← Back
Public elementary, junior or senior high
Mott Hall High School
2 EDGECOMBE AVENUE · BIN 1059460
💬 Discuss this project
1925Year Built
5Stories
W1Building Class
R7-2Zoning
119,370 sfGross Floor Area
3Units
LL97 Covered5 Open Violations 0 unresolved · 5 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 49,957 sf lot · 2.39 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Roof4p · 1 filing · 20 docs
Penthouse1p · 1 filing · 20 docs
Floor 51p · 1 filing · 20 docs
Floor 41p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Basement2p · 1 filing · 20 docs
1 job · most recent 03/04/2026
Storm Water/Sanitary
FiledStatusContractorScope
03/04/2026——Storm, Water/Sanitary
15 jobs · most recent 08/04/2026
General Wiring Lighting
FiledStatusContractorScope
08/04/2026CompleteANCO ELECTL CONTCTNG INC—
04/29/2026CompleteSUNRISE ELEC'L SERVICES—
02/05/2026CompleteGEMINI ELECTRIC CO., INC.—
10/22/2025CompleteDVM ELECTRICAL SERVICES LLighting
09/17/2025CompleteGEMINI ELECTRIC CO., INC.—
05/28/2025CompleteURBAN ELECTRICAL CORPGeneral Wiring
04/29/2025CompleteGEMINI ELECTRIC CO., INC.—
05/25/2023CompleteDIAZ ELECTRIC OF NEW YORKGeneral Wiring
02/20/2023CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
09/07/2022CompleteGEMINI ELECTRIC CO., INC.—
01/30/2021Permit IssuedDIAZ ELECTRIC OF NEW YORKGeneral Wiring
10/19/2020CompleteLIU ELECTRIC, LLCGeneral Wiring
07/31/2020CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
10/17/2019CompleteLASER ELEC'L CONTR'G INC—
12/20/2018CompleteLASER ELEC'L CONSTR'G INC—
1 job · most recent 03/04/2026
FiledStatusContractorScope
03/04/2026——1 scope_items
1 job · most recent 07/29/2025
FiledStatusContractorScope
07/29/2025Signed-offSUNRISE ELECTRICAL SRV228 panels, 132.24 kw, 5,700 roof_area_sqft
Building Lifecycle
All (110)Filed (8)Permit Issued (5)Signed Off (2)Violation (60)Objection (8)Special Inspection (27)
08/13/2026
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON ROOF INCLDUING ALL RELATED STRUCTURAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01230136-I1
08/06/2026
Objection resolved — Resolved
08/06/2026
Objection resolved — Resolved
04/01/2026
Special inspection requirement — Post-installed Anchors
03/20/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/20/2026
Special inspection requirement — Energy Code Compliance Inspections
03/20/2026
Special inspection requirement — Fenestration air leakage
03/16/2026
Objection raised — Other
03/16/2026
Objection raised — Other
03/16/2026
Objection raised — Other
03/16/2026
Objection raised — Other
03/04/2026
Filed — Alteration
Repointing & replacing cracked/chipped bricks/masonry to match. Cast stone window sill joints to be removed & caulked. Replace caulking joints on roof coping stones. Repairs to the bulkhead & penthouse areas, lintels, doors & cracks. Interior repairs.
M01362523-S2
03/04/2026
Filed — Alteration
Repointing & replacing cracked/chipped bricks/masonry to match. Cast stone window sill joints to be removed & caulked. Replace caulking joints on roof coping stones. Repairs to the bulkhead & penthouse areas, lintels, doors & cracks. Interior repairs.
M01362523-S1
03/04/2026
Filed — Alteration
Repointing & replacing cracked/chipped bricks/masonry to match. Cast stone window sill joints to be removed & caulked. Replace caulking joints on roof coping stones. Repairs to the bulkhead & penthouse areas, lintels, doors & cracks. Interior repairs.
