2 EAST 88TH STREET
MANHATTAN · BIN 1046925
💬 Discuss this project
1930Year Built
14Stories
D4Building Class
R10Zoning
58,110 sfGross Floor Area
14Units
LL97 CoveredRent Stabilized3 Active Violations 2 unresolved · 1 paperwork only 1 old, status unconfirmed ▸FISP: SAFE
Elevator cooperative · Owner of record: Fifth & 88 · 5,110 sf lot · 11.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofZetlin & De Chiara LLP74p · 5 filings · 20 docs
BulkheadInstallation of hoist mast and spandrel beams1p · 1 filing · 20 docs
PenthouseUnit PH2114p · 7 filings · 20 docs
Floor 17Zetlin & De Chiara LLP13p · 2 filings · 20 docs
Floor 16Zetlin & De Chiara LLP13p · 2 filings · 20 docs
Floor 15Zetlin & De Chiara LLP13p · 3 filings · 20 docs
Floor 14Zetlin & De Chiara LLP177p · 8 filings · 20 docs
Floor 13
Floor 12Installation of hoist mast and spandrel beams1p · 1 filing · 20 docs
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3Installation of hoist mast and spandrel beamsUnder Construction16p · 2 filings · 20 docs
Floor 2
Floor 1Plywood fence installation18p · 3 filings · 20 docs
CellarInstallation of hoist mast and spandrel beams8p · 2 filings · 20 docs
Sub-BasementTemporary shoring installation4p · 1 filing · 9 docs
Site & exteriorFacade work101p · 8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Fifth & 88th3003/22/2026
Jerrick Associates603/21/2026
5th & 63rd Street603/21/2026
Benenson Capital Partners403/21/2026
Zetlin & de Chiara103/22/2026
Brown, Harris, Stevens103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Reis EYGeneral Contractor2707/08/2026
Arsenal ScaffoldScaffold2107/08/2026
Empire NY InstallationsScaffold1007/08/2026
Juno ContractingGeneral Contractor603/21/2026
Donato PlumbingPlumbing507/08/2026
Streamline USAGeneral Contractor407/08/2026
Alphacraft Construction*General Contractor404/09/2026
Arsenal Scaffoldspecialty_contractor407/08/2026
D Reis ContractingGeneral Contractor307/08/2026
Velocity Plumbing & HeatingPlumbing208/26/2026
Banner ElectricElectrical203/21/2026
Bedrock Plumbing & HeatingPlumbing107/08/2026
Top Notch ElectricElectrical103/22/2026
Fred Smith P&H CoPlumbing107/08/2026
Star Electrical ContractorsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates4232201/05/2026
Jspecs9429305/30/2025
KZ Engineering4665905/16/2025
Beyond Arch3600206/14/2024
Jack Green Associates422211/15/2023
Chen Engineering Services1826208/30/2022
Building Lifecycle
All (265)Filed (56)Permit Issued (61)Signed Off (19)Facade (FISP) (12)Violation (43)Inspection (14)Objection (30)Special Inspection (30)
08/12/2026
Permit issued — Plumbing
M01209081-S1-PL
06/01/2026
Signed off — Alteration
Plumbing work inconjunction with Alteration
M00656736-I1
05/14/2026
Signed off — Alteration
Mechanical work in conjunction with Alt 1
M00656701-I1
05/01/2026
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M00977083-I1
05/01/2026
Signed off — Alteration
Structural work in conjunction with GC
M00703655-I1
05/01/2026
Signed off — Alteration
INSTALLATION OF 12' HIGH TEMPORARY PLYWOOD FENCE ENCLOSURE FOR STAIRCASE TO ACCESS TOP OF SHED AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
M01080527-I1
04/28/2026
Signed off — Alteration
Installation of temporary shoring per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00899604-I1
04/27/2026
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M08049639-I1
04/24/2026
Signed off — Alteration
Shoring and Bracing for steel modifications.
