← Back
BuildNYC
Office with commercial, 7-19 stories
2 METROTECH CENTER
BROOKLYN · BIN 3255603
💬 Discuss this project
1989Year Built
11Stories
O6Building Class
C6-1AZoning
598,232 sfGross Floor Area
24Units
LL97 CoveredRent Stabilized1 Active Violation ▸FISP: SWARMPFDNY Report ↗
Office with commercial, 7-19 stories · 53,750 sf lot · 11.13 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNew York City Department of EducationUnder Construction29p · 4 filings · 20 docs
Floor 12New York City Department of EducationUnder Construction7p · 1 filing · 8 docs
Floor 11New York City Department of Education, CompassUnder Construction84p · 10 filings · 20 docs
Floor 10NYU Tandon School of Engineering73p · 5 filings · 17 docs
Floor 9NYU Tandon School of Engineering66p · 4 filings · 16 docs
Floor 8NYU Tandon School of Engineering, New York University: Teach50p · 9 filings · 14 docs
Floor 7Forest City Jay Street Associates,15p · 1 filing · 9 docs
Floor 6Forest City Jay Street Associates,39p · 6 filings · 20 docs
Floor 5Big Eye Sushi36p · 4 filings · 20 docs
Floor 4Big Eye Sushi2p · 2 filings · 8 docs
Floor 3New York City Department of Education, Big Eye SushiUnder Construction35p · 8 filings · 20 docs
Floor 2Big Eye Sushi2p · 2 filings · 8 docs
Floor 1Five Guys, Blank Street +128p · 5 filings · 20 docs
CellarBrookfield Properties (USA II ) LLC4p · 2 filings · 19 docs
Sub-CellarBrookfield Properties (USA II ) LLC2p · 1 filing · 8 docs
Site & exteriorFive Guys, Pret A Manger19p · 12 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Forest City Jay Street Associates11107/08/2026
Brookfield Properties5110/13/2026
FC Hanson Office Associates1107/08/2026
FC Bridge St Associates II1003/21/2026
First New York Partners803/22/2026
Fiveguys304/09/2026
Kimaqu203/21/2026
First NY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J.A.M. Associates9203/21/2026
Signs Cad603/21/2026
Kazam Consultants1403/21/2026
Louis Striar403/21/2026
AE Design Solution203/21/2026
Royal Expediting103/21/2026
Joel Phagoo P.E203/21/2026
Municipal Building Consultants103/21/2026
Paul Fusco Consulting203/21/2026
Joel Phagoo P E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Brennan OperatingGeneral Contractor807/08/2026
Balaton ConsultingSign hanger707/08/2026
Brosna ConstructionGeneral Contractor607/08/2026
Signs CadSign hanger507/08/2026
AMA Design BuildGeneral Contractor510/17/2026
Full Capacity FireFire Protection407/08/2026
White Hill Restorationspecialty_contractor403/21/2026
Abco-Peerless SprinklerFire Protection308/16/2026
Structure ToneGeneral Contractor307/08/2026
Fresh Meadow Mechanical PlumbingPlumbing307/08/2026
Par Plumbing CoPlumbing210/03/2026
Borowide Elect'l ContractorsElectrical203/22/2026
Fresh Meadow Mechanicalspecialty_contractor203/21/2026
M & S Mechanical Servicesspecialty_contractor207/08/2026
SPK/Lewis ConstructionGeneral Contractor207/08/2026
Everest ScaffoldingScaffold203/21/2026
Anesis ServicesFire Protection207/08/2026
Malatesta PaladinoGeneral Contractor107/08/2026
Difalzo Electric NYElectrical103/22/2026
Quest Builders GroupGeneral Contractor107/08/2026
Fred Geller ElectricalElectrical103/21/2026
Elemco Testing Co Inc DbaElectrical103/21/2026
Victory Building & ConsGeneral Contractor104/09/2026
Nycom ElectricalElectrical103/22/2026
Andamio ScaffoldingScaffold107/08/2026
Hudson Plumbing & MCHPlumbing107/08/2026
Newbridge Electl ContngElectrical103/22/2026
RPJ ElectricElectrical103/21/2026
A&A PlumbingPlumbing107/08/2026
Gemini Electric CoElectrical103/22/2026
Allstate SprinklerFire Protection107/08/2026
Bravo ElectricElectrical103/21/2026
Bedrock Plumbing & HeatingPlumbing107/08/2026
Champ Plumbing & HeatingPlumbing107/08/2026
Danton Plumbing & HeatingPlumbing107/08/2026
Par Plumbing Co., Inc.oFire Protection103/21/2026
Alson Electrical ContractingElectrical103/21/2026
Syed-Naqvi AltafElectrical103/21/2026
Concept Construction ServiceGeneral Contractor107/08/2026
Danton Plumbing & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Catalpa Special Inspectio20041608/17/2026
Metric Consulting and Ins1803508/04/2026
MEP Inspections1102811/26/2025
Autographic Co1579501/27/2025
Kline Engineering10071702/28/2023
Skytesting Services3707103/04/2022
Building Lifecycle
All (300)Filed (65)Permit Issued (59)Signed Off (39)Facade (FISP) (3)Violation (26)Inspection (22)Objection (56)Special Inspection (30)
10/16/2026
Permit issued — General Construction
B01436121-I1-GC-CX
10/02/2026
Permit issued — Plumbing
B01436121-S2-PL
09/15/2026
Filed — Alteration
Plumbing removal of based building piping and water piping connected to cooling towers.
