← Back
BuildNYC
Over six families without stores
20 BAY 34 STREET
BROOKLYN · BIN 3185423
💬 Discuss this project
1926Year Built
4Stories
C1Building Class
R5Zoning
14,340 sfGross Floor Area
19Units
Rent Stabilized43 Active Violations 1 likely answered 1 old, status unconfirmed ▸FDNY Report ↗
Over six families without stores · Owner of record: 20 Bay · 5,800 sf lot · 2.47 FAR built · Flood zone X500
Locations of Work
MechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarBoiler replacement6p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Intravaia203/21/2026
20 Bay103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bazini Engineering202/18/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Zone Plumbing & HeatingPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bazini Engineering1808202/18/2026
Building Lifecycle
07/31/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/28/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/11/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/01/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
134 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedZone Plumbing & Heating03/10/2026
DOB NOWPlumbingPermit IssuedZone Plumbing & Heating02/27/2026
BISBLISSUEDGeorge Bassolino04/23/1997
BISPLISSUEDGeorge Bassolino04/23/1997
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/31/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/28/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
02/18/2026HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
02/18/2026HVAC-R and service water piping design and insulationJoseph Bazinienergy_progress
02/18/2026HVAC-R and service water heating system controlsJoseph Bazinienergy_progress
01/28/2026Tenant Protection Plan ComplianceJoseph Bazinispecial
01/28/2026Tenant Protection Plan ComplianceJoseph Bazinispecial
10 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account