← Back
Office only, 2-6 stories
2 ST NICHOLAS AVENUE
BROOKLYN · BIN 3072418
💬 Discuss this project
1931Year Built
2Stories
O2Building Class
M1-1Zoning
9,000 sfGross Floor Area
50Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Office only, 2-6 stories · Owner of record: WRM PROPERTIES INC · 4,500 sf lot · 2 FAR built · Flood zone X
Locations of Work
MechanicalFire Protection
Roof1p · 3 filings · 20 docs
Nothing on file for this building.
Building Lifecycle
All (36)Filed (6)Permit Issued (5)Signed Off (5)Violation (6)Special Inspection (14)
03/07/2023
Signed off — Alteration
FILING TO CORRECT AIR CONDITIONING UNIT MANUFACTURER INFORMATION / SPECIFICATION TO OBTAIN EQUIPMENT USE CERTIFICATION. NO CHANGE IN USE, OCCUPANCY OR EGRESS PERFORMED UNDER THIS APPLICATION
B00835091-I1
03/06/2023
Permit issued — Mechanical Systems
B00835091-I1-MS
03/01/2023
Filed — Alteration
FILING TO CORRECT AIR CONDITIONING UNIT MANUFACTURER INFORMATION / SPECIFICATION TO OBTAIN EQUIPMENT USE CERTIFICATION. NO CHANGE IN USE, OCCUPANCY OR EGRESS PERFORMED UNDER THIS APPLICATION
B00835091-I1
02/26/2023
Special inspection requirement — Final
JOSEPH BOTTA
02/26/2023
Special inspection requirement — Mechanical Systems
JOSEPH BOTTA
02/26/2023
Special inspection requirement — HVAC-R and service water heating equipment
JOSEPH BOTTA
02/02/2023
Violation issued (FDNY_NOV, closed)
09/09/2022
Signed off — Alteration
REPLACEMENT OF ROOF TOP COMPRESSOR UNIT IN-KIND TO OBTAIN NEW EQUIPMENT USE PERMIT FOR SAME. NO CHANGE IN USE OCCUPANCY OR EGREES TO BE PERFORMED UNDER THIS APPLICATION.
B00761458-I1
08/30/2022
Special inspection requirement — Mechanical Systems
FRANCISCO PEREZ
08/30/2022
Special inspection requirement — Final
JORGE ANDRES DIAZ
08/25/2022
Filed — Alteration
REPLACEMENT OF ROOF TOP COMPRESSOR UNIT IN-KIND TO OBTAIN NEW EQUIPMENT USE PERMIT FOR SAME. NO CHANGE IN USE OCCUPANCY OR EGREES TO BE PERFORMED UNDER THIS APPLICATION.
B00761458-P1
08/25/2022
Special inspection requirement — Final
JORGE ANDRES DIAZ
08/25/2022
Special inspection requirement — Mechanical Systems
FRANCISCO PEREZ
08/05/2022
Permit issued — Mechanical Systems
B00761458-I1-MS
06/21/2022
Filed — Alteration
REPLACEMENT OF ROOF TOP COMPRESSOR UNIT IN-KIND TO OBTAIN NEW EQUIPMENT USE PERMIT FOR SAME. NO CHANGE IN USE OCCUPANCY OR EGREES TO BE PERFORMED UNDER THIS APPLICATION.
B00761458-I1
01/26/2021
Signed off — Alteration
REPLACE EXISTING ROOF TOP UNIT AC UNIT (ORIGINALL INSTALLED UNDER DOB APPLICATION NO. 320483491) IN-KIND WITH NEW. NEW UNIT TO COMPLY WITH CURRENT 2020 MINIMUM SEER RATINGS. NO CHANGE IN USE OCCUPANCY OR EGRESS TO BE PERFORMED UNDER THIS APPLICATION.
B00416529-I1
01/12/2021
Permit issued — Mechanical Systems
B00416529-I1-MS
10/28/2020
Filed — Alteration
REPLACE EXISTING ROOF TOP UNIT AC UNIT (ORIGINALL INSTALLED UNDER DOB APPLICATION NO. 320483491) IN-KIND WITH NEW. NEW UNIT TO COMPLY WITH CURRENT 2020 MINIMUM SEER RATINGS. NO CHANGE IN USE OCCUPANCY OR EGRESS TO BE PERFORMED UNDER THIS APPLICATION.
