RoofUnder Construction106p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Protection and Mechanical Methods · Sprinklers · Structural
Proposed repairs at Sub-Cellar and Cellar, shaft infills and shaft relocations at Guestrooms Flrs 3 through 16 (Marketing 17), Structural repairs to address deteriorated existing structure in need of repairs, Structural alterations to renovate Guestrooms.
On file for this job
31 documents · 2 drawing sheets
Structural alterations to the public spaces of the hotel.
On file for this job
36 documents · 5 drawing sheets
INSTALLATION OF TEMPORARY ROOF PROTECTION& OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
17 documents
Latest 3 of 7 filings on this floor.
Bulkhead2p · 2 filings · 3 docs
Architecture
Job M01126055
No filed description on record for this job.
On file for this job
1 document · 1 drawing sheet
No filed description on record for this job.
On file for this job
2 documents · 1 drawing sheet
PenthouseUnder Construction2 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modification to existing Plumbing system for INTERIOR RENOVATION OF EXISTING 17TH FLOOR SPACES INCLUSIVE OF BAR AND LOUNGE, COMMERCIAL KITCHEN, BACK OF HOUSE SPACES, AND TOILETS ROOMS WITHIN THE GRAMERCY PARK HOTEL. No change in occupancy, use or egress.
On file for this job
20 documents
Modification to existing Sprinkler System for INTERIOR RENOVATION OF EXISTING 17TH FLOOR SPACES INCLUSIVE OF BAR AND LOUNGE, COMMERCIAL KITCHEN, BACK OF HOUSE SPACES, AND TOILETS ROOMS WITHIN THE GRAMERCY PARK HOTEL. No change in occupancy, use or egress
On file for this job
6 documents
Floor 17Under Construction40p · 2 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Proposed repairs at Sub-Cellar and Cellar, shaft infills and shaft relocations at Guestrooms Flrs 3 through 16 (Marketing 17), Structural repairs to address deteriorated existing structure in need of repairs, Structural alterations to renovate Guestrooms.
On file for this job
31 documents · 2 drawing sheets
INSTALLATION OF TEMPORARY SPRINKLER LOOPS. NO CHANGE TO USE, EGRESS AND/OR OCCUPANCY.
On file for this job
6 documents · 1 drawing sheet
Floor 16Under Construction92p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Proposed repairs at Sub-Cellar and Cellar, shaft infills and shaft relocations at Guestrooms Flrs 3 through 16 (Marketing 17), Structural repairs to address deteriorated existing structure in need of repairs, Structural alterations to renovate Guestrooms.
On file for this job
31 documents · 4 drawing sheets
Structural alterations to the public spaces of the hotel.
On file for this job
36 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY SPRINKLER LOOPS. NO CHANGE TO USE, EGRESS AND/OR OCCUPANCY.
On file for this job
6 documents
Latest 3 of 4 filings on this floor.
Floor 15Under Construction92p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructuralZ
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Proposed repairs at Sub-Cellar and Cellar, shaft infills and shaft relocations at Guestrooms Flrs 3 through 16 (Marketing 17), Structural repairs to address deteriorated existing structure in need of repairs, Structural alterations to renovate Guestrooms.
On file for this job
31 documents · 3 drawing sheets
Structural alterations to the public spaces of the hotel.
On file for this job
36 documents · 2 drawing sheets
INSTALLATION OF TEMPORARY SPRINKLER LOOPS. NO CHANGE TO USE, EGRESS AND/OR OCCUPANCY.
On file for this job
6 documents
Latest 3 of 4 filings on this floor.
Floor 14Under Construction89p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Proposed repairs at Sub-Cellar and Cellar, shaft infills and shaft relocations at Guestrooms Flrs 3 through 16 (Marketing 17), Structural repairs to address deteriorated existing structure in need of repairs, Structural alterations to renovate Guestrooms.
On file for this job
31 documents · 2 drawing sheets
Structural alterations to the public spaces of the hotel.
On file for this job
36 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY SPRINKLER LOOPS. NO CHANGE TO USE, EGRESS AND/OR OCCUPANCY.
On file for this job
6 documents
Latest 3 of 4 filings on this floor.
Floor 13Under Construction88p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Proposed repairs at Sub-Cellar and Cellar, shaft infills and shaft relocations at Guestrooms Flrs 3 through 16 (Marketing 17), Structural repairs to address deteriorated existing structure in need of repairs, Structural alterations to renovate Guestrooms.
On file for this job
31 documents · 1 drawing sheet
Structural alterations to the public spaces of the hotel.
On file for this job
36 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY SPRINKLER LOOPS. NO CHANGE TO USE, EGRESS AND/OR OCCUPANCY.
On file for this job
6 documents
Latest 3 of 4 filings on this floor.
Floor 12Under Construction52p · 3 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Proposed repairs at Sub-Cellar and Cellar, shaft infills and shaft relocations at Guestrooms Flrs 3 through 16 (Marketing 17), Structural repairs to address deteriorated existing structure in need of repairs, Structural alterations to renovate Guestrooms.