M00940310-I1
04/20/2026
Signed off — Alteration
Installation of temporary material hoist and its runback structure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00895981-I1
04/17/2026
Permit issued — Structural
M00899604-I1-ST
04/17/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/07/2026
Permit issued — Mechanical Systems
M00656701-I1-MS
03/27/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/25/2026
Filed — Alteration
Plumbing work inconjunction with Alteration
M00656736-P5
03/23/2026
Inspection — Fail-Final PL - More than 10 Requested Floors
Fail
View inspection ↗
03/19/2026
Permit issued — Sidewalk Shed
M00977083-I1-SH
03/12/2026
Permit issued — Protection and Mechanical Methods
M00895981-I1-PMM
03/10/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/04/2026
Filed — Alteration
Plumbing work inconjunction with Alteration
M00656736-P4
02/19/2026
Permit issued — Plumbing
M00656736-I1-PL
01/28/2026
Permit issued — General Construction
M01209081-I1-GC
01/28/2026
Permit issued — Mechanical Systems
M01209081-S2-MS
01/05/2026
Filed — Alteration
Plumbing work inconjunction with Alteration
M00656736-P3
01/05/2026
Filed — Alteration
Mechanical work in conjunction with Alt 1
M00656701-P2
01/05/2026
Special inspection requirement — Post-installed Anchors
Young Suh
01/05/2026
Special inspection requirement — Mechanical Systems
Young Suh
01/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
01/05/2026
Special inspection requirement — Final
Young Suh
12/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
12/19/2025
Special inspection requirement — Final
Young Suh
12/19/2025
Special inspection requirement — Post-installed Anchors
Young Suh
12/19/2025
Special inspection requirement — Mechanical Systems
Young Suh
12/04/2025
Permit issued — Sidewalk Shed
M00977083-I1-SH
12/04/2025
Permit issued — General Construction
M00703628-I1-GC
11/21/2025
Permit issued — General Construction
M00656025-I1-GC
11/21/2025
Permit issued — Structural
M00703655-I1-ST
10/03/2025
Filed — Alteration
INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M00977083-P1
09/09/2025
Signed off — Alteration
Mechanical work file in conjunction with doctor's office renovation on the first floor.
M01040691-S2
09/09/2025
Signed off — Alteration
Mechanical work file in conjunction with doctor's office renovation on the first floor.
M01040691-I1
09/09/2025
Signed off — Alteration
Mechanical work file in conjunction with doctor's office renovation on the first floor.
M01040691-S1
09/04/2025
Permit issued — General Construction
M01209081-I1-GC
09/04/2025
Permit issued — Plumbing
M01209081-S1-PL
09/04/2025
Permit issued — Mechanical Systems
M01209081-S2-MS
07/29/2025
Signed off — Alteration
Installation of temporary material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01098936-I1
06/30/2025
Permit issued — Construction Fence
M01080527-I1-FN
06/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/24/2025
Objection resolved — Addressed
06/24/2025
Objection resolved — Addressed
06/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
HOPE DANA
06/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
HOPE DANA
06/16/2025
Special inspection requirement — Maintenance information
HOPE DANA
06/16/2025
Special inspection requirement — Shutoff dampers
HOPE DANA
06/16/2025
Special inspection requirement — Energy Code Compliance Inspections
HOPE DANA
06/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
HOPE DANA
06/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
06/13/2025
Objection raised — Energy
06/13/2025
Objection resolved — Addressed
06/13/2025
Objection resolved — Addressed
06/11/2025
Permit issued — Construction Fence
M01080527-I1-FN
