← Back
BuildNYC
Three families
20 CORDELIA AVENUE
STATEN ISLAND · BIN 5149215
💬 Discuss this project
1992Year Built
2Stories
C0Building Class
R3XZoning
8,800 sfGross Floor Area
3Units
0 Active ViolationsFDNY Report ↗
Three families · 19,125 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofProposed Photovoltaic Solar Array Installation2p · 1 filing · 6 docs
Floor 2Existign 2 Family Residence8p · 1 filing · 20 docs
Floor 1Existign 2 Family Residence7p · 1 filing · 20 docs
CellarExistign 2 Family Residence6p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Green River Environmental Engineering105/27/2026
Ryan Design Architecture203/31/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Aprile Bonamo Filing Rep103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Marsal MaintenanceGeneral Contractor104/09/2026
NYSSspecialty_contractor106/28/2026
B B Plumbing & HeatingPlumbing112/27/2005
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Green River Environmental7841105/27/2026
Ryan Design Architecture7159203/31/2026
Building Lifecycle
08/31/2026
Signed off — Alteration CO
S01269075-I1
07/01/2026
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
S01408162-I1
06/01/2026
Permit issued — Solar
S01408162-I1-SL
05/27/2026
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
S01408162-I1
05/27/2026
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
18 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS06/01/2026
DOB NOWGeneral ConstructionPermit IssuedMarsal Maintenance02/18/2026
BISPLISSUEDB B Plumbing & Heating12/27/2005
2 projects · most recent 05/27/2026
General Wiring
FiledStatusContractorScope
05/27/2026CompleteNY Solar Electrical—
02/04/2026CompleteA & R Electrical ContractingGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/10/2026Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
05/27/2026Air barrier - visual inspectionROBERT MASONEenergy_progress
05/27/2026Fire-Resistant Penetrations and JointsROBERT MASONEspecial
05/27/2026Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
05/27/2026Energy Code Compliance InspectionsROBERT MASONEprogress
05/27/2026FinalROBERT MASONEprogress
04/22/2026Concrete - Cast-In-PlaceDaniel Ryanspecial
04/22/2026Subgrade InspectionsDaniel Ryanspecial
03/31/2026Concrete - Cast-In-PlaceDaniel Ryanspecial
03/31/2026Subgrade InspectionsDaniel Ryanspecial
56 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account