Condo, residential unit in elevator building
Bridgeview Condominium
2 ELIZABETH STREET · BIN 1002434
💬 Discuss this project
1985Year Built
8Stories
R4Building Class
C6-1Zoning
176,254 sfGross Floor Area
175Units
LL97 CoveredRent Stabilized80 Open Violations 64 unresolved · 16 paperwork only ▸FISP: UNSAFEFDNY Report ↗
Condo, residential unit in elevator building · Owner of record: BRIDGEVIEW HOUSE CONDOMINIUM · 25,125 sf lot · 7.02 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof2p · 1 filing · 7 docs
Floor 43p · 3 filings · 16 docs
Floor 3
Floor 22p · 2 filings · 5 docs
Floor 15p · 3 filings · 20 docs
Cellar14p · 7 filings · 20 docs
Basement1p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LANDMARK REALTY LLC RUN 1782007/08/2026
TUC MANAGEMENT2307/08/2026
KLEIN PROPERTY MGT207/08/2026
RABER ENTERPRISES6504/09/2026
KLEIN PROPERTY MGT OF NY LLC203/22/2026
BRIDGEVIEW HOUSE CONDO3703/22/2026
168 LN HOLDING INC103/22/2026
THE BRIDGEVIEW HOUSE CORP103/22/2026
QUIK PARK REGENT LLC203/22/2026
BRIGDEWVIEW HOUSE CONDO103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1403/21/2026
WHIDDEN SILVER603/21/2026
RES FIRE503/21/2026
KAZAM CONSULTANTS1203/21/2026
PROJECT EXPEDITERS CONSULTING CO.203/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NATIONAL MAINTENANCEScaffold607/08/2026
EMPIRE NY INSTALLATIONS INCGeneral Contractor407/08/2026
MID-STATE CONSTRUCTION CGeneral Contractor403/21/2026
VARIANT SERVICES INCGeneral Contractor303/21/2026
TT&T CONSTRUCTION INCGeneral Contractor203/21/2026
AGGRESSIVE HEATING INCGeneral Contractor207/08/2026
GREGOR INDUSTRIES INCGeneral Contractor204/09/2026
KLE CONSTRUCTION INCGeneral Contractor207/08/2026
JOHN FITZGERALD PLBG &HTGPlumbing207/08/2026
FREDERICK LEEElectrical103/21/2026
MACCARONE PLUMBING INCPlumbing107/08/2026
RRP PLUMBING CORPPlumbing107/08/2026
CAM ENERGY HTG&MECH CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSEPH MARTINES PE, PLLC1428305/07/2025
KZ ENGINEERING, P.C.4665103/05/2025
BASSIRI8394208/21/2024
ATLAS ATC ENGINEERING INC8011505/08/2024
ISHAC DESIGN ARCHITECTS P3918208/11/2023
SOCOTEC ENGINEERING4983208/11/2023
NEW AGE ENGINEERING PLLC7746303/24/2023
Building Lifecycle
All (206)Filed (28)Permit Issued (28)Signed Off (16)Facade (FISP) (19)Violation (60)Inspection (11)Objection (14)Special Inspection (30)
07/21/2026
Filed — Alteration
Doing parking garage repairs on the cellar and first floors. This work is a repair of the deficiencies found in the Periodic Inspection of Parking Structure (PIPS) report, as specified in the plans.
M01432931-I1
07/20/2026
Special inspection requirement — Sprayed fire-resistant materials
07/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
CHOK PAN WONG
07/17/2026
Special inspection requirement — Final
07/06/2026
Permit issued — Sidewalk Shed
M01005823-I1-SH
05/23/2026
Violation issued (HPD, open)
C
05/23/2026
Violation issued (HPD, open)
B
05/23/2026
Violation issued (HPD, open)
C
05/23/2026
Violation issued (HPD, open)
C
05/23/2026
Violation issued (HPD, open)
B
05/12/2026
Violation issued (ECB, open)
Construction
05/11/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/10/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/13/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/02/2026
Permit issued — Sidewalk Shed
M01005823-I1-SH
02/10/2026
Violation issued (HPD, open)
B
02/10/2026
Violation issued (HPD, open)
B
02/10/2026
Violation issued (HPD, open)
C
02/05/2026
Violation issued (ECB, open)
Construction
02/05/2026
Violation issued (ECB, open)
Construction
02/05/2026
Violation issued (ECB, open)
Construction
02/04/2026
Violation issued (ECB, open)
Construction
02/04/2026
Violation issued (ECB, open)
Construction
02/04/2026
Violation issued (ECB, open)
Construction
01/13/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/20/2025
Signed off — Alteration
Replacement of breakroom fixtures as filed on drawings herewith.
M01173182-S1
11/20/2025
Signed off — Alteration
Replacement of breakroom fixtures as filed on drawings herewith.
