2 Open Violations 0 unresolved · 2 paperwork only▸
ECB06/19/2018FAILURE TO MAINTAIN BLDG WALL(S) OR APURTENANCIES. NOTED: @ EXP. #1 SEVERAL SECTIONS OF SOFFIT IN DISREPAIR WITH HOLES. ALSO NOTED: INTERIORWALLS IN DISREPAIR WITH SEVERAL SECTION OF PLASTER MISSING THROUGHOUTNothing owed — awaiting certificate of correction
ECB04/21/2016AS PER CLASS 2(B265) 28-303.7 FAILURE TO FILE A COMPLETE BOILER INSP REPORT AS PER DOB RECORDS. SUBMIT A CURRENT BO-9 REPORT, CORRECT ALL VIOLATING CONDITIONS & SUBMIT THE C OF C.Nothing owed — awaiting certificate of correction
Museum · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 598,715 sf lot · 0 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.