B01436121-P1
09/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/10/2026
Special inspection requirement — Post-installed Anchors
08/19/2026
Permit issued — Mechanical Systems
B01436121-S1-MS
08/17/2026
Filed — Alteration
Plumbing removal of based building piping and water piping connected to cooling towers.
B01436121-S2
08/17/2026
Filed — Alteration
Plumbing removal of based building piping and water piping connected to cooling towers.
B01436121-S1
08/14/2026
Permit issued — Standpipe
B01317564-I1-EW-SD
08/14/2026
Permit issued — Sprinklers
B01317564-I1-EW-SP
08/12/2026
Objection resolved — Addressed
08/04/2026
Filed — Alteration
Plumbing removal of based building piping and water piping connected to cooling towers.
B01436121-I1
08/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
07/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
07/24/2026
Special inspection requirement — Final
ERIC BERLENT
07/16/2026
Signed off — Alteration
REMOVAL OF EXISTING STRUCTURAL SLAB, CORRODED DECK &FIREPROOFING. REPLACE SLAB BETWEEN EXISTING FRAMING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00251224-I1
06/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/16/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/21/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/23/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/31/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/30/2026
Permit issued — Mechanical Systems
B01287252-I1-MS
03/17/2026
Objection resolved — Addressed
03/16/2026
Permit issued — General Construction
B01287126-I1-GC
02/23/2026
Objection resolved — Addressed
02/23/2026
Objection resolved — Addressed
02/23/2026
Special inspection requirement — Interior lighting power
ERIC BERLENT
02/23/2026
Special inspection requirement — Lighting controls
ERIC BERLENT
02/19/2026
Permit issued — Plumbing
B01287329-I1-PL
02/10/2026
Objection resolved — Addressed
02/10/2026
Objection resolved — Addressed
02/10/2026
Objection resolved — Addressed
02/06/2026
Permit issued — Structural
B01343773-I1-ST
01/30/2026
Permit issued — Sprinklers
B01318648-I1-EW-SP
01/29/2026
Objection resolved — Addressed
01/29/2026
Objection resolved — Addressed
01/29/2026
Objection resolved — Addressed
01/29/2026
Objection resolved — Addressed
01/29/2026
Objection resolved — Addressed
01/29/2026
Objection resolved — Addressed
01/29/2026
Objection resolved — Addressed
01/29/2026
Objection resolved — Addressed
01/29/2026
Objection resolved — Addressed
01/29/2026
Objection resolved — Addressed
01/23/2026
Filed — Alteration
Installation of reinforcing steel to support additional weight of data center racking and equipment.
