← Back
BuildNYC
Condo, residential unit in elevator building
Island Condominium
2 ELMWOOD PARK DRIVE · BIN 5040473
💬 Discuss this project
1983Year Built
3Stories
R4Building Class
R5Zoning
116,843 sfGross Floor Area
177Units
Rent Stabilized29 Active Violations 27 unresolved · 2 paperwork only 10 likely answered ▸FISP: SWARMP
Condo, residential unit in elevator building · Owner of record: Foxwood Square Condo II · 91,000 sf lot · 1.28 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofIsland Condo Management CORP.19p · 6 filings · 20 docs
CellarIsland Condo Management CORP.3p · 1 filing · 4 docs
Sub-BasementVerizon antenna and equipment installation1 filing · 3 docs
Site & exteriorIsland Condo Management CORP.14p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Foxwood Square Condominium II1403/21/2026
Elmwood Park Condo103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tectonic Engineering112/17/2024
Structural Consulting Services210/23/2023
Azimuth Engineering606/05/2023
Dewberry Engineers110/15/2019
Maser Consulting PA105/08/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM Services Group803/21/2026
Codegreen103/21/2026
AK Consulting Services203/21/2026
Construction Permit Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Overland Contractingspecialty_contractor1207/08/2026
Overland ContractingGeneral Contractor407/08/2026
RC3 Electricspecialty_contractor407/08/2026
Claire ConstructionGeneral Contractor103/21/2026
Eastern AllianceGeneral Contractor103/21/2026
Odyssia General ContractingGeneral Contractor103/21/2026
Etak Systemsspecialty_contractor107/08/2026
Go Pro Plumbing and HeatingPlumbing107/08/2026
Plaza Electrical ContractorsElectrical103/22/2026
Antenna System AuditGeneral Contractor103/21/2026
Arete DevelopmentGeneral Contractor103/21/2026
Cellular TelephoneGeneral Contractor103/21/2026
Carmine's MechanicalPlumbing311/24/2010
GFJ Construction Corp Dba BuildGeneral Contractor111/09/2001
PCS ContractingGeneral Contractor109/14/2010
RC3 ElectricGeneral Contractor212/15/2015
Sba Network ServicesGeneral Contractor112/28/2015
Telcom Engineering GPGeneral Contractor112/18/2013
Telcom Engineering GroupGeneral Contractor111/23/2021
Tower ReconGeneral Contractor107/14/1999
Trinity TechnologiesGeneral Contractor109/30/2016
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering106112/17/2024
Structural Consulting Services1919210/23/2023
Jeremy K McKeon, P.E.7263407/20/2022
R Marsac Consulting329110/15/2019
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
09/17/2026
Elevator Category 1 inspection report filed
04/06/2026
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 223, 2nd STORY, 1st APARTMENT FROM NORTH AT…
HPD violation · closed
04/06/2026
§ 27-2033 ADM code provide ready access to buildings heating system locked door at cellar at boiler room
HPD violation · closed
04/06/2026
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 523, 5th STORY, 1st APARTMENT FROM NORTH AT…
HPD violation · open
216 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offEtak Systems04/11/2025
DOB NOWMechanical SystemsSigned-offRC3 Electric07/26/2024
DOB NOWAntennaSigned-offRC3 Electric07/26/2024
DOB NOWSuspended ScaffoldPermit IssuedK.E.S. Construction12/27/2023
DOB NOWMechanical SystemsSigned-offOverland Contracting11/22/2021
DOB NOWGeneral ConstructionSigned-offOverland Contracting11/22/2021
DOB NOWPlumbingSigned-offGo Pro Plumbing and Heating10/13/2021
DOB NOWMechanical SystemsSigned-offOverland Contracting10/13/2021
DOB NOWGeneral ConstructionSigned-offOverland Contracting09/29/2021
DOB NOWAntennaSigned-offOverland Contracting03/03/2020
DOB NOWAntennaSigned-offOverland Contracting02/14/2019
DOB NOWAntennaSigned-offOverland Contracting11/26/2018
DOB NOWAntennaSigned-offOverland Contracting10/31/2018
BISOTISSUEDTelcom Engineering GP11/23/2021
BISOTISSUEDClaire Construction03/08/2021
BISOTISSUEDTrinity Technologies09/30/2016
BISOTISSUEDEastern Alliance03/07/2016
BISOTISSUEDSba Network Services12/28/2015
BISOTISSUEDRC3 Electric12/15/2015
BISOTISSUEDRC3 Electric10/23/2015
BISOTISSUEDTelcom Engineering GP12/18/2013
BISOTISSUEDAntenna System Audit03/08/2011
BISPLISSUEDCarmine's Mechanical11/24/2010
BISOTISSUEDPCS Contracting09/14/2010
BISPLISSUEDCarmine's Mechanical05/07/2009
BISBLISSUEDCarmine's Mechanical05/07/2009
BISMHISSUEDArete Development03/24/2005
BISOTISSUEDGFJ Construction Corp Dba Build11/09/2001
BISOTISSUEDCellular Telephone01/30/2001
BISOTISSUEDTower Recon07/14/1999
BISOTISSUEDOdyssia General Contracting03/15/1999
BISMHISSUEDCellular Telephone10/30/1995
2 projects · most recent 11/16/2021
General Wiring
FiledStatusContractorScope
11/16/2021CompleteElmac ElectricGeneral Wiring
09/04/2020CompletePlaza Electrical ContractorsGeneral Wiring
1 project · most recent 12/11/2023
Suspended Scaffold (SC)
FiledStatusContractorScope
12/11/2023Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
10/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
03/15/2023Tenant Protection Plan ComplianceJames Faheyspecial
03/15/2023Mechanical SystemsJames Faheyspecial
03/15/2023HVAC-R and service water heating system controlsJames Faheyenergy_progress
03/15/2023Maintenance informationJames Faheyenergy_progress
03/15/2023HVAC-R and service water heating equipmentJames Faheyenergy_progress
03/15/2023HVAC-R and service water piping design and insulationJames Faheyenergy_progress
03/15/2023FinalJames Faheyprogress
08/01/2022Mechanical SystemsJeremy McKeonspecial
08/01/2022FinalJeremy McKeonprogress
07/28/2022Post-installed AnchorsJeremy McKeonspecial
07/28/2022FinalJeremy McKeonprogress
07/28/2022Concrete - Cast-In-PlaceJeremy McKeonspecial
01/24/2022FinalJeremy McKeonprogress
01/24/2022FinalJeremy McKeonprogress
01/24/2022Mechanical SystemsJeremy McKeonspecial
01/24/2022Post-installed AnchorsJeremy McKeonspecial
01/24/2022Concrete - Cast-In-PlaceJeremy McKeonspecial
182 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account