Latest 60 of 265 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedVelocity Plumbing & Heating08/12/2026
DOB NOWStructuralSigned-offArsenal Scaffold04/17/2026
DOB NOWMechanical SystemsSigned-offReis EY04/07/2026
DOB NOWSidewalk ShedSigned-offArsenal Scaffold03/19/2026
DOB NOWProtection and Mechanical MethodsSigned-offArsenal Scaffold03/12/2026
DOB NOWPlumbingSigned-offDonato Plumbing02/19/2026
DOB NOWGeneral ConstructionPermit IssuedAlphacraft Construction*01/28/2026
DOB NOWMechanical SystemsPermit IssuedAlphacraft Construction*01/28/2026
DOB NOWSidewalk ShedSigned-offArsenal Scaffold12/04/2025
DOB NOWGeneral ConstructionSigned-offReis EY12/04/2025
DOB NOWGeneral ConstructionSigned-offReis EY11/21/2025
DOB NOWStructuralSigned-offReis EY11/21/2025
DOB NOWGeneral ConstructionPermit IssuedAlphacraft Construction*09/04/2025
DOB NOWPlumbingPermit IssuedVelocity Plumbing & Heating09/04/2025
DOB NOWMechanical SystemsPermit IssuedAlphacraft Construction*09/04/2025
DOB NOWConstruction FenceSigned-offArsenal Scaffold06/30/2025
DOB NOWConstruction FenceSigned-offArsenal Scaffold06/11/2025
DOB NOWSupported ScaffoldSigned-offArsenal Scaffold05/28/2025
DOB NOWStructuralSigned-offArsenal Scaffold04/14/2025
DOB NOWMechanical SystemsSigned-offReis EY04/07/2025
DOB NOWGeneral ConstructionSigned-offReis EY03/21/2025
DOB NOWPlumbingSigned-offDonato Plumbing02/21/2025
DOB NOWProtection and Mechanical MethodsSigned-offArsenal Scaffold01/16/2025
DOB NOWGeneral ConstructionSigned-offReis EY12/18/2024
DOB NOWStructuralSigned-offReis EY12/18/2024
DOB NOWStructuralSigned-offD Reis Contracting12/18/2024
DOB NOWSidewalk ShedSigned-offArsenal Scaffold12/09/2024
DOB NOWSuspended ScaffoldSigned-offAM&G Waterproofing09/26/2024
DOB NOWProtection and Mechanical MethodsSigned-offArsenal Scaffold08/29/2024
DOB NOWPlumbingSigned-offBedrock Plumbing & Heating08/20/2024
DOB NOWGeneral ConstructionSigned-offStreamline USA08/05/2024
DOB NOWMechanical SystemsSigned-offStreamline USA08/05/2024
DOB NOWConstruction FenceSigned-offArsenal Scaffold07/17/2024
DOB NOWSupported ScaffoldSigned-offArsenal Scaffold06/11/2024
DOB NOWMechanical SystemsSigned-offReis EY04/04/2024
DOB NOWPlumbingSigned-offDonato Plumbing02/20/2024
DOB NOWGeneral ConstructionSigned-offReis EY02/12/2024
DOB NOWProtection and Mechanical MethodsSigned-offArsenal Scaffold01/31/2024
DOB NOWGeneral ConstructionSigned-offReis EY01/30/2024
DOB NOWStructuralSigned-offReis EY01/10/2024
+ 60 more permits on file
2 projects · most recent 01/05/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/05/2026Signed-offReis EYAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric Mitsubishi PURY-EP144TNU-BS 144,000 BTU · Vrf Outdoor ×4
Mitsubishi PUY-A18NKA7 18,000 BTU · Condensing Unit ×2
Ventilation
Fantech Dedpv-705 120 CFM · Exhaust Fan ×1
Greenheck CUE-099-A-VG 800 CFM · Exhaust Fan ×1
Renewaire HETXRT 525 CFM · Erv ×1
05/30/2025Permit IssuedAlphacraft Construction*Air Conditioning Systems
Cooling
Task TYC021TW-30K 29,900 BTU · Condensing Unit ×3
2 projects · most recent 03/25/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/25/2026Signed-offDonato PlumbingGas, Water/Sanitary
05/30/2025Permit IssuedVelocity Plumbing & HeatingGas, Water/Sanitary
7 projects · most recent 04/28/2026
General Wiring
FiledStatusContractorScope
04/28/2026Permit IssuedApollo Electric8 meters, 8 new_meters
02/10/2026Permit IssuedBanner ElectricGeneral Wiring
07/31/2025CompleteTop Notch ElectricGeneral Wiring
04/17/2024Permit IssuedApollo ElectricGeneral Wiring
10/11/2023CompleteNash Electric Services—
02/22/2022Permit IssuedApollo Electric—
05/16/2019CompleteMega Electrical Contracting—
2 projects · most recent 07/30/2024
Concrete
FiledStatusContractorScope
