Residential, converted (111 apartments per DOB filing)
The Surrey Condominium
20 EAST 76TH STREET · BIN 1041706
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
111Units
LL97 CoveredRent Stabilized2 Active Violations 1 old, status unconfirmed ▸FISP: UNSAFE
Residential, converted (111 apartments per DOB filing) · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsSurrey Propco LLCUnder Construction8 filings
RoofGramercy Park House, LLCUnder Construction4p · 6 filings
Floor 15Unit 15AUnder Construction1 filing
Floor 14Alterations to the residenceUnder Construction1 filing
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Surrey Propco, LLC2p · 2 filings
Floor 1Surrey Propco, LLC4p · 5 filings
CellarSurrey Propco, LLC1 filing
Site & exteriorGramercy Park House, LLCUnder Construction8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Gramercy Park House21910/08/2026
20 East 76 Co6203/21/2026
677-679 Madison Propco1307/08/2026
20 E 76 St Co1303/21/2026
Lyden Hotel Co1203/21/2026
20 East 76th Street603/21/2026
Surrey Propco303/21/2026
20 East 76th St LLC Dba Surrey203/21/2026
Lyden Hotel Co D B Asurrey Hotel203/21/2026
Dinex Group103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/03/2020$150.2M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MJM Associates ConstructionGeneral Contractor3004/09/2026
Mmi Plumbing & HeatingPlumbing1107/08/2026
Skyline Scaffolding GroupScaffold904/09/2026
M&D Fire SprinklerFire Protection707/08/2026
Arsenal ScaffoldScaffold704/09/2026
Vik XS ServicesScaffold704/09/2026
Urban IntelligenceScaffold708/26/2026
MJM Construction AssociatesGeneral Contractor607/08/2026
F.S. SiteFire Protection507/08/2026
TristruxGeneral Contractor304/09/2026
Elm Suspension Systems*Scaffold303/21/2026
MJM Associates ConstructionScaffold304/09/2026
F.S. SitePlumbing207/08/2026
Alba ServicesGeneral Contractor204/09/2026
S. DonadicGeneral Contractor207/08/2026
Exterior Wall & BuildingScaffold204/09/2026
Universal Fire SprinklerFire Protection107/08/2026
Gilston Electrical ContngElectrical103/22/2026
5 J'S Electl ContsElectrical103/21/2026
Power Direct ElectricElectrical103/22/2026
Forte Express P & HPlumbing107/08/2026
Hudson Plumbing & MCHPlumbing106/28/2026
K.M.D. Mechanical 1443Fire Protection107/08/2026
L.L.G. Plumbing & HeatingPlumbing107/08/2026
5 J'S Electl ContsElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Surface Design Profession3968810/07/2026
Domani Inspection Service8433110/07/2026
Dominick R. Pilla1300403/13/2026
Tohfaz Uddin P.E2001504/22/2025
Skyline Rigging7880108/02/2024
Scherer Design Group7921206/21/2024
Special Testing & Consulting1688203/15/2023
Building Lifecycle
All (300)Filed (49)Permit Issued (63)Signed Off (21)Facade (FISP) (12)Violation (26)Inspection (21)Objection (78)Special Inspection (30)
10/14/2026
Objection raised — Other
10/07/2026
Filed — Alteration CO
Structural work in conjunction with alt-co. Structural faming plans of new steel framed floor openings, infill of some existing slab openings, framing of new stairs, dunnage for new mechanical equipment.
M08010233-A2
10/06/2026
Special inspection requirement — Post-installed Anchors
MOLLY FORR
10/06/2026
Special inspection requirement — Sprayed fire-resistant materials
JOHN MCMONAGLE
10/06/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
JOHN MCMONAGLE
10/06/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
MOLLY FORR
10/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
10/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
09/03/2026
Filed — Alteration CO
Structural work in conjunction with alt-co. Structural faming plans of new steel framed floor openings, infill of some existing slab openings, framing of new stairs, dunnage for new mechanical equipment.
M08010233-A1
08/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/13/2026
Signed off — Alteration
NSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS AND MATERIAL HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
M01088947-I1
08/05/2026
Permit issued — Sidewalk Shed
M01323906-I1-SH
07/21/2026
Filed — Alteration
Mechanical work for existing hotel as shown on plans including work to kitchen hoods at CEL and Ground Floors.
M08022860-B5
07/10/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/10/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/09/2026
Special inspection requirement — Standpipe Systems
JOHN MCMONAGLE
07/09/2026
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
07/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
07/09/2026
Special inspection requirement — Sprinkler Systems
JOHN MCMONAGLE
07/07/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/06/2026
Filed — Alteration
Mechanical work for existing hotel as shown on plans including work to kitchen hoods at CEL and Ground Floors.
