← Back
One story - permanent living quarter
2-25 148 STREET
QUEENS · BIN 4101719
💬 Discuss this project
1965Year Built
1Stories
A2Building Class
R2AZoning
2,504 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
One story - permanent living quarter · 5,500 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingOther
Roof1p · 1 filing · 5 docs
Floor 221p · 2 filings · 20 docs
Floor 120p · 3 filings · 20 docs
Cellar20p · 1 filing · 20 docs
1 job · most recent 02/12/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/12/2025Permit Issued212 RENOVATIONS GROUP LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Samsung AM060MXMDCH/AA 60,000 BTU · Vrf Outdoor ×1
1 job · most recent 09/03/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/03/2025Signed-offWAWEL PLBG AND HTG CORPGas, Storm, Water/Sanitary
2 jobs · most recent 07/11/2024
General Wiring
FiledStatusContractorScope
07/11/2024CompleteNY CITY ELECTRIC INCGeneral Wiring
03/21/2023Permit IssuedFSM ELECTRICAL CORPORATIOGeneral Wiring
Building Lifecycle
All (79)Filed (15)Permit Issued (16)Signed Off (5)Violation (3)Inspection (4)Objection (6)Special Inspection (30)
01/07/2026
Signed off — Alteration
Q07998259-I1
11/28/2025
Signed off — Alteration
Q08027710-I1
09/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
CARL HAMANN
09/04/2025
Special inspection requirement — Maintenance information
CARL HAMANN
09/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
CARL HAMANN
09/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
09/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
CARL HAMANN
09/03/2025
Filed — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q08021199-P5
08/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
CARL HAMANN
08/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
CARL HAMANN
08/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
CARL HAMANN
08/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
08/08/2025
Special inspection requirement — Maintenance information
CARL HAMANN
04/29/2025
Filed — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q08021199-P4
04/23/2025
Special inspection requirement — Maintenance information
CARL HAMANN
04/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
CARL HAMANN
04/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
CARL HAMANN
04/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
CARL HAMANN
04/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
02/26/2025
Objection raised — Scope
02/26/2025
Objection resolved — Addressed
02/26/2025
Special inspection requirement — Air barrier — testing
CARL HAMANN
02/26/2025
Special inspection requirement — Interior lighting power
CARL HAMANN
02/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
CARL HAMANN
02/26/2025
Special inspection requirement — Fenestration air leakage
CARL HAMANN
02/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
02/26/2025
Special inspection requirement — Final
CARL HAMANN
02/26/2025
Special inspection requirement — Fenestration areas
CARL HAMANN
02/26/2025
Special inspection requirement — Permanent certificate
CARL HAMANN
02/26/2025
Special inspection requirement — Concrete - Cast-In-Place
CARL HAMANN
02/26/2025
Special inspection requirement — Maintenance information
CARL HAMANN
02/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
CARL HAMANN
02/26/2025
Special inspection requirement — Ventilation and air distribution system
CARL HAMANN
02/26/2025
Special inspection requirement — Mechanical Systems
CARL HAMANN
02/26/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
CARL HAMANN
02/26/2025
Special inspection requirement — Insulation placement and R values
CARL HAMANN
02/24/2025
Filed — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q08021199-P3
02/12/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
RENOVATION OF 1 FAMILY HOUSE ON CELLAR, 1ST AND 2ND FLOOR AS PER PLANS FILED HEREWITH, NEW PORCH IN THE REAR. NEW CERTIFICATE OF OCCUPANCY REQUIRED.
Q00800625-P2
01/20/2025
Filed — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q08021199-P2
10/01/2024
Permit issued — Plumbing
Q08021199-I1-PL
09/24/2024
Permit issued — Mechanical Systems
Q00800625-I1-GC-CX
06/25/2024
Permit issued — Construction Fence
Q08027710-I1-FN
05/23/2024
Signed off — Alteration
Structural work as per plans filed herewith. No change in use, egress and occupancy.