M01362523-S3
03/02/2026
Filed — Alteration
Repointing & replacing cracked/chipped bricks/masonry to match. Cast stone window sill joints to be removed & caulked. Replace caulking joints on roof coping stones. Repairs to the bulkhead & penthouse areas, lintels, doors & cracks. Interior repairs.
M01362523-I1
03/02/2026
Special inspection requirement — Post-installed Anchors
03/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/19/2026
Special inspection requirement — Masonry
02/19/2026
Special inspection requirement — Concrete - Precast
02/19/2026
Special inspection requirement — Subgrade Inspections
02/19/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
02/19/2026
Special inspection requirement — Final
09/03/2025
Violation issued (ECB, open)
Construction
09/03/2025
Violation issued (ECB, open)
Construction
09/03/2025
Violation issued (ECB, open)
Construction
09/03/2025
Violation issued (ECB, closed)
Construction
09/03/2025
Violation issued (ECB, open)
Construction
07/30/2025
Permit issued — Solar
M01230136-I1-SL
07/29/2025
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON ROOF INCLDUING ALL RELATED STRUCTURAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01230136-I1
03/13/2025
Violation issued (FDNY_ORDER, closed)
10/03/2024
Signed off — Alteration
Modification to HVAC system to remove and replace motors and fans in existing units as shown on plans. No change in use, egress or occupancy under this application.
M00385573-I1
09/16/2024
Violation issued (ECB, open)
Construction
04/26/2023
Filed — Alteration
Modification to HVAC system to remove and replace motors and fans in existing units as shown on plans. No change in use, egress or occupancy under this application.
M00385573-P4
04/24/2023
Special inspection requirement — Shutoff dampers
JACOB HAAS
04/24/2023
Special inspection requirement — HVAC insulation and sealing
JACOB HAAS
04/24/2023
Special inspection requirement — Electrical motors
JACOB HAAS
04/24/2023
Special inspection requirement — Maintenance information
JACOB HAAS
04/24/2023
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
JACOB HAAS
04/24/2023
Special inspection requirement — Mechanical Systems
JACOB HAAS
04/24/2023
Special inspection requirement — Final
JACOB HAAS
05/24/2022
Violation issued (ECB, closed)
Construction
05/24/2022
Violation issued (ECB, closed)
Construction
12/10/2021
Permit issued — Mechanical Systems
M00385573-I1-MS
08/10/2021
Special inspection requirement — Electrical motors
JACOB HAAS
06/20/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/05/2021
Permit issued — Mechanical Systems
M00385573-I1-MS
11/09/2020
Permit issued — Mechanical Systems
M00385573-I1-MS
08/28/2020
Filed — Alteration
Modification to HVAC system to remove and replace motors and fans in existing units as shown on plans. No change in use, egress or occupancy under this application.
M00385573-P2
08/28/2020
Special inspection requirement — Maintenance information
JACOB HAAS
08/28/2020
Special inspection requirement — HVAC insulation and sealing
JACOB HAAS
08/28/2020
Special inspection requirement — Shutoff dampers
JACOB HAAS
08/28/2020
Special inspection requirement — Final
JACOB HAAS
08/28/2020
Special inspection requirement — Mechanical Systems
JACOB HAAS
08/28/2020
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
JACOB HAAS
08/27/2020
Permit issued — Mechanical Systems
M00385573-I1-MS
08/20/2020
Objection raised — Other
08/20/2020
Objection resolved — Addressed
08/18/2020
Filed — Alteration
Modification to HVAC system to remove and replace motors and fans in existing units as shown on plans. No change in use, egress or occupancy under this application.
