← Back
Large suburban residence
2-80 149 PLACE
QUEENS · BIN 4463962
💬 Discuss this project
2003Year Built
2Stories
A3Building Class
R2Zoning
3,200 sfGross Floor Area
1Units
Large suburban residence · 4,000 sf lot · 0.8 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AMERICAN DREAM BUILDERS903/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/15/2022$1.3M—Private party → Private party$394/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RICHARD H BALSER, P.E.106/24/2024
CLIP ARCHITECTS207/13/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MODERN BUILDING CONSULTANT203/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JZ CONSTRUCTION GROUP INCGeneral Contractor403/22/2026
JEFFREY MARINELLOElectrical203/21/2026
ISLAND ELECTRIC CORP 004835General Contractor103/22/2026
JOHN PETTISGeneral Contractor103/21/2026
JOHN PETTISGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RICHARD H. BALSER ENGINEE3028106/24/2024
GREAT WALL CONSULTANT P.E5633207/13/2022
Building Lifecycle
All (21)Filed (3)Permit Issued (2)Signed Off (2)Inspection (2)Objection (4)Special Inspection (8)
01/31/2025
Signed off — Alteration
PERGOLA INSTALLATION IN REAR YARD AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q01066041-I1
01/10/2025
Permit issued — General Construction
Q01066041-I1-GC
12/06/2024
Objection resolved — Addressed
07/15/2024
Objection resolved — Addressed
07/03/2024
Objection raised — Zoning
07/03/2024
Objection raised — Scope
06/24/2024
Filed — Alteration
PERGOLA INSTALLATION IN REAR YARD AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q01066041-I1
06/20/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Balser Richard
06/20/2024
Special inspection requirement — Post-installed Anchors
Balser Richard
06/13/2024
Special inspection requirement — Final
Balser Richard
06/13/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Balser Richard
04/25/2023
Signed off — Alteration
Proposed interior renovation on 2nd floor for existing 1 family building as per plan. No change in use, egress, or occupancy.
Q00662297-I1
08/01/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/27/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/18/2022
Special inspection requirement — Energy Code Compliance Inspections
Jaeyoung Jang
07/18/2022
Special inspection requirement — Fire-Resistance Rated Construction
Jaeyoung Jang
07/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiong Wei Wu
07/18/2022
Special inspection requirement — Interior lighting power
Jaeyoung Jang
07/13/2022
Filed — Alteration
Proposed interior renovation on 2nd floor for existing 1 family building as per plan. No change in use, egress, or occupancy.
Q00662297-P1
02/14/2022
Permit issued — General Construction
Q00662297-I1-GC
02/09/2022
Filed — Alteration
Proposed interior renovation on 2nd floor for existing 1 family building as per plan. No change in use, egress, or occupancy.
Q00662297-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJOHN PETTIS01/10/2025
DOB NOWGeneral ConstructionSigned-offJZ CONSTRUCTION GROUP INC02/14/2022
BISOTISSUEDEMPOWER CES LLC01/30/2023
BISEQISSUEDAMERICAN DREAM BLDRS CORP03/24/2004
BIS—ISSUEDAMERICAN DREAM BLDRS CORP03/24/2004
BISPLISSUEDZARA PLUMBING CORP01/21/2004
BISEQISSUEDAMERICAN DREAM BLDRS CORP01/13/2004
BIS—ISSUEDAMERICAN DREAM BLDRS CORP01/13/2004
1 project · most recent 03/25/2023
FiledStatusContractorScope
03/25/2023CompleteISLAND ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/01/2022Pass-Final General Construction Non-Directive 14PassView ↗
07/27/2022Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
06/20/2024Alternative Materials - OTCR Buildings Bulletin NumberBalser Richardspecial
06/20/2024Post-installed AnchorsBalser Richardspecial
06/13/2024FinalBalser Richardprogress
06/13/2024Structural Stability – Alterations of existing buildingsBalser Richardspecial
07/18/2022Energy Code Compliance InspectionsJaeyoung Jangprogress
07/18/2022Fire-Resistance Rated ConstructionJaeyoung Jangprogress
07/18/2022Fire-Resistant Penetrations and JointsXiong Wei Wuspecial
07/18/2022Interior lighting powerJaeyoung Jangenergy_progress
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026Q00662297-P1Request digital key ↗
08/26/2026Q00662297-I1Request digital key ↗
08/22/2026Q01066041-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
01/25/2023440766556Open ↗
▸BISWORK PERMIT APPLICATION1
01/30/2023440766556Open ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026Q00662297-I1Open ↗
08/25/2026Q00662297-I1Open ↗
08/25/2026Q00662297-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/25/2026Q00662297-I1Open ↗
08/23/2026Q01066041-I1Open ↗
08/23/2026Q01066041-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/26/2026Q00662297-I1Open ↗
08/26/2026Q00662297-P1Open ↗
08/13/2026Q01066041-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/25/2023440766556Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
01/26/2023440766556Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01066041-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
06/14/2023440766556Open ↗
01/25/2023440766556Open ↗
01/25/2023440766556Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/14/2023440766556Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
01/25/2023440766556Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
06/14/2023440766556Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00662297-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
06/14/2023440766556Open ↗
01/25/2023440766556Open ↗
01/25/2023440766556Open ↗
▸Approvals, Objections & Sign-offs2
▸BISFINAL ELECTRICAL SIGNOFF1
06/16/2023440766556Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/16/2023440766556Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT (FINAL): PW31
06/14/2023440766556Open ↗
▸BISCOST AFFIDAVIT1
01/25/2023440766556Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
01/25/2023440766556Open ↗
▸Other Documents1
▸BISTax Abatement Miscellaneous1
06/16/2023440766556Open ↗