07/30/2024——3 scope_items
08/30/2022Signed-offJuno ContractingConcrete
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
04/17/2026Pass-Final PL - UndergroundPassView ↗
03/27/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/23/2026Fail-Final PL - More than 10 Requested FloorsFailView ↗
03/10/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/10/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/28/2023Pass-Final SD - More than 10 Requested FloorsPassView ↗
12/22/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 121
DateRequirementInspectorRole
01/05/2026Post-installed AnchorsYoung Suhspecial
01/05/2026Mechanical SystemsYoung Suhspecial
01/05/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
01/05/2026FinalYoung Suhprogress
12/19/2025FinalYoung Suhprogress
12/19/2025Post-installed AnchorsYoung Suhspecial
12/19/2025Mechanical SystemsYoung Suhspecial
12/19/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
06/16/2025Maintenance informationHOPE DANAenergy_progress
06/16/2025HVAC-R and service water heating system controlsHOPE DANAenergy_progress
06/16/2025HVAC-R and service water heating equipmentHOPE DANAenergy_progress
06/16/2025Shutoff dampersHOPE DANAenergy_progress
06/16/2025Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
06/16/2025Energy Code Compliance InspectionsHOPE DANAprogress
06/16/2025HVAC-R and service water piping design and insulationHOPE DANAenergy_progress
05/30/2025Energy Code Compliance InspectionsHOPE DANAprogress
05/30/2025Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
05/21/2025Post-installed AnchorsJeffrey Stonesspecial
05/16/2025Post-installed AnchorsKarol Zdancewiczspecial
05/15/2025Lighting controlsHOPE DANAenergy_progress
05/15/2025Lighting in dwelling unitsHOPE DANAenergy_progress
05/14/2025HVAC-R and service water piping design and insulationHOPE DANAenergy_progress
05/14/2025Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
04/10/2025FinalHOPE DANAprogress
04/10/2025FinalHOPE DANAprogress
Latest 25 of 121.
▾Documents — 489 on file (BIS + DOB NOW)
▸Plans & Drawings55
▸DOB NOWPlans/Sketch53
09/06/2026M00703628-I1Request digital key ↗
09/06/2026M00703628-P1Request digital key ↗
09/02/2026M00679531-I1Request digital key ↗
Showing 3 of 53 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00168600-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00168629-I1Request digital key ↗
▸Applications & Permits89
▸DOB NOWLPC Approval/Permit35
09/06/2026M00703628-I1Open ↗
09/02/2026M00796085-I1Open ↗
08/18/2026M00656736-P5Open ↗
Showing 3 of 35 on file for this type
▸BISWORK PERMIT APPLICATION28
02/06/2020123538957Open ↗
08/29/2019123538957Open ↗
06/25/2019140856786Open ↗
Showing 3 of 28 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION26
08/29/2020123538957Open ↗
06/25/2019140856786Open ↗
11/21/2018123538957Open ↗
Showing 3 of 26 on file for this type
▸Seals & Professional Certifications159
▸DOB NOWDPL-1: Design Professional Seal & Signature54
09/06/2026M00703628-I1Open ↗
09/05/2026M00168629-I1Open ↗
09/02/2026M00796085-I1Open ↗
Showing 3 of 54 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature40
10/01/2026M00656701-P1Open ↗
09/01/2026M00656025-P1Open ↗
09/01/2026M00703655-P1Open ↗
Showing 3 of 40 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION26
11/21/2018123538957Open ↗
07/23/2018123390179Open ↗
04/13/2018123390179Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWProgress Inspector Seal & Signature21
10/01/2026M00656701-P1Open ↗
09/01/2026M00656025-P1Open ↗
09/01/2026M00703655-P1Open ↗
Showing 3 of 21 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
06/25/2019140856786Open ↗
01/13/2017140594195Open ↗
04/09/2013140068655Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