M00385573-I1
Latest 60 of 110 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AMERESCO404/09/2026
NYCSCA3503/22/2026
NYC DEPARTMENT OF EDUCATION403/22/2026
DEPT OF EDUCATION PS 136303/22/2026
DOE 0 040103/22/2026
DOE 040103/22/2026
DEPARTMENT OF EDUCATION 0103/22/2026
I.S.136 D.O.E.203/22/2026
DOE/P.S. 136203/22/2026
IS 136 DEPT OF ED203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HARTLAND ENGINEERING, DPC203/04/2026
SHENOY ENGINEERING, PC103/04/2026
DRG ARCHITECTS103/02/2026
HOMERUN SOLAR107/29/2025
LORING CONSULTING ENGINEERS, INC.304/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CASO ASSOCIATES803/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
LORING CONSULTING ENGINEERS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INFINITY CONTRACTING SERVGeneral Contractor803/21/2026
CHAYUT, ALLENElectrical303/21/2026
SCHWERDTFEGER, MARCUSElectrical303/21/2026
LUPINSKI, MAREKElectrical303/21/2026
FLORENTINE ARTISTIC IRONElectrical303/21/2026
ANA DIAZElectrical203/21/2026
DEREK MOHANElectrical203/21/2026
GEMINI ELECTRIC CO., INC.Electrical203/22/2026
LASER ELEC'L CONSTR'G INCElectrical103/22/2026
MARTINEZ, FAUSTOElectrical103/21/2026
MILAD, MONETElectrical103/21/2026
JEAN ABELLARDElectrical103/21/2026
SUNRISE ELEC'L SERVICESElectrical103/22/2026
THOMAS STONEElectrical103/21/2026
BRIAN CHEBUSKEElectrical103/21/2026
SUNRISE ELECTRICAL SRVGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HOMERUN SOLAR8772107/29/2025
20/20 INSPECTIONS INC1471304/26/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRISE ELECTRICAL SRV07/30/2025
DOB NOWMechanical SystemsSigned-offINFINITY CONTRACTING SERV12/10/2021
DOB NOWMechanical SystemsSigned-offINFINITY CONTRACTING SERV04/05/2021
DOB NOWMechanical SystemsSigned-offINFINITY CONTRACTING SERV11/09/2020
DOB NOWMechanical SystemsSigned-offINFINITY CONTRACTING SERV08/27/2020
BISPLISSUEDVARSITY PLBG AND HTG INC01/05/2026
BISPLISSUEDVARSITY PLBG AND HTG INC01/06/2025
BISPLISSUEDVARSITY PLBG AND HTG INC01/10/2024
BISPLISSUEDVARSITY PLBG AND HTG INC01/06/2023
BISOTISSUEDMAC CONTRACTOR INC08/22/2018
BISOTISSUEDMAC CONTRACTOR INC08/17/2017
BISOTISSUEDMAC CONTRACTOR INC07/05/2017
BISOTISSUEDDONALD MCGEACHY INC03/10/2017
BISPLISSUEDFORSYTHE P&H CORP06/03/2015
BISOTISSUEDIMPERIUM CONSTRUCTION INC.06/03/2015
BISMHISSUEDACS SYSTEM ASSOCIATES INC.03/26/2015
BISOTISSUEDIMPERIUM CONSTRUCTION INC.03/19/2015
BISOTISSUEDIMPERIUM CONSTRUCTION INC.06/05/2014
BISPLISSUEDFORSYTHE P&H CORP06/05/2014
BISOTISSUEDNAVILLUS TILE INC05/16/2013
BISOTISSUEDNAVILLUS TILE INC05/16/2013
BISOTISSUEDNAVILLUS TILE INC03/19/2013
BISEQISSUEDNAVILLUS TILE INC03/19/2013
BISEQISSUEDNAVILLUS TILE INC03/18/2013
BISEQISSUEDNAVILLUS TILE INC03/18/2013
BISOTISSUEDNAVILLUS TILE INC03/18/2013
BISPLISSUEDVARSITY PLBG AND HTG INC11/15/2012
BISEQISSUEDNAVILLUS TILE INC03/15/2012
BISEQISSUEDNAVILLUS TILE INC03/15/2012
BISOTISSUEDNAVILLUS TILE INC03/15/2012
BISOTISSUEDNAVILLUS TILE INC03/15/2012
BISEQISSUEDNAVILLUS TILE INC03/15/2012
BISOTISSUEDNAVILLUS TILE INC11/21/2011
BISPLISSUEDVARSITY PLBG AND HTG INC11/21/2011
BISOTISSUEDNAVILLUS TILE INC11/21/2011
BISEQISSUEDNAVILLUS TILE INC10/28/2011
BISEQISSUEDNAVILLUS TILE INC09/16/2011
BISEQISSUEDNAVILLUS TILE INC09/14/2011