Q00864352-I1
05/21/2024
Permit issued — General Construction
Q07998259-I1-GC
04/29/2024
Permit issued — Plumbing
Q08021199-I1-PL
04/15/2024
Filed — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q08021199-P1
04/10/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
RENOVATION OF 1 FAMILY HOUSE ON CELLAR, 1ST AND 2ND FLOOR AS PER PLANS FILED HEREWITH, NEW PORCH IN THE REAR. NEW CERTIFICATE OF OCCUPANCY REQUIRED.
Q00800625-P1
09/13/2023
Permit issued — Mechanical Systems
Q00800625-I1-GC-CX
09/05/2023
Violation issued (ECB, closed)
Construction
08/16/2023
Permit issued — Mechanical Systems
Q00800625-S1-MS
08/14/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
RENOVATION OF 1 FAMILY HOUSE ON CELLAR, 1ST AND 2ND FLOOR AS PER PLANS FILED HEREWITH, NEW PORCH IN THE REAR. NEW CERTIFICATE OF OCCUPANCY REQUIRED.
Q00800625-S1
07/31/2023
Objection resolved — Addressed
07/26/2023
Objection raised — Zoning
07/14/2023
Objection resolved — Addressed
06/20/2023
Permit issued — General Construction
Q07998259-I1-GC
06/20/2023
Permit issued — Construction Fence
Q08027710-I1-FN
06/20/2023
Permit issued — Structural
Q00864352-I1-ST
06/07/2023
Objection raised — Zoning
06/01/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
RENOVATION OF 1 FAMILY HOUSE ON CELLAR, 1ST AND 2ND FLOOR AS PER PLANS FILED HEREWITH, NEW PORCH IN THE REAR. NEW CERTIFICATE OF OCCUPANCY REQUIRED.
Q00800625-I1
05/30/2023
Signed off — Alteration
WORK FILED TO SHOW EXCAVATION AND NEW SLAB CONSTRUCTION ON CELLAR LEVEL IN 1 FAMILY HOUSE.NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00825648-I1
Latest 60 of 79 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
212 RENOVATIONS GROUP203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/13/2022$1.1M—— → —$449/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAMANN ENGINEERING, PLLC1409/03/2025
MJ ENGINEERING & DESIGN104/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BIG ORANGE EXPEDITING3003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
212 RENOVATIONS GROUP LLCGeneral Contractor2107/08/2026
WAWEL PLBG AND HTG CORPPlumbing307/08/2026
NY CITY ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HAMANN ENGINEERING, PLLC49491209/03/2025
MJ ENGINEERING & DESIGN5546104/26/2023
STRUCT. ENGINEERING INTEG4174203/07/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWAWEL PLBG AND HTG CORP10/01/2024
DOB NOWMechanical SystemsPermit Issued212 RENOVATIONS GROUP LLC09/24/2024
DOB NOWConstruction FenceSigned-off212 RENOVATIONS GROUP LLC06/25/2024
DOB NOWGeneral ConstructionSigned-off212 RENOVATIONS GROUP LLC05/21/2024
DOB NOWPlumbingSigned-offWAWEL PLBG AND HTG CORP04/29/2024
DOB NOWMechanical SystemsPermit Issued212 RENOVATIONS GROUP LLC09/13/2023
DOB NOWMechanical SystemsPermit Issued212 RENOVATIONS GROUP LLC08/16/2023
DOB NOWGeneral ConstructionSigned-off212 RENOVATIONS GROUP LLC06/20/2023
DOB NOWConstruction FenceSigned-off212 RENOVATIONS GROUP LLC06/20/2023
DOB NOWStructuralSigned-off212 RENOVATIONS GROUP LLC06/20/2023
DOB NOWStructuralSigned-off212 RENOVATIONS GROUP LLC05/04/2023
DOB NOWPlumbingSigned-offWAWEL PLBG AND HTG CORP04/25/2023
DOB NOWSupport of ExcavationSigned-off212 RENOVATIONS GROUP LLC03/14/2023
DOB NOWFoundationSigned-off212 RENOVATIONS GROUP LLC03/14/2023
DOB NOWGeneral ConstructionSigned-off212 RENOVATIONS GROUP LLC12/19/2022
DOB NOWConstruction FenceSigned-off212 RENOVATIONS GROUP LLC12/14/2022
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/04/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/04/2023Certified Gas-Gas-Piping-UndergroundCertifiedView ↗