On file for this job
31 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY SPRINKLER LOOPS. NO CHANGE TO USE, EGRESS AND/OR OCCUPANCY.
On file for this job
6 documents
Interior partitions and partial demolition on floors Cellar, 1-16 and Penthouse which includes Hotel guestrooms, Tenant floors and Public spaces per plans filed herewith.
On file for this job
24 documents · 1 drawing sheet
Floor 11Under Construction52p · 3 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Proposed repairs at Sub-Cellar and Cellar, shaft infills and shaft relocations at Guestrooms Flrs 3 through 16 (Marketing 17), Structural repairs to address deteriorated existing structure in need of repairs, Structural alterations to renovate Guestrooms.
On file for this job
31 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY SPRINKLER LOOPS. NO CHANGE TO USE, EGRESS AND/OR OCCUPANCY.
On file for this job
6 documents
Interior partitions and partial demolition on floors Cellar, 1-16 and Penthouse which includes Hotel guestrooms, Tenant floors and Public spaces per plans filed herewith.
On file for this job
24 documents · 1 drawing sheet
Floor 10Under Construction89p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Proposed repairs at Sub-Cellar and Cellar, shaft infills and shaft relocations at Guestrooms Flrs 3 through 16 (Marketing 17), Structural repairs to address deteriorated existing structure in need of repairs, Structural alterations to renovate Guestrooms.
On file for this job
31 documents · 2 drawing sheets
Structural alterations to the public spaces of the hotel.
On file for this job
36 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY SPRINKLER LOOPS. NO CHANGE TO USE, EGRESS AND/OR OCCUPANCY.
On file for this job
6 documents
Latest 3 of 4 filings on this floor.
Floor 9Under Construction52p · 3 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Proposed repairs at Sub-Cellar and Cellar, shaft infills and shaft relocations at Guestrooms Flrs 3 through 16 (Marketing 17), Structural repairs to address deteriorated existing structure in need of repairs, Structural alterations to renovate Guestrooms.
On file for this job
31 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY SPRINKLER LOOPS. NO CHANGE TO USE, EGRESS AND/OR OCCUPANCY.
On file for this job
6 documents
Interior partitions and partial demolition on floors Cellar, 1-16 and Penthouse which includes Hotel guestrooms, Tenant floors and Public spaces per plans filed herewith.
On file for this job
24 documents · 1 drawing sheet
Floor 8Under Construction54p · 3 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Proposed repairs at Sub-Cellar and Cellar, shaft infills and shaft relocations at Guestrooms Flrs 3 through 16 (Marketing 17), Structural repairs to address deteriorated existing structure in need of repairs, Structural alterations to renovate Guestrooms.
On file for this job
31 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY SPRINKLER LOOPS. NO CHANGE TO USE, EGRESS AND/OR OCCUPANCY.
On file for this job
6 documents
Interior partitions and partial demolition on floors Cellar, 1-16 and Penthouse which includes Hotel guestrooms, Tenant floors and Public spaces per plans filed herewith.
On file for this job
24 documents · 3 drawing sheets
Floor 7Under Construction52p · 3 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Proposed repairs at Sub-Cellar and Cellar, shaft infills and shaft relocations at Guestrooms Flrs 3 through 16 (Marketing 17), Structural repairs to address deteriorated existing structure in need of repairs, Structural alterations to renovate Guestrooms.
On file for this job
31 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY SPRINKLER LOOPS. NO CHANGE TO USE, EGRESS AND/OR OCCUPANCY.
On file for this job
6 documents
Interior partitions and partial demolition on floors Cellar, 1-16 and Penthouse which includes Hotel guestrooms, Tenant floors and Public spaces per plans filed herewith.
On file for this job
24 documents · 1 drawing sheet
Floor 6Under Construction54p · 3 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Proposed repairs at Sub-Cellar and Cellar, shaft infills and shaft relocations at Guestrooms Flrs 3 through 16 (Marketing 17), Structural repairs to address deteriorated existing structure in need of repairs, Structural alterations to renovate Guestrooms.
On file for this job
31 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY SPRINKLER LOOPS. NO CHANGE TO USE, EGRESS AND/OR OCCUPANCY.
On file for this job
6 documents
Interior partitions and partial demolition on floors Cellar, 1-16 and Penthouse which includes Hotel guestrooms, Tenant floors and Public spaces per plans filed herewith.
On file for this job
24 documents · 3 drawing sheets
Floor 5Under Construction52p · 3 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Proposed repairs at Sub-Cellar and Cellar, shaft infills and shaft relocations at Guestrooms Flrs 3 through 16 (Marketing 17), Structural repairs to address deteriorated existing structure in need of repairs, Structural alterations to renovate Guestrooms.