06/25/2019140856786Open ↗
01/13/2017140594195Open ↗
04/09/2013140068655Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
06/25/2019140856786Open ↗
01/13/2017140594195Open ↗
04/09/2013140068655Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment16
▸BISSCHEDULE B - PLUMBING5
01/16/2014121502551Open ↗
02/13/2013121523468Open ↗
02/01/2013120788344Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
01/25/2016122626417Open ↗
10/31/2014122173673Open ↗
02/06/2014121502551Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS3
03/26/2014121502551Open ↗
03/26/2014121502551Open ↗
03/26/2014121502551Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
03/31/2014121502551Open ↗
02/21/2013120788344Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
04/18/2014121502551Open ↗
03/26/2014121502551Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes5
11/21/2018123538957Open ↗
04/02/2018123390179Open ↗
02/18/2016122626417Open ↗
Showing 3 of 5 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/29/2019123538957Open ↗
▸Environmental & Asbestos30
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
11/21/2018123538957Open ↗
04/02/2018123390179Open ↗
01/13/2017140594195Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form10
08/29/2026M00942664-I1Open ↗
08/29/2026M00940310-I1Open ↗
08/27/2026M00656025-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/05/2026M00168629-I1Open ↗
09/02/2026M00796085-I1Open ↗
08/27/2026M01040691-S2Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance24
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
11/21/2018123538957Open ↗
07/23/2018123390179Open ↗
04/02/2018123390179Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
01/21/2021123538957Open ↗
07/23/2018123390179Open ↗
11/08/2017122626417Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections2
02/22/2013121502551Open ↗
Showing 1 of 2 on file for this type
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
01/21/2021123538957Open ↗
06/25/2019140856786Open ↗
01/13/2017140594195Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs39
▸BISLANDMARKS APPROVAL18
06/25/2019140856786Open ↗
12/27/2018123538957Open ↗
07/23/2018123390179Open ↗
Showing 3 of 18 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
01/21/2021123538957Open ↗
07/23/2018123390179Open ↗
11/08/2017122626417Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
04/16/2014120920735Open ↗
04/03/2014121502542Open ↗
03/12/2014140068655Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/13/2026M00656701-I1Open ↗
08/13/2026M00656736-I1Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWLandmark Approval1
08/13/2026M00942524-P1Open ↗
▸Cost, Insurance & Ownership21
▸BISCOST AFFIDAVIT21
01/21/2021123538957Open ↗
09/03/2020123538957Open ↗
11/21/2018123538957Open ↗
Showing 3 of 21 on file for this type
▸Filing & Intake Forms25
▸BISEFILING COVER SHEET10
11/21/2018123538957Open ↗
04/02/2018123390179Open ↗
01/25/2016122626417Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION7
09/03/2020123538957Open ↗
04/13/2018123390179Open ↗
09/28/2017122626417Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
06/25/2019140856786Open ↗
01/13/2017140594195Open ↗
04/09/2013140068655Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM2
07/23/2018123390179Open ↗
11/08/2017122626417Open ↗
▸Other Documents20
▸DOB NOWProof of Historic Building15
09/06/2026M00703628-I1Open ↗
08/18/2026M00656736-P5Open ↗
08/13/2026M00656701-P1Open ↗
Showing 3 of 15 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
03/18/2016122626417Open ↗
02/26/2013140058005Open ↗
01/02/2013120809410Open ↗
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
08/13/2026M01113167-I1Open ↗