← Back
Factory, light manufacturing
2 PRESTON COURT
BROOKLYN · BIN 3222321
💬 Discuss this project
1952Year Built
1Stories
F5Building Class
M1-1Zoning
6,700 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Factory, light manufacturing · Owner of record: EVERGREEN MG LLC · 6,912 sf lot · 0.97 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Floor 16p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
YYBUNKERHVACLLC1007/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AYALA ENGINEERING PC606/28/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YBL NY1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M. INT'L ENGINEERING PLLCGeneral Contractor407/08/2026
APEX ELECT'L CONTR. INC.Electrical103/22/2026
DYNAMIC PLBG & SPRKLR CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AYALA ENGINEERING P.C.9207103/28/2024
Building Lifecycle
All (32)Filed (6)Permit Issued (3)Signed Off (3)Violation (5)Inspection (5)Objection (4)Special Inspection (6)
07/16/2024
Signed off — Alteration
JOB FILED INTERIOR RENOVATION OF FACTORY OFFICE AREA INCLUDING NEW NON-BEARING PARTITIONS AND PLUMBING FIXTURE TO RESOLVE ECB VIOLATIONS#35667697M AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01025052-I1
07/16/2024
Signed off — Alteration
JOB FILED INTERIOR RENOVATION OF FACTORY OFFICE AREA INCLUDING NEW NON-BEARING PARTITIONS AND PLUMBING FIXTURE TO RESOLVE ECB VIOLATIONS#35667697M AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01025052-S2
07/12/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/05/2024
Special inspection requirement — Energy Code Compliance Inspections
Pablo Ayala
07/05/2024
Special inspection requirement — Interior lighting power
Pablo Ayala
06/28/2024
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF FACTORY OFFICE AREA INCLUDING NEW NON-BEARING PARTITIONS AND PLUMBING FIXTURE TO RESOLVE ECB VIOLATIONS#35667697M AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01025052-P3
06/28/2024
Signed off — Alteration
JOB FILED INTERIOR RENOVATION OF FACTORY OFFICE AREA INCLUDING NEW NON-BEARING PARTITIONS AND PLUMBING FIXTURE TO RESOLVE ECB VIOLATIONS#35667697M AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01025052-S1
06/28/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/18/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/07/2024
Objection raised — Scope
06/07/2024
Objection resolved — Addressed
06/07/2024
Objection raised — Scope
06/07/2024
Objection resolved — Addressed
06/06/2024
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF FACTORY OFFICE AREA INCLUDING NEW NON-BEARING PARTITIONS AND PLUMBING FIXTURE TO RESOLVE ECB VIOLATIONS#35667697M AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01025052-P1
06/06/2024
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF FACTORY OFFICE AREA INCLUDING NEW NON-BEARING PARTITIONS AND PLUMBING FIXTURE TO RESOLVE ECB VIOLATIONS#35667697M AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01025052-P2
06/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/04/2024
Special inspection requirement — Energy Code Compliance Inspections
Pablo Ayala
06/04/2024
Special inspection requirement — Interior lighting power
Pablo Ayala
06/03/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/31/2024
Permit issued — Plumbing
B01025052-S1-PL
05/09/2024
Permit issued — General Construction
B01025052-I1-GC
05/09/2024
Permit issued — Structural
B01025052-S2-ST
04/15/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/28/2024
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF FACTORY OFFICE AREA INCLUDING NEW NON-BEARING PARTITIONS AND PLUMBING FIXTURE TO RESOLVE ECB VIOLATIONS#35667697M AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01025052-S2
03/28/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Pablo Ayala
03/26/2024
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF FACTORY OFFICE AREA INCLUDING NEW NON-BEARING PARTITIONS AND PLUMBING FIXTURE TO RESOLVE ECB VIOLATIONS#35667697M AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01025052-I1
03/26/2024
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF FACTORY OFFICE AREA INCLUDING NEW NON-BEARING PARTITIONS AND PLUMBING FIXTURE TO RESOLVE ECB VIOLATIONS#35667697M AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01025052-S1
03/25/2024
Special inspection requirement — Final
Pablo Ayala
03/17/2024
Violation issued (FDNY_NOV, closed)
03/16/2024
Violation issued (ECB, closed)
Construction
03/16/2024
Violation issued (ECB, closed)
Construction
03/16/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS05/31/2024
DOB NOWGeneral ConstructionSigned-offM. INT'L ENGINEERING PLLC05/09/2024
DOB NOWStructuralSigned-offM. INT'L ENGINEERING PLLC05/09/2024
2 projects · most recent 07/23/2024
FiledStatusContractorScope
07/23/2024Permit IssuedA.C. MORGAN ELECTRIC2 meters, 1 new_meters
12/20/2018Permit IssuedAPEX ELECT'L CONTR. INC.1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/12/2024Pass-Final General Construction Non-Directive 14PassView ↗
06/28/2024Fail-Final General Construction Non-Directive 14FailView ↗
06/18/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/03/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
07/05/2024Energy Code Compliance InspectionsPablo Ayalaprogress
07/05/2024Interior lighting powerPablo Ayalaenergy_progress
06/04/2024Energy Code Compliance InspectionsPablo Ayalaprogress
06/04/2024Interior lighting powerPablo Ayalaenergy_progress
03/28/2024Structural Stability – Alterations of existing buildingsPablo Ayalaspecial
03/25/2024FinalPablo Ayalaprogress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026B01025052-P2Request digital key ↗
08/24/2026B01025052-P1Request digital key ↗
08/24/2026B01025052-S2Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026B01025052-P1Open ↗
08/24/2026B01025052-S2Open ↗
08/24/2026B01025052-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026B01025052-I1Open ↗
09/01/2026B01025052-I1Open ↗
08/29/2026B01025052-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026B01025052-S2Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/24/2026B01025052-P1Open ↗
08/24/2026B01025052-S2Open ↗
08/24/2026B01025052-S1Open ↗
Showing 3 of 6 on file for this type