B01343773-I1
01/16/2026
Objection resolved — Addressed
01/15/2026
Objection resolved — Addressed
01/13/2026
Objection resolved — Addressed
01/12/2026
Objection resolved — Addressed
01/08/2026
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
01/08/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
01/08/2026
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
01/06/2026
Objection raised — Mechanical
01/06/2026
Objection raised — Inspections
01/06/2026
Objection raised — Mechanical
01/06/2026
Objection raised — Fire_Protection
12/30/2025
Objection raised — Egress
12/30/2025
Objection raised — Admin
12/30/2025
Objection raised — Fire_Protection
12/30/2025
Objection raised — Egress
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedAMA Design Build10/16/2026
DOB NOWPlumbingPermit IssuedPar Plumbing Co10/02/2026
DOB NOWMechanical SystemsPermit IssuedAMA Design Build08/19/2026
DOB NOWStandpipePermit IssuedAbco-Peerless Sprinkler08/14/2026
DOB NOWSprinklersPermit IssuedAbco-Peerless Sprinkler08/14/2026
DOB NOWMechanical SystemsPermit IssuedAMA Design Build03/30/2026
DOB NOWGeneral ConstructionPermit IssuedAMA Design Build03/16/2026
DOB NOWPlumbingPermit IssuedPar Plumbing Co02/19/2026
DOB NOWStructuralPermit IssuedAMA Design Build02/06/2026
DOB NOWSprinklersPermit IssuedAbco-Peerless Sprinkler01/30/2026
DOB NOWStructuralPermit IssuedM & S Mechanical Services11/21/2025
DOB NOWMechanical SystemsPermit IssuedM & S Mechanical Services10/30/2025
DOB NOWGeneral ConstructionPermit IssuedVictory Building & Cons07/30/2025
DOB NOWSignSigned-offSigns Cad03/25/2025
DOB NOWSignSigned-offSigns Cad03/25/2025
DOB NOWSignSigned-offSigns Cad03/25/2025
DOB NOWSuspended ScaffoldPermit IssuedWhite Hill Restoration04/25/2024
DOB NOWStructuralSigned-offMalatesta Paladino04/08/2024
DOB NOWSuspended ScaffoldSigned-offWhite Hill Restoration03/26/2024
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding03/15/2024
DOB NOWSprinklersSigned-offFull Capacity Fire12/01/2022
DOB NOWGeneral ConstructionSigned-offWhite Hill Restoration11/28/2022
DOB NOWPlumbingSigned-offBedrock Plumbing & Heating11/23/2022
DOB NOWGeneral ConstructionSigned-offConcept Construction Service11/18/2022
DOB NOWSprinklersSigned-offAllstate Sprinkler11/18/2022
DOB NOWMechanical SystemsSigned-offStructure Tone11/10/2022
DOB NOWGeneral ConstructionSigned-offStructure Tone11/07/2022
DOB NOWGeneral ConstructionSigned-offBrennan Operating07/18/2022
DOB NOWMechanical SystemsSigned-offBrennan Operating07/18/2022
DOB NOWGeneral ConstructionSigned-offBrennan Operating07/16/2022
DOB NOWMechanical SystemsSigned-offFresh Meadow Mechanical06/18/2022
DOB NOWGeneral ConstructionSigned-offQuest Builders Group05/20/2022
DOB NOWSprinklersSigned-offFull Capacity Fire04/15/2022
DOB NOWBoiler EquipmentSigned-offMichael Burns P&H02/25/2022
DOB NOWBoiler EquipmentSigned-offChamp Plumbing & Heating01/20/2022
DOB NOWMechanical SystemsSigned-offBrennan Operating10/22/2021
DOB NOWGeneral ConstructionSigned-offBrennan Operating10/14/2021
DOB NOWSprinklersSigned-offFull Capacity Fire09/28/2021
DOB NOWPlumbingSigned-offA&A Plumbing09/24/2021
DOB NOWBoiler EquipmentSigned-offMichael Burns P&H08/05/2021
+ 60 more permits on file
2 projects · most recent 11/25/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/25/2025Permit IssuedAMA Design BuildAir Conditioning Systems
Cooling
Vertiv CR032RC 61,600 BTU · Crac Unit ×50
CR040RC 108,000 BTU · Crac Unit ×8
Liebert CW084U 198,000 BTU · Crac Unit ×2
10/27/2025Permit IssuedM & S Mechanical ServicesAir Conditioning Systems
Cooling
York YK050LK2-FAH 1,200 tons · Chiller ×1
2 projects · most recent 11/26/2025
FiledStatusContractorScope
11/26/2025Permit IssuedAbco-Peerless Sprinkler43 heads
11/26/2025Permit IssuedAbco-Peerless Sprinkler963 heads, 4 outlets
4 projects · most recent 09/15/2026
Water/Sanitary Gas
FiledStatusContractorScope
09/15/2026Permit IssuedPar Plumbing CoWater/Sanitary
11/26/2025———
11/26/2025———
07/28/2021Permit IssuedFresh Meadow Mechanical PlumbingGas
25 projects · most recent 09/18/2026
General Wiring
FiledStatusContractorScope
09/18/2026Permit IssuedFred Geller ElectricalGeneral Wiring
09/18/2026Permit IssuedFred Geller ElectricalGeneral Wiring
02/18/2026Permit IssuedAtlas-Acon Electric ServiceGeneral Wiring
07/03/2025CompleteSigns Cad—
