← Back
Other college and university
2 WEST LOOP ROAD
MANHATTAN · BIN 1090298
💬 Discuss this project
2015Year Built
4Stories
W6Building Class
C4-5Zoning
—Gross Floor Area
1Units
0 Open Violations
Other college and university · Owner of record: NYC ECONOMIC DEVELOPMENT CORPORATION · 1.91 FAR built · Flood zone AE
Locations of Work
Architecture
Floor 11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BAB R BAR INC103/22/2026
NYCEDC1303/22/2026
NYC ECONOMIC DEVELOPMENT CORP.1603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SNOHETTA302/28/2022
TOHFAZ UDDIN PE PC210/17/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE403/21/2026
JAM CONSULTANTS, INC.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NICHOLAS STEFANOUElectrical603/21/2026
NJS ELECL SERVICES CORP 002938General Contractor503/22/2026
YORK SCAFFOLD EQUIPMENT CORP.General Contractor407/08/2026
NTS ELECTRICAL, INCElectrical103/22/2026
Building Lifecycle
All (54)Filed (5)Permit Issued (3)Signed Off (2)Violation (15)Objection (24)Special Inspection (5)
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/30/2022
Special inspection requirement — Public Assembly Emergency Lighting
Christopher O'Malley
03/10/2022
Objection raised — Inspections
03/10/2022
Objection resolved — Addressed
02/28/2022
Filed — No Work
M00315010-P2
11/18/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/01/2021
Special inspection requirement — Public Assembly Emergency Lighting
FAWZY SALIB
08/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/20/2020
Objection resolved — Addressed
10/19/2020
Filed — No Work
M00315010-P1
10/19/2020
Objection raised — Scope
09/25/2020
Special inspection requirement — Public Assembly Emergency Lighting
FAWZY SALIB
03/10/2020
Objection raised — Inspections
03/10/2020
Objection resolved — Addressed
03/10/2020
Objection raised — Admin
03/10/2020
Objection resolved — Addressed
03/10/2020
Objection raised — Structural
03/10/2020
Objection resolved — Addressed
03/10/2020
Objection raised — Inspections
03/10/2020
Objection resolved — Addressed
03/10/2020
Objection raised — Structural
03/10/2020
Objection resolved — Addressed
03/10/2020
Objection raised — Inspections
03/10/2020
Objection resolved — Addressed
03/10/2020
Objection raised — Fire_Protection
03/10/2020
Objection resolved — Addressed
03/10/2020
Objection raised — Fire_Protection
03/10/2020
Objection resolved — Addressed
03/10/2020
Objection raised — Mechanical
03/10/2020
Objection resolved — Addressed
03/10/2020
Objection raised — Fire_Protection
03/10/2020
Objection resolved — Addressed
03/09/2020
Filed — No Work
M00315010-I1
02/07/2020
Violation issued (ECB, closed)
Construction
10/11/2019
Violation issued (ECB, closed)
Construction
05/22/2019
Signed off — Alteration
M00088203-I1
05/22/2019
Signed off — Alteration
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00080896-I1
04/18/2019
Violation issued (ECB, closed)
Construction
04/18/2019
Violation issued (ECB, closed)
Construction
03/12/2019
Violation issued (ECB, closed)
Unknown
10/25/2018
Violation issued (ECB, closed)
Construction
10/25/2018
Violation issued (ECB, closed)
Construction
10/17/2018
Filed — Alteration
M00088203-I1
10/17/2018
Permit issued — Supported Scaffold
M00088203-I1-SF
10/15/2018
Special inspection requirement — Final
MD TOHFAZ UDDIN
10/05/2018
Permit issued — Supported Scaffold
M00080896-I1-SF
09/25/2018
Filed — Alteration
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00080896-I1
09/25/2018
Permit issued — Supported Scaffold
M00080896-I1-SF
09/19/2018
Special inspection requirement — Final
MD TOHFAZ UDDIN
07/30/2018
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offYORK SCAFFOLD EQUIPMENT CORP.10/17/2018
DOB NOWSupported ScaffoldSigned-offYORK SCAFFOLD EQUIPMENT CORP.10/05/2018
DOB NOWSupported ScaffoldSigned-offYORK SCAFFOLD EQUIPMENT CORP.09/25/2018
BISPLISSUEDJ.M. BOTTO INC09/22/2025
BISPLISSUEDJ.M. BOTTO INC08/05/2022
BISPLISSUEDJ.M. BOTTO INC02/11/2021
BISSDISSUEDSIRINA FIRE PROT CORP12/04/2020
BISOTISSUEDKELCO CONSTRUCTION INC10/15/2020
BISOTISSUEDKELCO CONSTRUCTION INC10/15/2020
BIS—ISSUEDBARR & BARR INC03/26/2020
BISBLISSUEDI.M.P. PLBG. & HTG. CORP03/05/2020
BISEQISSUEDBARR & BARR INC02/10/2020
BISOTISSUEDKELCO CONSTRUCTION INC10/30/2019
BISOTISSUEDKELCO CONSTRUCTION INC09/30/2019