On file for this job
31 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY SPRINKLER LOOPS. NO CHANGE TO USE, EGRESS AND/OR OCCUPANCY.
On file for this job
6 documents
Interior partitions and partial demolition on floors Cellar, 1-16 and Penthouse which includes Hotel guestrooms, Tenant floors and Public spaces per plans filed herewith.
On file for this job
24 documents · 1 drawing sheet
Floor 4Under Construction54p · 3 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Proposed repairs at Sub-Cellar and Cellar, shaft infills and shaft relocations at Guestrooms Flrs 3 through 16 (Marketing 17), Structural repairs to address deteriorated existing structure in need of repairs, Structural alterations to renovate Guestrooms.
On file for this job
31 documents · 2 drawing sheets
INSTALLATION OF TEMPORARY SPRINKLER LOOPS. NO CHANGE TO USE, EGRESS AND/OR OCCUPANCY.
On file for this job
6 documents
Interior partitions and partial demolition on floors Cellar, 1-16 and Penthouse which includes Hotel guestrooms, Tenant floors and Public spaces per plans filed herewith.
On file for this job
24 documents · 2 drawing sheets
Floor 3Under Construction56p · 3 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Proposed repairs at Sub-Cellar and Cellar, shaft infills and shaft relocations at Guestrooms Flrs 3 through 16 (Marketing 17), Structural repairs to address deteriorated existing structure in need of repairs, Structural alterations to renovate Guestrooms.
On file for this job
31 documents · 4 drawing sheets
INSTALLATION OF TEMPORARY SPRINKLER LOOPS. NO CHANGE TO USE, EGRESS AND/OR OCCUPANCY.
On file for this job
6 documents · 1 drawing sheet
Interior partitions and partial demolition on floors Cellar, 1-16 and Penthouse which includes Hotel guestrooms, Tenant floors and Public spaces per plans filed herewith.
On file for this job
24 documents · 1 drawing sheet
Floor 2Under Construction54p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Sprinklers · Structural
Proposed repairs at Sub-Cellar and Cellar, shaft infills and shaft relocations at Guestrooms Flrs 3 through 16 (Marketing 17), Structural repairs to address deteriorated existing structure in need of repairs, Structural alterations to renovate Guestrooms.
On file for this job
31 documents · 2 drawing sheets
Structural alterations to the public spaces of the hotel.
On file for this job
36 documents · 2 drawing sheets
PARTIAL INTERIOR RENOVATION OF EXIST. 1ST FLOOR SPACES WITH PUBLIC BAR SPACE. NEW FINISHES, LIGHTING AND REPLACEMENT OF EXIST. FIREPLACE. NEW EXTERIOR LIGHTING FIXTURES, WINDOW AWNINGS AND REPLACEMENT OF EXIST. BRONZE DOOR WITHIN EXISTING MASONRY OPENING.
On file for this job
21 documents · 4 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 1Under Construction152p · 9 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
PARTIAL INTERIOR RENOVATION OF EXISTING 1ST FLOOR SPACES INCLUSIVE OF TOILET ROOMS AND HOTEL LOBBY. NEW FINISHES AND LIGHTING WITH PARTITION MODIFICATIONS. UPDATES TO EXISTING MARQUEE WITH NEW METAL PANEL FINISH AND MODIFIED LIGHTING.
On file for this job
17 documents · 11 drawing sheets
Proposed repairs at Sub-Cellar and Cellar, shaft infills and shaft relocations at Guestrooms Flrs 3 through 16 (Marketing 17), Structural repairs to address deteriorated existing structure in need of repairs, Structural alterations to renovate Guestrooms.
On file for this job
31 documents · 3 drawing sheets
Structural alterations to the public spaces of the hotel.
On file for this job
36 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
CellarUnder Construction55p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Sprinklers · Structural
Proposed repairs at Sub-Cellar and Cellar, shaft infills and shaft relocations at Guestrooms Flrs 3 through 16 (Marketing 17), Structural repairs to address deteriorated existing structure in need of repairs, Structural alterations to renovate Guestrooms.
On file for this job
31 documents · 4 drawing sheets
Structural alterations to the public spaces of the hotel.
On file for this job
36 documents · 2 drawing sheets
INSTALLATION OF TEMPORARY SPRINKLER LOOPS. NO CHANGE TO USE, EGRESS AND/OR OCCUPANCY.
On file for this job
6 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Sub-CellarUnder Construction45p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Sprinklers · Structural
Proposed repairs at Sub-Cellar and Cellar, shaft infills and shaft relocations at Guestrooms Flrs 3 through 16 (Marketing 17), Structural repairs to address deteriorated existing structure in need of repairs, Structural alterations to renovate Guestrooms.
On file for this job
31 documents · 6 drawing sheets
INSTALLATION OF TEMPORARY SPRINKLER LOOPS. NO CHANGE TO USE, EGRESS AND/OR OCCUPANCY.
On file for this job
6 documents
No filed description on record for this job.
On file for this job
5 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.