07/03/2025CompleteSigns Cad—
07/02/2025CompleteSigns Cad—
07/02/2025CompleteSigns Cad—
07/02/2025CompleteSigns Cad—
03/22/2024CompleteBorowide Elect'l Contractors—
05/23/2023Permit IssuedGemini Electric CoGeneral Wiring
12/16/2022CompleteH. & L. ElectricGeneral Wiring
11/10/2022CompleteH. & L. ElectricGeneral Wiring
04/28/2022CompleteJas Electrical ServicesGeneral Wiring
04/21/2022CompleteDifalzo Electric NYGeneral Wiring
04/21/2022CompleteDifalzo Electric NYGeneral Wiring
3 projects · most recent 09/15/2026
Steel Concrete
FiledStatusContractorScope
09/15/2026Permit IssuedAMA Design Build2 scope_items
01/23/2026Permit IssuedAMA Design BuildSteel
11/26/2019Signed-offWhite Hill RestorationSteel, Concrete
▾Field Inspections (DOB CAP) — 22
DateTypeResultReport
06/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/16/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/21/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/23/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/31/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/30/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/30/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/09/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/02/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/28/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/27/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/30/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/10/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/29/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/26/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/15/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/16/2022Pass-Final Boiler Equipment InspectionPassView ↗
03/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/14/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/25/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/23/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/23/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 92
DateRequirementInspectorRole
09/10/2026Post-installed Anchors—special
09/10/2026Fire-Resistant Penetrations and Joints—special
08/04/2026Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
07/24/2026FinalERIC BERLENTprogress
07/24/2026Fire-Resistant Penetrations and JointsERIC BERLENTspecial
02/23/2026Interior lighting powerERIC BERLENTenergy_progress
02/23/2026Lighting controlsERIC BERLENTenergy_progress
01/08/2026Structural Steel - WeldingSAMI HAJJAR P.Especial
01/08/2026Structural Steel - DetailsSAMI HAJJAR P.Especial
01/08/2026FinalSAMI HAJJAR P.Eprogress
11/17/2025Fire-Resistance Rated ConstructionERIC BERLENTprogress
11/17/2025Fire-Resistant Penetrations and JointsERIC BERLENTspecial
11/13/2025Sprinkler SystemsNicolas Crosettospecial
10/02/2025HVAC-R and service water piping design and insulationERIC BERLENTenergy_progress
10/02/2025HVAC-R and service water heating equipmentERIC BERLENTenergy_progress
10/02/2025HVAC-R and service water heating system controlsERIC BERLENTenergy_progress
10/02/2025Post-installed AnchorsSAMI HAJJAR P.Especial
10/02/2025FinalSAMI HAJJAR P.Eprogress
10/02/2025Mechanical SystemsERIC BERLENTspecial
10/02/2025FinalERIC BERLENTprogress
10/02/2025Maintenance informationERIC BERLENTenergy_progress
09/15/2025FinalERIC BERLENTprogress
03/03/2025FinalRyan Hungprogress
02/28/2025FinalRyan Hungprogress
01/24/2025Structural Stability – Alterations of existing buildingsasghar Ghodsispecial
Latest 25 of 92.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
New York City Department of EducationEducationFloors 3, 11, 12
Project B01436121 Alteration · Permit Entire · 08/04/2026
Project B01287126 Alteration · Permit Entire · 11/20/2025
Five GuysRestaurant / Food ServiceFloor 1
Project B01071286 Alteration · Permit Entire · 07/24/2025
Project B01179763 Alteration · LOC Issued · 03/24/2025
Project B01179797 Alteration · LOC Issued · 03/24/2025
Project B01179803 Alteration · LOC Issued · 03/24/2025
Blank StreetRestaurant / Food ServiceFloor 1
Project B00706386 Alteration · LOC Issued · 05/16/2022
NYU Tandon School of EngineeringEducationFloors 8–10
Project B00335095 Alteration · LOC Issued · 09/23/2021
Project B00335145 Alteration · LOC Issued · 09/23/2021
Project B00335170 Alteration · LOC Issued · 09/23/2021