BISOTISSUEDKELCO CONSTRUCTION INC09/30/2019
BISEQISSUEDGREG LOGISTICS LLC05/01/2019
BIS—ISSUEDBARR & BARR INC03/21/2019
BIS—ISSUEDBARR & BARR INC01/31/2019
BISPLISSUEDJ.M. BOTTO INC12/26/2018
BISSPISSUEDSIRINA FIRE PROT CORP12/11/2018
BISPLISSUEDJ.M. BOTTO INC10/23/2018
BISEQISSUEDBARR & BARR INC10/22/2018
BIS—ISSUEDBARR & BARR INC07/03/2018
BIS—ISSUEDBARR & BARR INC03/30/2018
BIS—ISSUEDBARR & BARR INC12/08/2017
BIS—RE-ISSUEDBARR & BARR INC11/17/2017
BISEQISSUEDBARR & BARR INC11/08/2017
6 projects · most recent 06/01/2023
General Wiring
FiledStatusContractorScope
06/01/2023CompleteNJS ELEC'L SERVICES CORP.General Wiring
02/07/2023CancelledNJS ELEC'L SERVICES CORP.General Wiring
08/29/2022CompleteSOLAR ELEC. SYSTEMS, INC.General Wiring
02/19/2019CompleteNTS ELECTRICAL, INC—
06/07/2018CompleteDOOLEY ELECTRIC CO., INC.General Wiring
05/09/2018CompleteSOLAR ELEC. SYSTEMS, INC.—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/30/2022Public Assembly Emergency LightingChristopher O'Malleyprogress
11/01/2021Public Assembly Emergency LightingFAWZY SALIBprogress
09/25/2020Public Assembly Emergency LightingFAWZY SALIBprogress
10/15/2018FinalMD TOHFAZ UDDINprogress
09/19/2018FinalMD TOHFAZ UDDINprogress
▾Documents — 309 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Place of Assembly3
08/15/2026M00315010-I1Request digital key ↗
08/15/2026M00315010-P2Request digital key ↗
08/15/2026M00315010-P1Request digital key ↗
▸DOB NOWPlans/Sketch2
09/06/2026M00080896-I1Request digital key ↗
09/06/2026M00088203-I1Request digital key ↗
▸Applications & Permits53
▸BISPLAN / WORK APPROVAL APPLICATION29
02/17/2026121203768Open ↗
08/08/2025121203768Open ↗
11/15/2024121205622Open ↗
Showing 3 of 29 on file for this type
▸BISWORK PERMIT APPLICATION22
09/22/2025121203768Open ↗
03/10/2020140850283Open ↗
02/10/2020121203768Open ↗
Showing 3 of 22 on file for this type
▸BISEQUIPMENT (EQ) PERMITS1
10/27/2021121203768Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/28/2019121203768Open ↗
▸Zoning, Tax Lot & Property Records11
▸BISZONING DIAGRAM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTAX LOT: FINAL LOT NUMBER ISSUED2
03/13/2020121203768Open ↗
Showing 1 of 2 on file for this type
▸BISZONING RESOLUTION DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROVIDE ZONING EXHIBITS.1
05/05/2021121203768Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications23
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
01/24/2020121203768Open ↗
10/22/2019140845334Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026M00080896-I1Open ↗
08/31/2026M00088203-I1Open ↗
08/28/2026M00315010-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/05/2026M00315010-I1Open ↗
08/13/2026M00315010-P2Open ↗
08/13/2026M00080896-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/20/2020140942354Open ↗
04/30/2019140845334Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/20/2020140942354Open ↗
04/30/2019140845334Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
05/29/2019140850283Open ↗
Showing 1 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/20/2020140942354Open ↗
04/30/2019140845334Open ↗
▸Trade Schedules & Equipment23
▸BISSCHEDULE B - PLUMBING7
02/17/2026121203768Open ↗
01/07/2021121203768Open ↗
01/02/2020121203768Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE PERMITS7
05/25/2021121203768Open ↗
05/25/2021121203768Open ↗
05/25/2021121203768Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
05/25/2021121203768Open ↗
05/25/2021121203768Open ↗
05/25/2021121203768Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
12/24/2020123387511Open ↗
07/02/2018121203768Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
01/27/2020140850283Open ↗
05/29/2019140850283Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
08/22/2018140747707Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
07/02/2018121203768Open ↗
▸Safety & Tenant Protection1
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance25
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY12
01/12/2021121203768Open ↗
12/07/2020140850283Open ↗
12/03/2020140850283Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
01/24/2020121203768Open ↗
01/24/2020121203768Open ↗
07/03/2018121203768Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
