ECB01/28/2026UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. FAILURE TO OBTAIN PERMITS OR FILE CERTIFICATE OF CORRECTIONS FOR SUMMONS 39078610K, COMPLY WITH COMMISSIONER'S ORDER$12K due
ECB01/28/2026FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS 39078611M, FILE A CERTIFICATE OF CORRECTION$6K due
ECB01/28/2026FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER IN DOB VIOLATION VI023-00260/012823CER01J DATED 01-28-2023. RESPONDED WAS REQUIRE TO SUBMIT AN ENGINEER'S REPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS. AS$25K due
ECB01/04/2024FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER IN DOB VIOLATION VIO23-00260/012823CE01J, DATED 1/28/2023. RESPONDENT WAS REQUIRED TO SUBMIT AN ENGINEER'S REPORT CONCERNING STRUCTURALLY DEFICIENT CONDIITONS. AS$2K due
DOB10/04/2023FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB10/04/2023FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB01/28/2023NOTED BEARING WALLS ADDED AND REMOVED AT 1ST FLOOR. ALSO STAIR CASE SLOPING, STEEL BEAMS ADDED, AND UNSUPPORTED JOISTS IN 1ST FLOOR CEILING.
ECB01/28/2023AFTER BEING CALLED TO SITE BY FDNY I NOTED ON 1ST FL SEVERAL LOAD BEARING WALLS REMOVED, BOILER WORK, GAS WORK, AND FIRE RATED PARTITIONS REMOVED EFFECTING STRUCTURE. ALSO KITCHEN AND BATHROOM ADDED 2ND FLOOR.$30K due
DOB01/17/2020VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB06/08/2011VPW-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-ACTIVE
HPD03/17/2005SECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES 2 STY. APT 2C KITCHEN AND BATHROOM.
HPD03/17/2005SECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES BATHROOM AND KITCHEN 2ND STORY APARTMENT # 2.
HPD03/17/2005SECTION 27-2038 ADMIN CODE: PROVIDE ADEQUATE LIGHTING FOR 1ST AND 2ND STY. PUBLIC HALLS - ( ER - 1 )
HPD03/17/2005SECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES BATHROOM AND KITCHEN - 2ND STY. APT.
HPD03/17/2005SECTION 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES 2 STY. APT 2C KITCHEN AND BATHROOM.
HPD03/17/2005SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING 2 STY. 2C APT. FRONT ROOM - ER - 1.
HPD03/17/2005SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING 2 STY. APT 2 C - CENTER ROOM.
HPD05/19/2002SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE DISCONNETED COPPER HEAT PIPES FROM BOILER TO 1 STY APT E\R.
HPD05/19/2002SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS AND CEILINGS ALL ROOMS 2ND STY. APT. 2
HPD05/19/2002SECTION 27-2038 ADMIN CODE: PROVIDE ADEQUATE LIGHTING FOR 1ST STY. SHARED HALL FRONT 60 WATTS MIN. REQUIRED
HPD05/19/2002SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF EXPOSED ELECTRICAL WIRES AND EXTENSION CORDS 2ND STY. SHARED HALL
HPD05/19/2002SECTION 27-2032, 2034 ADNIM. CODE: DISCONTINUE USE OF ILLEGAL SPACE AND/OR HOT WATER HEATER AND PROVIDE FILED FOR & APPROVED HEATER WHICH OBTAINS COMBUSTION AIR DIRECTLY FROM OUTSIDE THE BUILDING OR APPROVED CENTRAL SYSTEM HOT WATER HEATER BATHROOM 2ND STY. APT. 2
HPD05/19/2002SECTION 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER BATHROOM AND PRIVATE HALL 2ND STY. APT. 2 D32411H
HPD05/02/2002SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CELOTEX TYPE CEILING 1 STY APT FRONT ROOM.
HPD05/02/2002SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF EXPOSED ELECTRIC WIRES AT 1 STY PUBLIC HALL.
HPD05/02/2002SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE METAL CEILING OF 1 STY PUBLIC HALL OVER BOXES.
HPD05/02/2002SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD PANELED WALLS OF 1 STY APT BATHROOM.
HPD05/02/2002SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRIC WALL LIGHT FIXTURE 1 STY BOILER ROOM.
ECB01/28/2023RESPONDING TO CALL BY FDNY NOTED HOLES IN FLOOR, EXPOSED DUCT WORK, EXPOSED BOILER, EXPOSED GAS LINE (1ST FLOOR), EXPOSED ELECTRICAL THROUGHOUT, HOLES IN HALL CIELING, AND SLOPING STAIRCASE IN HALLWAY 2ND FLOORNothing owed — awaiting certificate of correction
ECB06/06/2017WORK WITHOUT A PERMIT NOTED:CONSTRUCTED 2ND FLR EXTENSION WITH FULL HEIGHT PARTITIONS NEW PLYWOOD SUB FLR ELECTRICAL AND PLUMBING WORK:NO FILING IN DOB RECORDS.STOP ALL WORK FULL SWO ISSUED.REM:OBTAIN PERMIT ORNothing owed — awaiting certificate of correction