B00416529-I1
10/21/2020
Special inspection requirement — HVAC insulation and sealing
Michael Mazzella
10/21/2020
Special inspection requirement — HVAC and service water heating system controls
Michael Mazzella
10/21/2020
Special inspection requirement — Maintenance information
Michael Mazzella
10/21/2020
Special inspection requirement — Energy Code Compliance Inspections
Michael Mazzella
10/20/2020
Special inspection requirement — Mechanical Systems
JOSEPH BOTTA
10/20/2020
Special inspection requirement — Final
JOSEPH BOTTA
10/20/2020
Special inspection requirement — HVAC and service water heating equipment
Michael Mazzella
08/14/2020
Signed off — Alteration
B00287157-I1
08/10/2020
Permit issued — Mechanical Systems
B00287157-I1-MS
03/11/2020
Signed off — Alteration
B00269863-I1
01/28/2020
Permit issued — Structural
B00269863-I1-ST
01/06/2020
Filed — Alteration
B00287157-I1
12/10/2019
Filed — Alteration
B00269863-I1
03/22/2017
Violation issued (FDNY_NOV, closed)
02/11/2012
Violation issued (ECB, closed)
Unknown
02/11/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/31/2011
Violation issued (FDNY_NOV, closed)
05/30/2006
Violation issued (FDNY_NOV, closed)
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DNA PLUMBING CONTRACTORS103/22/2026
JW PROPERTY SOLUTIONS403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHAEL SJ MAZZELLA, RA403/01/2023
AMPOL ENGINEERING101/06/2020
KZ ENGINEERING, P.C112/10/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FRANK BUENO EXPEDITING603/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MARTEN CONSTRUCTION CORPGeneral Contractor807/08/2026
HI COOL INCGeneral Contractor303/21/2026
RYBURN PHILLIPSElectrical203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSEPH BOTTA, PE, PC1139203/01/2023
FRANCISCO D. PEREZ PE3306208/25/2022
AMPOL ENGINEEIRNG1745101/06/2020
KZ ENGINEERING, P.C.4665112/10/2019
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMARTEN CONSTRUCTION CORP03/06/2023
DOB NOWMechanical SystemsSigned-offMARTEN CONSTRUCTION CORP08/05/2022
DOB NOWMechanical SystemsSigned-offHI COOL INC01/12/2021
DOB NOWMechanical SystemsSigned-offMARTEN CONSTRUCTION CORP08/10/2020
DOB NOWStructuralSigned-offMARTEN CONSTRUCTION CORP01/28/2020
BISPLISSUEDDNA PLUMBING CONTR. INC05/14/2013
BISOTISSUEDDNA PLUMBING CONTRACTORS10/26/2012
BISOTISSUEDDNA PLUMBING CONTRACTORS02/13/2012
BISPLISSUEDDNA PLUMBING CONTR. INC02/13/2012
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
02/26/2023FinalJOSEPH BOTTAprogress
02/26/2023Mechanical SystemsJOSEPH BOTTAspecial
02/26/2023HVAC-R and service water heating equipmentJOSEPH BOTTAenergy_progress
08/30/2022Mechanical SystemsFRANCISCO PEREZspecial
08/30/2022FinalJORGE ANDRES DIAZprogress
08/25/2022FinalJORGE ANDRES DIAZprogress
08/25/2022Mechanical SystemsFRANCISCO PEREZspecial
10/21/2020HVAC insulation and sealing Michael Mazzellaenergy_progress
10/21/2020HVAC and service water heating system controls Michael Mazzellaenergy_progress
10/21/2020Maintenance informationMichael Mazzellaenergy_progress
10/21/2020Energy Code Compliance InspectionsMichael Mazzellaprogress
10/20/2020Mechanical SystemsJOSEPH BOTTAspecial
10/20/2020FinalJOSEPH BOTTAprogress
10/20/2020HVAC and service water heating equipment Michael Mazzellaenergy_progress
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch3
08/29/2026B00761458-P1Request digital key ↗
08/29/2026B00761458-I1Request digital key ↗
08/27/2026B00835091-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00416529-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00269863-I1Request digital key ↗
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION3
05/16/2013320389192Open ↗
02/15/2012320389192Open ↗
02/15/2012320389192Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION3
10/14/2012320483491Open ↗
08/31/2012320483491Open ↗
11/09/2011320389192Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature11
09/27/2026B00835091-I1Open ↗
09/27/2026B00835091-I1Open ↗
08/30/2026B00761458-P1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
01/24/2014320389192Open ↗
08/31/2012320483491Open ↗
02/15/2012320389192Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/02/2026B00416529-I1Open ↗
08/29/2026B00761458-I1Open ↗
08/13/2026B00287157-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/27/2026B00835091-I1Open ↗
08/30/2026B00761458-P1Open ↗
08/23/2026B00416529-I1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment3
▸BISSELF-CERT PLUMBING NOTICE1
06/27/2013320389192Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
08/31/2012320483491Open ↗
▸BISSCHEDULE B - PLUMBING1
11/09/2011320389192Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/02/2026B00416529-I1Open ↗
08/29/2026B00761458-I1Open ↗
08/13/2026B00269863-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
11/09/2011320389192Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/31/2012320483491Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/24/2014320389192Open ↗
08/31/2012320483491Open ↗
▸BISTECHNICAL REPORT: ENERGY2
02/15/2012320389192Open ↗
11/09/2011320389192Open ↗
▸BISEN2 - As Built Energy Analysis1
05/13/2013320483491Open ↗
▸BISTR8: Energy Code Progress Inspections1
05/13/2013320483491Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS2
08/31/2012320483491Open ↗
11/09/2011320389192Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
01/24/2014320389192Open ↗
05/13/2013320483491Open ↗
08/31/2012320483491Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
08/31/2012320483491Open ↗
11/09/2011320389192Open ↗