← Back
Bungalow colony - cooperatively owned land
1A EDGEWATER PARK
BRONX · BIN 2095972
💬 Discuss this project
1925Year Built
1Stories
A8Building Class
R4AZoning
53,169 sfGross Floor Area
39Units
LL97 Covered8 Open Violations 5 unresolved · 3 paperwork only ▸
Bungalow colony - cooperatively owned land · Owner of record: EDGEWATER PARK OWNER CO · 103,500 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC105/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor105/29/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272105/21/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
05/28/2026
Permit issued — Solar
X01405322-I1-SL
05/21/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01405322-I1
05/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
05/21/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
05/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
05/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
05/20/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC05/28/2026
1 project · most recent 05/21/2026
FiledStatusContractorScope
05/21/2026CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 05/21/2026
FiledStatusContractorScope
05/21/2026Signed-offSUNRUN INSTALLATION SVC9 panels, 4.05 kw, 189.19 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/21/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
05/21/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
05/20/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
05/20/2026Energy Code Compliance InspectionsWalid Abdullaprogress
05/20/2026FinalWalid Abdullaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026X01405322-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026X01405322-I1Open ↗
08/28/2026X01405322-I1Open ↗
08/28/2026X01405322-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026X01405322-I1Open ↗
08/28/2026X01405322-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026X01405322-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026X01405322-I1Open ↗