M01173182-S2
11/17/2025
Violation issued (HPD, closed)
I
10/29/2025
Violation issued (HPD, open)
B
10/29/2025
Violation issued (HPD, open)
B
10/29/2025
Violation issued (HPD, closed)
C
10/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/07/2025
Signed off — Alteration
Replacement of breakroom fixtures as filed on drawings herewith.
M01173182-I1
09/26/2025
Signed off — Alteration
Replacing deteriorated beams being supported by temporary shoring. Replacement of steel channels. Job under commissioner control 341312
M00917390-I1
09/20/2025
Violation issued (FDNY_NOV, closed)
08/21/2025
Violation issued (ECB, open)
Construction
08/14/2025
Violation issued (HPD, open)
B
08/14/2025
Violation issued (HPD, open)
B
08/14/2025
Violation issued (HPD, open)
C
08/14/2025
Violation issued (HPD, open)
B
08/14/2025
Violation issued (HPD, open)
B
08/13/2025
Signed off — Alteration
Temp. Shoring install, reinforcing the bottom portion of existing columns, cleaning off rust at the base of columns, painting new spray-on fireproofing, and new framing below existing S/W framing. Job under commissioner control 341312.
M00885356-I1
07/14/2025
Violation issued (ECB, closed)
Construction
07/14/2025
Violation issued (ECB, open)
Unknown
07/14/2025
Violation issued (ECB, closed)
Construction
06/26/2025
Permit issued — Plumbing
M01173182-S2-PL
06/04/2025
Violation issued (HPD, closed)
A
05/07/2025
Filed — Alteration
Replacement of breakroom fixtures as filed on drawings herewith.
M01173182-S2
05/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
JOSEPH MARTINES
04/28/2025
Permit issued — Sidewalk Shed
M01005823-I1-SH
04/15/2025
Permit issued — General Construction
M01173182-I1-GC
04/15/2025
Permit issued — Mechanical Systems
M01173182-S1-MS
03/21/2025
Filed — Alteration
Replacement of breakroom fixtures as filed on drawings herewith.
M01173182-S1
03/21/2025
Filed — Alteration
Replacement of breakroom fixtures as filed on drawings herewith.
M01173182-I1
03/10/2025
Permit issued — Suspended Scaffold
M01189403-I1-SC
03/05/2025
Filed — Alteration
Installation of suspended scaffolding for facade inspection/repair.
M01189403-I1
03/05/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
03/05/2025
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
02/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JOSEPH MARTINES
Latest 60 of 206 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedEMPIRE NY INSTALLATIONS INC07/06/2026
DOB NOWSidewalk ShedPermit IssuedEMPIRE NY INSTALLATIONS I04/02/2026
DOB NOWPlumbingSigned-offMACCARONE PLUMBING INC06/26/2025
DOB NOWSidewalk ShedPermit IssuedEMPIRE NY INSTALLATIONS I04/28/2025
DOB NOWGeneral ConstructionSigned-offGREGOR INDUSTRIES INC04/15/2025
DOB NOWMechanical SystemsSigned-offGREGOR INDUSTRIES INC04/15/2025
DOB NOWSuspended ScaffoldPermit IssuedSKYLIMIT CONTRACTING LLC03/10/2025
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG09/13/2024
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC09/06/2024
DOB NOWBoiler EquipmentPermit IssuedAGGRESSIVE HEATING INC06/11/2024
DOB NOWSidewalk ShedPermit IssuedEMPIRE NY INSTALLATIONS I04/29/2024
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG04/23/2024
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC04/17/2024
DOB NOWStructuralSigned-offMID-STATE CONSTRUCTION C12/20/2023
DOB NOWMechanical SystemsPermit IssuedAGGRESSIVE HEATING INC12/04/2023
DOB NOWStructuralSigned-offMID-STATE CONSTRUCTION C07/19/2023
DOB NOWMechanical SystemsPermit IssuedAGGRESSIVE HEATING INC04/19/2023
DOB NOWPlumbingPermit IssuedCAM ENERGY HTG&MECH CORP04/17/2023
DOB NOWBoiler EquipmentPermit IssuedAGGRESSIVE HEATING INC04/17/2023
DOB NOWPlumbingPermit IssuedRRP PLUMBING CORP12/15/2022
DOB NOWGeneral ConstructionPermit IssuedTT&T CONSTRUCTION INC12/14/2022