05/04/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/04/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 77
DateRequirementInspectorRole
09/04/2025HVAC-R and service water heating system controlsCARL HAMANNenergy_progress
09/04/2025HVAC-R and service water heating equipmentCARL HAMANNenergy_progress
09/04/2025HVAC-R and service water piping design and insulationCARL HAMANNenergy_progress
09/04/2025Fire-Resistant Penetrations and JointsCARL HAMANNspecial
09/04/2025Maintenance informationCARL HAMANNenergy_progress
08/08/2025Fire-Resistant Penetrations and JointsCARL HAMANNspecial
08/08/2025HVAC-R and service water heating system controlsCARL HAMANNenergy_progress
08/08/2025HVAC-R and service water heating equipmentCARL HAMANNenergy_progress
08/08/2025Maintenance informationCARL HAMANNenergy_progress
08/08/2025HVAC-R and service water piping design and insulationCARL HAMANNenergy_progress
04/23/2025HVAC-R and service water heating equipmentCARL HAMANNenergy_progress
04/23/2025Maintenance informationCARL HAMANNenergy_progress
04/23/2025Fire-Resistant Penetrations and JointsCARL HAMANNspecial
04/23/2025HVAC-R and service water piping design and insulationCARL HAMANNenergy_progress
04/23/2025HVAC-R and service water heating system controlsCARL HAMANNenergy_progress
02/26/2025Heating SystemsCARL HAMANNspecial
02/26/2025MasonryCARL HAMANNspecial
02/26/2025Concrete - Cast-In-PlaceCARL HAMANNspecial
02/26/2025Exterior Insulation and Finish Systems (EIFS)CARL HAMANNspecial
02/26/2025Fire-Resistant Penetrations and JointsCARL HAMANNspecial
02/26/2025FinalCARL HAMANNprogress
02/26/2025Mechanical SystemsCARL HAMANNspecial
02/26/2025HVAC-R and service water piping design and insulationCARL HAMANNenergy_progress
02/26/2025Maintenance informationCARL HAMANNenergy_progress
02/26/2025Fenestration areasCARL HAMANNenergy_progress
Latest 25 of 77.
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/25/2026Q08027710-I1Request digital key ↗
08/25/2026Q07998259-I1Request digital key ↗
08/25/2026Q00825648-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00800625-P1Open ↗
08/13/2026Q00800625-P2Open ↗
08/13/2026Q00800625-I1Open ↗
▸Seals & Professional Certifications52
▸DOB NOWProgress Inspector Seal & Signature19
09/25/2026Q00800625-I1Open ↗
09/25/2026Q00800625-I1Open ↗
09/25/2026Q00800625-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/25/2026Q00800625-I1Open ↗
09/25/2026Q00800625-I1Open ↗
09/02/2026Q00864352-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/25/2026Q08027710-I1Open ↗
08/22/2026Q08021199-I1Open ↗
08/22/2026Q08021199-P5Open ↗
Showing 3 of 15 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00800625-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/22/2026Q08021199-P2Open ↗
08/22/2026Q08021199-I1Open ↗
08/22/2026Q08021199-P5Open ↗
Showing 3 of 12 on file for this type
▸Inspections & Test Reports4
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026Q00825654-I1Open ↗
08/13/2026Q00825648-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00825648-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q00825648-I1Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial3
08/13/2026Q00800625-P2Open ↗
08/13/2026Q00800625-I1Open ↗
08/13/2026Q00800625-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00800625-I1Open ↗
08/13/2026Q00800625-P1Open ↗
08/13/2026Q00800625-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/20/2026Q00800625-I1Open ↗
08/20/2026Q00800625-P1Open ↗
08/15/2026Q00800625-P2Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00825648-I1Open ↗
08/13/2026Q00825654-I1Open ↗