BulkheadUnder Construction1p · 1 filing · 3 docs
EquipmentMechanical
Installation of suspended scaffold for facade work or inspection.
On file for this project
3 documents · 1 drawing sheet
Floor 161p · 1 filing · 3 docs
Fire ProtectionMechanical
No filed description on record for this project.
On file for this project
3 documents · 1 drawing sheet
Floor 15
Floor 14Under Construction3p · 2 filings · 10 docs
Fire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing
PLUMBING SCOPE IN CONJUNCTION WITH OFFICE RENOVATION PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents · 2 drawing sheets
No filed description on record for this project.
On file for this project
3 documents · 1 drawing sheet
Floor 13
Floor 122p · 1 filing · 17 docs
Fire ProtectionMechanical
Issued Permit Scope
Mechanical Systems
Installation of mechanical system as per plans filed herewith.
On file for this project
20 documents · 2 drawing sheets
Floor 11
Floor 10
Floor 92p · 1 filing · 4 docs
ArchitectureFire Protection
9TH FL: INTERIOR REMOVALS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
On file for this project
4 documents · 2 drawing sheets
Floor 81p · 1 filing · 3 docs
DM
No filed description on record for this project.
On file for this project
3 documents · 1 drawing sheet
Floor 77p · 5 filings · 17 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems
install A/C Units and associated ductwork for 7th Floor, Suite 701. as per plans filed herewith. No change to Use, Egress or Occupancy.
On file for this project
3 documents · 1 drawing sheet
Plumbing modifications for 7th Floor, Suite 701 as per plans filed herewith. No change to Use, Egress or Occupancy.
On file for this project
3 documents · 1 drawing sheet
Sprinkler system modification for 7th Floor, Suite 701 as per plans filed herewith. No change to Use, Egress or Occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 6Under Construction3p · 1 filing · 5 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction
INTERIOR MINOR REMOVALS AND RENOVATIONS FOR SUITE 603 AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents · 3 drawing sheets
Floor 5
Floor 42p · 1 filing · 3 docs
ArchitectureDMFire Protection
No filed description on record for this project.
On file for this project
3 documents · 2 drawing sheets
Floor 38p · 4 filings · 15 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing
HVAC INSTALLATION IN CONJUNCTION WITH OFFICE RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
PLUMBING SCOPE OF WORK IN CONJUNCTION WITH OFFICE RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
INTERIOR RENOVATION OF OFFICE SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 6 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 2
Floor 1Under Construction4p · 5 filings · 17 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing
Proposed interior demolition including bearing and non-bearing partitions, slab openings, convenience stairs, fixtures, finishes, cabinetry, casework, piping and electrical of existing Eating and Drinking Establishment on the 1st Mezz and Cellar levels.
On file for this project
8 documents
NEW SANITARY AND WASTE PLUMBING LINES AT CELLAR TENANT SPACE. NEW PLUMBING FIXTURES AND GAS KITCHEN EQUIPMENT AT FIRST FLOOR TENANT SPACE.
On file for this project
9 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
MezzanineUnder Construction3p · 4 filings · 20 docs
ArchitectureMechanical
Issued Permit Scope
General Construction
Proposed interior demolition including bearing and non-bearing partitions, slab openings, convenience stairs, fixtures, finishes, cabinetry, casework, piping and electrical of existing Eating and Drinking Establishment on the 1st Mezz and Cellar levels.
On file for this project
8 documents
No filed description on record for this project.
On file for this project
8 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
CellarUnder Construction2p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Proposed interior demolition including bearing and non-bearing partitions, slab openings, convenience stairs, fixtures, finishes, cabinetry, casework, piping and electrical of existing Eating and Drinking Establishment on the 1st Mezz and Cellar levels.
On file for this project
8 documents
NEW SANITARY AND WASTE PLUMBING LINES AT CELLAR TENANT SPACE. NEW PLUMBING FIXTURES AND GAS KITCHEN EQUIPMENT AT FIRST FLOOR TENANT SPACE.
On file for this project
9 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
5 documents · 1 drawing sheet
Basement2p · 1 filing · 3 docs
DMStructural
No filed description on record for this project.
On file for this project
3 documents · 2 drawing sheets