BISOTISSUEDULTIMA CONST, INC (SCA)04/28/2011
BISEQISSUEDCHAMPION CONTRUCTION CORP02/25/2011
+ 15 more permits on file
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
04/01/2026Post-installed Anchors—special
03/20/2026Fenestration and door U-factor and product ratings—energy_progress
03/20/2026Structural Stability – Alterations of existing buildings—special
03/20/2026Energy Code Compliance Inspections—progress
03/20/2026Fenestration air leakage—energy_progress
03/02/2026Post-installed Anchors—special
03/02/2026HVAC-R and service water piping design and insulation—energy_progress
03/02/2026Fire-Resistant Penetrations and Joints—special
02/19/2026Masonry—special
02/19/2026Concrete - Precast—special
02/19/2026Subgrade Inspections—special
02/19/2026Subsurface Conditions – Fill Placement & In-Place Density—special
02/19/2026Final—progress
04/24/2023Shutoff dampersJACOB HAASenergy_progress
04/24/2023HVAC insulation and sealing JACOB HAASenergy_progress
04/24/2023Electrical motorsJACOB HAASenergy_progress
04/24/2023Maintenance informationJACOB HAASenergy_progress
04/24/2023Alternative Materials - OTCR Buildings Bulletin NumberJACOB HAASspecial
04/24/2023Mechanical SystemsJACOB HAASspecial
04/24/2023FinalJACOB HAASprogress
08/10/2021Electrical motorsJACOB HAASenergy_progress
08/28/2020Maintenance informationJACOB HAASenergy_progress
08/28/2020HVAC insulation and sealing JACOB HAASenergy_progress
08/28/2020Shutoff dampersJACOB HAASenergy_progress
08/28/2020FinalJACOB HAASprogress
Latest 25 of 27.
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch5
08/22/2026M01230136-I1Request digital key ↗
08/18/2026M01362523-S2Request digital key ↗
08/18/2026M01362523-S3Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/04/2026M00385573-P4Request digital key ↗
08/15/2026M00385573-P2Request digital key ↗
08/14/2026M00385573-I1Request digital key ↗
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature10
09/29/2026M00385573-P2Open ↗
09/29/2026M00385573-P2Open ↗
09/29/2026M00385573-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/22/2026M01230136-I1Open ↗
08/18/2026M01362523-S1Open ↗
08/18/2026M01362523-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/29/2026M00385573-P2Open ↗
09/29/2026M00385573-P2Open ↗
08/31/2026M00385573-P4Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/22/2026M01230136-I1Open ↗
08/13/2026M00385573-P4Open ↗
08/13/2026M00385573-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00385573-I1Open ↗
▸Approvals, Objections & Sign-offs21
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/13/2026M01362523-S1Open ↗
08/13/2026M01362523-I1Open ↗
08/13/2026M01230136-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)7
08/13/2026M00385573-P2Open ↗
08/13/2026M00385573-P4Open ↗
08/13/2026M00385573-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)5
08/13/2026M01362523-S2Open ↗
08/13/2026M00385573-I1Open ↗
08/13/2026M01362523-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWUtility Company Final Acceptance Letter1
08/22/2026M01230136-I1Open ↗
▸Other Documents7
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal7
08/13/2026M00385573-P2Open ↗
08/13/2026M00385573-P4Open ↗
08/13/2026M01362523-S2Open ↗
Showing 3 of 7 on file for this type