DOB NOWGeneral ConstructionSigned-offVARIANT SERVICES INC06/24/2021
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC12/17/2020
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC12/17/2020
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC12/17/2020
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC12/17/2020
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC12/17/2020
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC12/17/2020
BISOTISSUEDYILIN CONSTRUCTION INC08/05/2020
BISOTISSUEDSMVP MGMT INC02/04/2020
BISPLISSUEDDARCI PLUMBING CO INC04/10/2019
BISPLISSUEDFLYTIGER P & H LTD12/18/2018
BISOTISSUEDYUNG WAY CONSTRUCTION INC.12/12/2018
BISPLISSUEDTOP PLUMBING GROUP,INC10/06/2017
BISMHISSUEDNIC DESIGN MGMT INC10/06/2017
BISSPISSUEDNYC FIRE SPRINKLER CORP06/23/2017
BISMHISSUEDSCHIMENTI CONSTRUCTION CO06/21/2017
BISOTISSUEDSCHIMENTI CONSTRUCTION CO06/21/2017
BISMHISSUEDPOWER COOLING INC01/23/2017
BISOTISSUEDSCHIMENTI CONSTRUCTION CO12/20/2016
+ 38 more permits on file
1 project · most recent 03/24/2023
Others
FiledStatusContractorScopeMake / Model / Capacity
03/24/2023Permit IssuedAGGRESSIVE HEATING INCOthers
Other
__Junk__ 10 GAUGE STAINLESS STEEL Chimney ×1
7 projects · most recent 05/19/2025
General Wiring
FiledStatusContractorScope
05/19/2025CompleteACM ELECTRIC CORPORATIONGeneral Wiring
02/22/2024Permit IssuedMEGA ELEC'L CONTR'G, INC—
12/05/2023Permit IssuedROBERT CHIMENTI11 meters, 1 new_meters
02/07/2023CancelledKJK ELECTRIC INCGeneral Wiring
07/16/2021CompleteT. DIRUSSO ELEC'L CONT INGeneral Wiring
12/23/2020CompleteNATIONAL MAINT. INC—
12/23/2020CompleteNATIONAL MAINT. INC—
1 project · most recent 03/05/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
03/05/2025Permit IssuedSKYLIMIT CONTRACTINGSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
10/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/01/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/21/2024Pass-Final PL Permit WithdrawalPassView ↗
07/05/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/18/2023Fail-Final Construction Permit WithdrawalFailView ↗
04/17/2023Fail-Final PL Permit WithdrawalFailView ↗
04/13/2023Fail-Final PL Permit WithdrawalFailView ↗
04/12/2023Fail-Final Construction Permit WithdrawalFailView ↗
04/12/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
07/20/2026Sprayed fire-resistant materials—special
07/20/2026Tenant Protection Plan ComplianceCHOK PAN WONGspecial
07/17/2026Final—progress
05/01/2025Tenant Protection Plan ComplianceJOSEPH MARTINESspecial
03/05/2025Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
03/05/2025Post-installed AnchorsKarol Zdancewiczspecial
02/06/2025HVAC-R and service water piping design and insulationJOSEPH MARTINESenergy_progress
02/06/2025Interior lighting powerJOSEPH MARTINESenergy_progress
02/06/2025Lighting controlsJOSEPH MARTINESenergy_progress
02/06/2025Maintenance informationJOSEPH MARTINESenergy_progress
01/28/2025FinalJOSEPH MARTINESprogress
01/28/2025Tenant Protection Plan ComplianceJOSEPH MARTINESspecial
01/28/2025Mechanical SystemsJOSEPH MARTINESspecial
01/28/2025FinalJOSEPH MARTINESprogress
01/28/2025Tenant Protection Plan ComplianceJOSEPH MARTINESspecial
09/05/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
09/05/2024FinalFARHAD BASSIRI-TEHRANIprogress
08/21/2024Tenant Protection Plan ComplianceFARHAD BASSIRI-TEHRANIspecial
08/21/2024Tenant Protection Plan ComplianceFARHAD BASSIRI-TEHRANIspecial
08/21/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
08/21/2024FinalFARHAD BASSIRI-TEHRANIprogress
08/20/2024Final—progress
08/20/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
06/22/2023Structural Steel - DetailsGIORGI KHARDZEISHVILIspecial
06/22/2023FinalGIORGI KHARDZEISHVILIprogress
Latest 25 of 46.
