
BISOTISSUEDDEMARTINO CONSTR. CO. INC09/15/2017
BISOTISSUEDLAKEVIEW CONSTRUCTION INC.07/12/2017
BISMHISSUEDLAKEVIEW CONSTRUCTION INC.07/12/2017
BISPLISSUEDVILLAGE P & H NY INC05/04/2017
BISOTISSUEDDEMARTINO CONSTR. CO. INC05/01/2017
BISOTISSUEDDEMARTINO CONSTR. CO. INC05/01/2017
BISMHISSUEDDEMARTINO CONSTR. CO. INC05/01/2017
BISEQISSUEDDEMARTINO CONSTR. CO. INC05/01/2017
+ 24 more permits on file
1 project · most recent 06/15/2026
Water/Sanitary
FiledStatusContractorScope
06/15/2026Signed-offBLUEWATER PLBG& HTG INCWater/Sanitary
12 projects · most recent 07/11/2025
General Wiring
FiledStatusContractorScope
07/11/2025CompleteLEBO ELECTRIC LLCGeneral Wiring
05/07/2024Permit IssuedMAXIMUM ELECTRIC CORP.General Wiring
05/13/2022CompleteSIGNS CAD CORP—
05/13/2022CompleteSIGNS CAD CORP—
05/13/2022CompleteSIGNS CAD CORP—
06/11/2018CompleteROBERT S. COVELLO—
04/26/2018CompleteROBERT S. COVELLO—
02/06/2018CompleteROBERT S. COVELLO—
02/06/2018CompleteROBERT S. COVELLO—
02/06/2018CompleteROBERT S. COVELLO—
02/06/2018CompleteROBERT S. COVELLO—
02/06/2018CompleteROBERT S. COVELLO—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/03/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
05/22/2026Ventilation and air distribution systemGiuseppe Anzaloneenergy_progress
05/22/2026Interior lighting powerGiuseppe Anzaloneenergy_progress
05/22/2026Lighting controlsGiuseppe Anzaloneenergy_progress
05/22/2026Air barrier - visual inspectionGiuseppe Anzaloneenergy_progress
05/22/2026Maintenance informationGiuseppe Anzaloneenergy_progress
05/22/2026Insulation placement and R valuesGiuseppe Anzaloneenergy_progress
05/22/2026Shutoff dampersGiuseppe Anzaloneenergy_progress
05/22/2026Duct leakage testing, insulation and designGiuseppe Anzaloneenergy_progress
05/22/2026FinalGiuseppe Anzaloneprogress
05/22/2026Energy Code Compliance InspectionsGiuseppe Anzaloneprogress
05/22/2026Mechanical SystemsGiuseppe Anzalonespecial
05/22/2026Fire-Resistant Penetrations and JointsGiuseppe Anzalonespecial
05/08/2026Insulation placement and R valuesGiuseppe Anzaloneenergy_progress
05/08/2026Fire-Resistant Penetrations and JointsGiuseppe Anzalonespecial
05/08/2026Mechanical SystemsGiuseppe Anzalonespecial
05/08/2026Energy Code Compliance InspectionsGiuseppe Anzaloneprogress
05/08/2026FinalGiuseppe Anzaloneprogress
05/08/2026Interior lighting powerGiuseppe Anzaloneenergy_progress
05/08/2026Air barrier - visual inspectionGiuseppe Anzaloneenergy_progress
05/08/2026Shutoff dampersGiuseppe Anzaloneenergy_progress
05/08/2026Duct leakage testing, insulation and designGiuseppe Anzaloneenergy_progress
05/08/2026Ventilation and air distribution systemGiuseppe Anzaloneenergy_progress
05/08/2026Lighting controlsGiuseppe Anzaloneenergy_progress
05/08/2026Maintenance informationGiuseppe Anzaloneenergy_progress
01/20/2026HVAC-R and service water heating system controlsVincent Liottaenergy_progress
Latest 25 of 41.
