← Back
Two family frame
2-25 BEACH 97 STREET
QUEENS · Rockaway Beach-Arverne-Edgemere · BIN 4535854
💬 Discuss this project
2002Year Built
3Stories
B2Building Class
R5BZoning
—Gross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Two family frame · 1.28 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
225 BEACH 97 STREET107/11/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC107/01/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TIMOTHY COLEMANElectrical203/21/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/11/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272107/01/2026
Building Lifecycle
All (12)Filed (1)Permit Issued (1)Violation (5)Special Inspection (5)
07/10/2026
Permit issued — Solar
Q01424608-I1-SL
07/01/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01424608-I1
07/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
07/01/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
06/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
06/30/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
06/30/2026
Special inspection requirement — Final
Walid Abdulla
04/22/2026
Violation issued (HPD, closed)
B
03/04/2025
Violation issued (HPD, open)
I
03/03/2025
Violation issued (HPD, closed)
C
03/03/2025
Violation issued (HPD, closed)
C
03/03/2025
Violation issued (HPD, closed)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC07/10/2026
BIS—ISSUEDROSEMILL LL C07/11/2002
BISEQISSUEDROSEMILL LL C07/08/2002
BISPLISSUEDTRI CITY MECHANICAL GROUP CORP05/17/2002
BISEQISSUEDROSEMILL LL C03/21/2002
BIS—ISSUEDROSEMILL LL C03/21/2002
1 project · most recent 07/01/2026
FiledStatusContractorScope
07/01/2026CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 07/01/2026
FiledStatusContractorScope
07/01/2026Signed-offSUNRUN INSTALLATION SVC12 panels, 5.4 kw, 252.28 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/01/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
07/01/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
06/30/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
06/30/2026Energy Code Compliance InspectionsWalid Abdullaprogress
06/30/2026FinalWalid Abdullaprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026Q01424608-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026Q01424608-I1Open ↗
08/24/2026Q01424608-I1Open ↗
08/24/2026Q01424608-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026Q01424608-I1Open ↗
08/24/2026Q01424608-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026Q01424608-I1Open ↗