▾Documents — 504 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch21
09/01/2026M08039885-I1Request digital key ↗
09/01/2026M08039880-I1Request digital key ↗
08/31/2026M00830572-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Sign6
09/04/2026M00436645-I1Request digital key ↗
09/04/2026M00436638-I1Request digital key ↗
09/04/2026M00437123-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/03/2026M00459582-I1Request digital key ↗
▸Applications & Permits85
▸BISWORK PERMIT APPLICATION43
08/05/2020123572534Open ↗
07/22/2020123572534Open ↗
02/04/2020123771999Open ↗
Showing 3 of 43 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION42
08/31/2020104438574Open ↗
07/23/2020104438574Open ↗
06/26/2020104435452Open ↗
Showing 3 of 42 on file for this type
▸Seals & Professional Certifications144
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION48
03/05/2020123572534Open ↗
02/03/2020123771999Open ↗
11/13/2019122751129Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature27
09/04/2026M00436654-I1Open ↗
09/04/2026M00436660-I1Open ↗
09/03/2026M00459582-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
09/23/2026M00830624-I1Open ↗
09/23/2026M00830624-I1Open ↗
09/23/2026M00830624-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/23/2026M00830624-I1Open ↗
09/14/2026M01189403-I1Open ↗
09/14/2026M01189403-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
12/13/2018123509131Open ↗
10/10/2017123139923Open ↗
12/20/2016122751129Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
04/09/2019140841873Open ↗
12/13/2018123509131Open ↗
10/10/2017123139923Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
04/09/2019140841873Open ↗
01/18/2017140595443Open ↗
05/04/2016140491475Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
04/09/2019140841873Open ↗
01/18/2017140595443Open ↗
05/04/2016140491475Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment17
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
09/06/2019140841873Open ↗
12/13/2018123509131Open ↗
03/16/2018122751129Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
02/06/2018123139923Open ↗
02/06/2018123139923Open ↗
05/10/2017140595443Open ↗
▸BISSCHEDULE B - PLUMBING3
04/09/2019140841873Open ↗
Showing 1 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
02/10/2020121945921Open ↗
01/31/2020121945921Open ↗
▸BISEQUIPMENT USE PERMITS2
02/06/2018123139923Open ↗
05/10/2017140595443Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection14
▸BISTenant Protection Plan and Notes7
06/24/2020123572534Open ↗
03/16/2020123771999Open ↗
12/13/2018123509131Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTenant Protection Plan6
09/04/2026M00436660-I1Open ↗
08/13/2026M00436645-I1Open ↗
08/13/2026M00436638-I1Open ↗
Showing 3 of 6 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
05/10/2017140595443Open ↗
▸Environmental & Asbestos38
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
09/04/2026M00436654-I1Open ↗
09/04/2026M00436660-I1Open ↗
09/03/2026M00459582-I1Open ↗
Showing 3 of 18 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)16
03/05/2020123572534Open ↗
02/03/2020123771999Open ↗
04/09/2019140841873Open ↗
Showing 3 of 16 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
11/01/2016122361256Open ↗
▸Energy Compliance38
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS16
03/05/2020123572534Open ↗
02/03/2020123771999Open ↗
11/13/2019122751129Open ↗
Showing 3 of 16 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS11
07/15/2021140841873Open ↗
03/31/2021123572534Open ↗
11/13/2019122751129Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
07/15/2021140841873Open ↗
03/31/2021123572534Open ↗
07/19/2020123572534Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
04/09/2019140841873Open ↗
01/18/2017140595443Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00459582-I1Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY8
07/15/2021140841873Open ↗
03/31/2021123572534Open ↗
09/03/2020104438574Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs32
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
07/15/2021140841873Open ↗
03/31/2021123572534Open ↗
09/03/2020104438574Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
02/12/2018123139923Open ↗
05/19/2017140595443Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/13/2026M00830624-I1Open ↗
08/13/2026M00830607-I1Open ↗
08/13/2026M00830572-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSHED LETTER2
04/21/2016121776845Open ↗
Showing 1 of 2 on file for this type
▸BISLANDMARKS APPROVAL1
01/22/2020121945921Open ↗
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership39
▸BISCOST AFFIDAVIT36
07/15/2021140841873Open ↗
03/31/2021123572534Open ↗
09/03/2020104438574Open ↗
Showing 3 of 36 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST2
01/20/2017140595443Open ↗
Showing 1 of 2 on file for this type
▸BISCIVIL PENALTY AFFIDAVIT/REQUEST1
08/05/2020123572534Open ↗
▸Filing & Intake Forms48
▸BISEFILING COVER SHEET21
03/05/2020123572534Open ↗
02/03/2020123771999Open ↗
12/13/2018123509131Open ↗
Showing 3 of 21 on file for this type
▸BISBOROUGH INTAKE FORM13
06/26/2020104435452Open ↗
06/08/2020104438574Open ↗
06/08/2020104445977Open ↗
Showing 3 of 13 on file for this type
▸BISADDITIONAL INFORMATION9
06/24/2020123572534Open ↗
02/03/2020123771999Open ↗
07/09/2019140841873Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
04/09/2019140841873Open ↗
01/18/2017140595443Open ↗
05/04/2016140491475Open ↗
Showing 3 of 5 on file for this type
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
04/21/2016121776845Open ↗
Showing 1 of 3 on file for this type
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISUnknown1
02/25/2020123771999Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
05/04/2016140491475Open ↗
▸DOB NOWCalculations1
08/13/2026M01189403-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01189403-I1Open ↗