▾Documents — 383 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
08/26/2026X00001545-I1Request digital key ↗
08/26/2026X00001550-I1Request digital key ↗
08/26/2026X00001552-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits85
▸BISPLAN / WORK APPROVAL APPLICATION50
03/14/2022240315770Open ↗
03/29/2021200115428Open ↗
03/29/2021200115419Open ↗
Showing 3 of 50 on file for this type
▸BISWORK PERMIT APPLICATION30
03/17/2022240315770Open ↗
03/19/2021220587728Open ↗
05/22/2019240152295Open ↗
Showing 3 of 30 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
03/16/2021240152295Open ↗
01/27/2021200115419Open ↗
01/26/2021200115428Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications104
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION34
04/08/2019220587728Open ↗
09/17/2018220615699Open ↗
04/25/2018220597058Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/26/2026X00001545-I1Open ↗
08/26/2026X00001550-I1Open ↗
08/26/2026X00001552-I1Open ↗
Showing 3 of 22 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT15
03/14/2022240315770Open ↗
11/24/2017220626384Open ↗
09/19/2017220615699Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
12/18/2019240152295Open ↗
01/04/2019220587728Open ↗
08/08/2018240152295Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/23/2026X01348265-I1Open ↗
09/23/2026X01348265-I1Open ↗
09/19/2026X01217741-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026X01348265-I1Open ↗
08/28/2026X01217700-S1Open ↗
08/25/2026X01217700-I1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
03/14/2022240315770Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
03/14/2022240315770Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment18
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE11
01/22/2018220615699Open ↗
12/07/2017220615699Open ↗
11/24/2017220587728Open ↗
Showing 3 of 11 on file for this type
▸BISEQUIPMENT USE PERMITS2
02/07/2024240152295Open ↗
06/01/2021240152295Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
02/07/2024240152295Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
02/02/2018220620148Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
03/16/2021240152295Open ↗
▸BISPLUMBING (PL) SIGNOFF1
02/09/2021220620148Open ↗
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos31
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
08/26/2026X00001545-I1Open ↗
08/26/2026X00001550-I1Open ↗
08/26/2026X00001552-I1Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
10/10/2017220620148Open ↗
09/19/2017220615699Open ↗
09/15/2017220615332Open ↗
Showing 3 of 14 on file for this type
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
01/04/2019220587728Open ↗
09/17/2018220615699Open ↗
04/25/2018220597058Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
06/07/2022240315770Open ↗
03/14/2022240315770Open ↗
03/16/2021240152295Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
09/17/2018220615699Open ↗
04/25/2018220597058Open ↗
03/23/2018220597058Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
03/14/2022240315770Open ↗
Showing 1 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/07/2022240315770Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY8
06/07/2022240315770Open ↗
08/09/2021220560943Open ↗
08/08/2021220561032Open ↗
Showing 3 of 8 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
03/14/2022240315770Open ↗
▸Approvals, Objections & Sign-offs26
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST23
06/08/2022240315770Open ↗
08/09/2021220560943Open ↗
08/08/2021220561032Open ↗
Showing 3 of 23 on file for this type
▸BISSUPERSEDING LETTER2
05/22/2019240152295Open ↗
04/19/2018220597058Open ↗
▸BISMECHANICAL (MH) SIGNOFF1
02/09/2021220620148Open ↗
▸Cost, Insurance & Ownership29
▸BISCOST AFFIDAVIT28
03/14/2022240315770Open ↗
08/09/2021220560943Open ↗
08/08/2021220561032Open ↗
Showing 3 of 28 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
06/07/2022240315770Open ↗
▸Filing & Intake Forms36
▸BISEFILING COVER SHEET15
11/24/2017220626384Open ↗
10/10/2017220620148Open ↗
09/19/2017220615699Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION10
12/18/2019240152295Open ↗
10/15/2019240152295Open ↗
01/04/2019220587728Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM9
03/19/2021220587728Open ↗
12/17/2019240152295Open ↗
09/17/2018220615699Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
03/14/2022240315770Open ↗
Showing 1 of 2 on file for this type
▸Other Documents1
▸BISACCESSIBILITY WAIVER (PEO1)1
11/21/2017220587728Open ↗