Project B00587827 Alteration · LOC Issued · 09/22/2021
Project B00512221 Alteration · LOC Issued · 05/11/2021
Project B00511485 Alteration · LOC Issued · 05/10/2021
Project B00511503 Alteration · LOC Issued · 05/10/2021
Project B00511562 Alteration · LOC Issued · 05/10/2021
Project B00512129 Alteration · LOC Issued · 05/10/2021
Project B00512191 Alteration · LOC Issued · 05/10/2021
Project B00513016 Alteration · LOC Issued · 05/10/2021
Project B00265012 Alteration · LOC Issued · 12/11/2019
CompassOfficeFloor 11
Project B00517158 Alteration · Permit Entire · 07/28/2021
Project B00517145 Alteration · LOC Issued · 06/22/2021
New York University: Teaching & Learning CenterEducationFloor 8
Project B00266828 Alteration · LOC Issued · 02/13/2020
Project B00266859 Alteration · LOC Issued · 02/13/2020
Pret A MangerRestaurant / Food Service—
Project B00145384 Alteration · LOC Issued · 04/03/2019
Project B00145388 Alteration · LOC Issued · 04/03/2019
Project B00145400 Alteration · LOC Issued · 04/03/2019
Big Eye SushiRestaurant / Food ServiceFloors 1–5
Project B00054580 Alteration · LOC Issued · 10/10/2018
Project B00054587 Alteration · LOC Issued · 10/10/2018
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,860 on file (BIS + DOB NOW)
▸Plans & Drawings66
▸DOB NOWPlans/Sketch48
09/02/2026B00079288-I1Request digital key ↗
09/02/2026B00054580-I1Request digital key ↗
09/02/2026B00054587-I1Request digital key ↗
Showing 3 of 48 on file for this type
▸DOB NOWPlans/Sketch - Sign7
09/02/2026B00145384-I1Request digital key ↗
09/02/2026B00145400-I1Request digital key ↗
09/02/2026B00145394-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/02/2026B00266859-I1Request digital key ↗
09/02/2026B00234722-I1Request digital key ↗
09/01/2026B00335170-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/02/2026B00265012-I1Request digital key ↗
09/02/2026B00266828-I1Request digital key ↗
09/01/2026B00335145-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026B00234722-I1Request digital key ↗
09/01/2026B00335095-I1Request digital key ↗
08/15/2026B00234722-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00251224-I1Request digital key ↗
▸Applications & Permits322
▸BISPLAN / WORK APPROVAL APPLICATION174
11/29/2022320408983Open ↗
11/18/2022320408983Open ↗
04/14/2022321054167Open ↗
Showing 3 of 174 on file for this type
▸BISWORK PERMIT APPLICATION132
07/16/2020340741308Open ↗
02/05/2020321851402Open ↗
01/02/2020322014137Open ↗
Showing 3 of 132 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION14
03/01/2019321608685Open ↗
02/25/2019321851484Open ↗
02/25/2019321851484Open ↗
Showing 3 of 14 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISADDRESS - NEW HOUSE NUMBER APPROVED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications468
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION237
02/05/2020321851402Open ↗
12/04/2019321851484Open ↗
12/04/2019321851484Open ↗
Showing 3 of 237 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature66
10/14/2026B01436121-P1Open ↗
09/28/2026B01436121-S1Open ↗
09/28/2026B01436121-S2Open ↗
Showing 3 of 66 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST40
02/05/2020321851402Open ↗
11/29/2019322014137Open ↗
11/08/2019322007564Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature39
09/27/2026B01343773-I1Open ↗
09/27/2026B01343773-I1Open ↗
09/23/2026B00511562-I1Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWProgress Inspector Seal & Signature32
09/27/2026B01343773-I1Open ↗
09/23/2026B01296963-I1Open ↗
09/23/2026B01296963-I1Open ↗
Showing 3 of 32 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT31
07/10/2020340741308Open ↗
02/05/2020321851402Open ↗
11/29/2019322014137Open ↗
Showing 3 of 31 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/10/2020340741308Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/10/2020340741308Open ↗
Showing 1 of 2 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment170
▸BISSELF-CERT PLUMBING NOTICE63
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 63 on file for this type
▸BISSCHEDULE B - PLUMBING32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA23
01/13/2022321054167Open ↗
05/06/2019321608685Open ↗
04/17/2019321794144Open ↗
Showing 3 of 23 on file for this type
▸BISEQUIPMENT USE PERMITS16
08/07/2019321730926Open ↗