01/12/2021121203768Open ↗
12/07/2020140850283Open ↗
12/03/2020140850283Open ↗
Showing 3 of 4 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS3
07/07/2025121203768Open ↗
06/22/2023121205622Open ↗
10/27/2021121203768Open ↗
▸BISEXTERIOR LIGHTING POWER1
06/22/2023121205622Open ↗
▸Inspections & Test Reports43
▸BISTECHNICAL REPORT: RESPONSIBILITY26
04/09/2021121203768Open ↗
04/09/2021121203768Open ↗
01/12/2021121203768Open ↗
Showing 3 of 26 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX5
12/09/2019121205622Open ↗
09/30/2019121205622Open ↗
09/26/2019121205622Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
06/23/2023121205622Open ↗
11/20/2020121203768Open ↗
10/03/2019121205622Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF1
10/27/2021121203768Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
06/22/2023121205622Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
06/22/2023121205622Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
06/22/2023121205622Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
06/22/2023121205622Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
04/30/2019140845334Open ↗
▸Approvals, Objections & Sign-offs29
▸BISSCHEDULE A - OCCUPANCY / USE7
08/08/2025121203768Open ↗
11/04/2021121203768Open ↗
10/30/2019121203768Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
05/05/2021121203768Open ↗
08/20/2020140942354Open ↗
08/22/2018140747707Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
11/18/2024121205622Open ↗
09/30/2024140747707Open ↗
01/20/2021123387511Open ↗
Showing 3 of 5 on file for this type
▸BISDESIGN COMM. SIGNOFF: CITY-OWNED PROPERTY (EXTERIOR WORK)2
06/22/2023121205622Open ↗
04/08/2021121203768Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)2
08/20/2020140942354Open ↗
08/09/2019121205622Open ↗
▸BISSUPERSEDING LETTER2
02/06/2019121203768Open ↗
Showing 1 of 2 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
12/11/2019121203768Open ↗
10/30/2019121203768Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PR1
04/08/2021121203768Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M00080896-I1Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT6
08/20/2020140942354Open ↗
10/22/2019140845334Open ↗
09/03/2019121205622Open ↗
Showing 3 of 6 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
03/22/2019121203768Open ↗
07/03/2018121203768Open ↗
Showing 2 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
09/26/2024140747707Open ↗
06/22/2023121205622Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
03/22/2019121203768Open ↗
▸Filing & Intake Forms37
▸BISADDITIONAL INFORMATION19
02/16/2022121203768Open ↗
05/26/2021121203768Open ↗
04/19/2021121203768Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING COVER SHEET9
06/29/2019121205622Open ↗
06/29/2019121205622Open ↗
06/29/2019121205622Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM5
09/22/2025121203768Open ↗
10/28/2019121203768Open ↗
10/22/2019140845334Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
08/20/2020140942354Open ↗
05/29/2019140850283Open ↗
04/30/2019140845334Open ↗
Showing 3 of 4 on file for this type
▸Other Documents33
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
01/27/2020140850283Open ↗
Showing 1 of 6 on file for this type
▸DOB NOWAlternate Plan 73
08/15/2026M00315010-I1Open ↗
08/15/2026M00315010-P2Open ↗
08/15/2026M00315010-P1Open ↗
▸DOB NOWAlternate Plan 83
08/15/2026M00315010-I1Open ↗
08/15/2026M00315010-P2Open ↗
08/15/2026M00315010-P1Open ↗
▸DOB NOWAlternate Plan 53
08/15/2026M00315010-I1Open ↗
08/15/2026M00315010-P2Open ↗
08/15/2026M00315010-P1Open ↗
▸DOB NOWAlternate Plan 43
08/15/2026M00315010-I1Open ↗
08/15/2026M00315010-P2Open ↗
08/15/2026M00315010-P1Open ↗
▸DOB NOWAlternate Plan 33
08/15/2026M00315010-I1Open ↗
08/15/2026M00315010-P2Open ↗
08/15/2026M00315010-P1Open ↗
▸DOB NOWAlternate Plan 23
08/15/2026M00315010-I1Open ↗
08/15/2026M00315010-P2Open ↗
08/15/2026M00315010-P1Open ↗
▸DOB NOWAlternate Plan 63
08/15/2026M00315010-I1Open ↗
08/15/2026M00315010-P2Open ↗
08/15/2026M00315010-P1Open ↗
▸BISPLOT DIAGRAM2
07/02/2018121203768Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWAlternate Plan 112
08/15/2026M00315010-I1Open ↗
08/15/2026M00315010-P2Open ↗
▸BISCPC CERTIFICATION PER ZR 133-501
03/13/2020121203768Open ↗
▸BISTCO - Supporting Documents1