← Back
Two family converted from one family
20-07 120 STREET
QUEENS · College Point · BIN 4099166
💬 Discuss this project
1910Year Built
2.5Stories
B3Building Class
R4AZoning
2,583 sfGross Floor Area
2Units
0 Open Violations
Two family converted from one family · 3,325 sf lot · 0.78 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 21p · 1 filing · 20 docs
Floor 1
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/17/2019$870K—— → —$337/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALBERTO ROMAN210/31/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INDESIGN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AR-TECH ENGINEERING, P.C.6659210/31/2019
Building Lifecycle
All (16)Filed (2)Permit Issued (1)Violation (1)Special Inspection (12)
10/31/2019
Filed — Alteration
CAP & REMOVE EXISTING OIL TANK & OIL BOILER. PROPOSE OIL TO GAS BOILER CONVERSION. ERECT 3-PC BATHROOM AT BASEMENT. INTERIOR RENOVATION OF EXISTING 2-FAMILY HOUSE WITH PLUMBING WORK. NO CHANGE TO EXISTING USE , EGRESS OR OCCUPANCY.
Q00210217-P1
10/31/2019
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALBERTO ROMAN
10/31/2019
Special inspection requirement — Energy Code Compliance Inspections
ALBERTO ROMAN
10/31/2019
Special inspection requirement — Fire-Resistance Rated Construction
ALBERTO ROMAN
10/31/2019
Special inspection requirement — HVAC and service water heating system controls
ALBERTO ROMAN
10/31/2019
Special inspection requirement — HVAC and service water heating equipment
ALBERTO ROMAN
10/31/2019
Special inspection requirement — HVAC insulation and sealing
ALBERTO ROMAN
10/30/2019
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALBERTO ROMAN
10/30/2019
Special inspection requirement — Energy Code Compliance Inspections
ALBERTO ROMAN
10/30/2019
Special inspection requirement — Fire-Resistance Rated Construction
ALBERTO ROMAN
10/30/2019
Special inspection requirement — HVAC and service water heating equipment
ALBERTO ROMAN
10/30/2019
Special inspection requirement — HVAC and service water heating system controls
ALBERTO ROMAN
10/30/2019
Special inspection requirement — HVAC insulation and sealing
ALBERTO ROMAN
09/24/2019
Violation issued (ECB, closed)
Construction
08/27/2019
Permit issued — Plumbing
Q00210217-I1-PL
08/16/2019
Filed — Alteration
CAP & REMOVE EXISTING OIL TANK & OIL BOILER. PROPOSE OIL TO GAS BOILER CONVERSION. ERECT 3-PC BATHROOM AT BASEMENT. INTERIOR RENOVATION OF EXISTING 2-FAMILY HOUSE WITH PLUMBING WORK. NO CHANGE TO EXISTING USE , EGRESS OR OCCUPANCY.
Q00210217-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC08/27/2019
BISOTISSUEDQNG TRADING INC08/15/2019
1 project · most recent 10/31/2019
Gas Water/Sanitary
FiledStatusContractorScope
10/31/2019Signed-offCATMAN PLUMBING INCGas, Water/Sanitary
1 project · most recent 01/15/2020
General Wiring
FiledStatusContractorScope
01/15/2020CompleteKJK ELECTRIC INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
10/31/2019Fire-Resistant Penetrations and JointsALBERTO ROMANspecial
10/31/2019Energy Code Compliance InspectionsALBERTO ROMANprogress
10/31/2019Fire-Resistance Rated ConstructionALBERTO ROMANprogress
10/31/2019HVAC and service water heating system controls ALBERTO ROMANenergy_progress
10/31/2019HVAC and service water heating equipment ALBERTO ROMANenergy_progress
10/31/2019HVAC insulation and sealing ALBERTO ROMANenergy_progress
10/30/2019Fire-Resistant Penetrations and JointsALBERTO ROMANspecial
10/30/2019Energy Code Compliance InspectionsALBERTO ROMANprogress
10/30/2019Fire-Resistance Rated ConstructionALBERTO ROMANprogress
10/30/2019HVAC and service water heating equipment ALBERTO ROMANenergy_progress
10/30/2019HVAC and service water heating system controls ALBERTO ROMANenergy_progress
10/30/2019HVAC insulation and sealing ALBERTO ROMANenergy_progress
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Plumbing2
08/28/2026Q00210217-I1Request digital key ↗
08/15/2026Q00210217-P1Request digital key ↗
▸Applications & Permits3
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
03/11/2020421745400Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
08/19/2019421745400Open ↗
▸BISWORK PERMIT APPLICATION1
08/19/2019421745400Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026Q00210217-I1Open ↗
08/13/2026Q00210217-P1Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
08/19/2019421745400Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature10
08/27/2026Q00210217-P1Open ↗
08/27/2026Q00210217-P1Open ↗
08/27/2026Q00210217-P1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
03/11/2020421745400Open ↗
08/19/2019421745400Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/28/2026Q00210217-P1Open ↗
08/28/2026Q00210217-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026Q00210217-P1Open ↗
08/22/2026Q00210217-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/19/2019421745400Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/19/2019421745400Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/28/2026Q00210217-I1Open ↗
08/28/2026Q00210217-P1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/19/2019421745400Open ↗
▸Energy Compliance2
▸BISAS-BUILT ENERGY ANALYSIS1
03/11/2020421745400Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/19/2019421745400Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/11/2020421745400Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/11/2020421745400Open ↗
08/19/2019421745400Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
10/10/2019421745400Open ↗
09/13/2019421745400Open ↗
▸BISEFILING COVER SHEET1
08/19/2019421745400Open ↗