Showing 1 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE12
02/28/2019321851484Open ↗
Showing 1 of 12 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT11
03/13/2020321851484Open ↗
08/07/2019321730926Open ↗
Showing 2 of 11 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8510
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-842
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISST-1 Street Tree Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos40
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
11/14/2019321851484Open ↗
Showing 1 of 7 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/02/2026B00054580-I1Open ↗
09/02/2026B00054587-I1Open ↗
08/21/2026B01071286-I1Open ↗
▸Energy Compliance118
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS55
02/05/2020321851402Open ↗
12/04/2019321851484Open ↗
12/04/2019321851484Open ↗
Showing 3 of 55 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS23
12/14/2020321851402Open ↗
12/04/2019321851484Open ↗
08/27/2019320370647Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: ENERGY15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISTR8: Energy Code Progress Inspections10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.5
08/13/2026B00512129-I1Open ↗
08/13/2026B00335145-I1Open ↗
08/13/2026B00511503-I1Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
06/08/2021322000375Open ↗
09/13/2020322007564Open ↗
06/09/2020322014137Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
07/10/2020340741308Open ↗
06/09/2020322014137Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
07/10/2020340741308Open ↗
Showing 1 of 2 on file for this type
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00634085-I1Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY6
06/08/2021322000375Open ↗
12/14/2020321851402Open ↗
09/13/2020322007564Open ↗
Showing 3 of 6 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Approvals, Objections & Sign-offs244
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST130
04/13/2022321054167Open ↗
06/08/2021322000375Open ↗
02/23/2021320408983Open ↗
Showing 3 of 130 on file for this type
▸BISADMINISTRATIVE OBJECTIONS66
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 66 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE11
12/20/2021320516615Open ↗
12/16/2021320516615Open ↗
12/01/2021320516615Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)6
08/13/2026B00266859-I1Open ↗
08/13/2026B00234722-I1Open ↗
08/13/2026B00706386-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/13/2026B00266859-I1Open ↗
08/13/2026B00265012-I1Open ↗
08/13/2026B00266828-I1Open ↗
▸BISDESIGN COMM. SIGNOFF: CITY-OWNED PROPERTY (EXTERIOR WORK)1
06/09/2020322014137Open ↗
▸BISFEE DEFERRAL LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISOP-97 Escrow Agent Letter for Temporary Certificate of Occupancy1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFLAME SPREAD/FIRE LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership190
▸BISCOST AFFIDAVIT186
03/15/2022321054167Open ↗
07/10/2020340741308Open ↗
02/05/2020321851402Open ↗
Showing 3 of 186 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
06/08/2021322000375Open ↗
12/21/2020321851402Open ↗
09/13/2020322007564Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms205
▸BISEFILING COVER SHEET102
02/05/2020321851402Open ↗
11/29/2019322014137Open ↗
11/12/2019322007564Open ↗
Showing 3 of 102 on file for this type
▸BISADDITIONAL INFORMATION53
06/28/2022320516615Open ↗
12/21/2021320516615Open ↗
06/01/2021322000375Open ↗
Showing 3 of 53 on file for this type
▸BISBOROUGH INTAKE FORM45
03/13/2020321851484Open ↗
12/27/2019321851484Open ↗
12/27/2019321851484Open ↗
Showing 3 of 45 on file for this type
▸BISeFiling Job Application Cover Sheet5
07/10/2020340741308Open ↗
Showing 1 of 5 on file for this type
▸Other Documents14
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPlot Diagram3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
08/14/2020320408983Open ↗
08/13/2020320516615Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWManufacturer's Specifications2
08/13/2026B01020280-P1Open ↗
08/13/2026B01020280-I1Open ↗
▸DOB NOWCalculations2
08/13/2026B01020280-P1Open ↗
Showing 1 of 2 on file for this type
▸BISCPC: HUDSON YARDS FINAL CERTIFICATION1
12/27/2019321851484Open ↗