M08022860-B4
07/01/2026
Special inspection requirement — Standpipe Systems
JOHN MCMONAGLE
07/01/2026
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
07/01/2026
Special inspection requirement — Sprinkler Systems
JOHN MCMONAGLE
07/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
06/18/2026
Permit issued — General Construction
M08010233-I1-GC
06/18/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
JOHN MCMONAGLE
06/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
06/18/2026
Special inspection requirement — Post-installed Anchors
MOLLY FORR
06/18/2026
Special inspection requirement — Sprayed fire-resistant materials
JOHN MCMONAGLE
06/18/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
MOLLY FORR
06/18/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
06/05/2026
Permit issued — Sprinklers
M01336748-S3-EW-SP
06/03/2026
Permit issued — Mechanical Systems
M01336748-S1-MS
05/29/2026
Permit issued — Plumbing
M01336748-S2-PL
05/15/2026
Permit issued — Sidewalk Shed
M01323906-I1-SH
05/14/2026
Permit issued — Suspended Scaffold
M01354495-I1-SC
05/13/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/13/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
MOLLY FORR
05/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
05/13/2026
Special inspection requirement — Sprayed fire-resistant materials
JOHN MCMONAGLE
05/13/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
JOHN MCMONAGLE
05/13/2026
Special inspection requirement — Post-installed Anchors
MOLLY FORR
05/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
05/05/2026
Filed — Alteration CO
Structural work in conjunction with alt-co. Structural faming plans of new steel framed floor openings, infill of some existing slab openings, framing of new stairs, dunnage for new mechanical equipment.
M08010233-P7
04/30/2026
Cycle 9 facade report submitted
04/30/2026
Cycle 9 facade report signed — UNSAFE
04/27/2026
Objection resolved — Addressed
04/23/2026
Filed — Alteration
Mechanical work for existing hotel as shown on plans including work to kitchen hoods at CEL and Ground Floors.
M08022860-B3
04/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
04/23/2026
Special inspection requirement — Post-installed Anchors
MOLLY FORR
04/23/2026
Special inspection requirement — Sprayed fire-resistant materials
JOHN MCMONAGLE
04/23/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
MOLLY FORR
04/16/2026
Cycle 9 facade inspection completed
04/13/2026
Objection resolved — Resolved
04/13/2026
Objection resolved — Resolved
04/10/2026
Objection raised — Admin
04/10/2026
Objection raised — Admin
04/10/2026
Objection resolved — Resolved
04/10/2026
Objection resolved — Resolved
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedUrban Intelligence08/05/2026
DOB NOWGeneral ConstructionPermit IssuedMJM Construction Associates06/18/2026
DOB NOWSprinklersPermit IssuedUniversal Fire Sprinkler06/05/2026
DOB NOWMechanical SystemsPermit IssuedS. Donadic06/03/2026
DOB NOWPlumbingPermit IssuedHudson Plumbing & MCH05/29/2026
DOB NOWSidewalk ShedPermit IssuedUrban Intelligence05/15/2026
DOB NOWSuspended ScaffoldPermit IssuedAlps Contractor05/14/2026
DOB NOWGeneral ConstructionPermit IssuedSapol Construction03/26/2026
DOB NOWSuspended ScaffoldPermit IssuedArchstone Restoration02/03/2026
DOB NOWSidewalk ShedPermit IssuedExterior Wall & Building12/01/2025
DOB NOWGeneral ConstructionPermit IssuedMJM Associates Construction11/21/2025
DOB NOWGeneral ConstructionSigned-offMJM Associates Construction11/20/2025
DOB NOWMechanical SystemsSigned-offMJM Associates Construction11/20/2025
DOB NOWGeneral ConstructionPermit IssuedMJM Construction Associates11/13/2025
DOB NOWMechanical SystemsSigned-offMJM Construction Associates11/13/2025
DOB NOWGeneral ConstructionSigned-offMJM Construction Associates11/13/2025
DOB NOWGeneral ConstructionPermit IssuedMJM Associates Construction11/05/2025
DOB NOWSupported ScaffoldSigned-offArsenal Scaffold11/05/2025
DOB NOWGeneral ConstructionSigned-offMJM Associates Construction08/25/2025
DOB NOWSprinklersSigned-offM&D Fire Sprinkler07/23/2025
DOB NOWStandpipePermit IssuedM&D Fire Sprinkler07/23/2025
DOB NOWPlumbingSigned-offMichael Itskovich07/22/2025
DOB NOWGeneral ConstructionPermit IssuedMJM Associates Construction06/05/2025
DOB NOWSprinklersSigned-offM&D Fire Sprinkler05/05/2025
DOB NOWStandpipePermit IssuedM&D Fire Sprinkler05/05/2025
DOB NOWSupported ScaffoldSigned-offArsenal Scaffold04/30/2025
DOB NOWProtection and Mechanical MethodsSigned-offArsenal Scaffold04/30/2025
DOB NOWGeneral ConstructionPermit IssuedMJM Associates Construction04/23/2025
DOB NOWPlumbingSigned-offMichael Itskovich04/03/2025
DOB NOWSprinklersSigned-offAlan J. Brutosky Plumbing Con03/28/2025
DOB NOWMechanical SystemsSigned-offMJM Associates Construction02/06/2025
DOB NOWSidewalk ShedSigned-offExterior Wall & Building12/27/2024
DOB NOWGeneral ConstructionSigned-offMJM Associates Construction09/20/2024
DOB NOWSidewalk ShedSigned-offUrban Intelligence09/10/2024
DOB NOWSupported ScaffoldSigned-offElm Suspension Systems*08/12/2024
DOB NOWStandpipePermit IssuedAlan J. Brutosky Plumbing Con08/09/2024
DOB NOWStandpipePermit IssuedK.M.D. Mechanical 144308/08/2024
DOB NOWSuspended ScaffoldPermit IssuedDoria08/02/2024
DOB NOWAntennaPermit IssuedTristrux07/30/2024
DOB NOWBoiler EquipmentSigned-offMichael Itskovich07/26/2024
+ 60 more permits on file
1 project · most recent 07/21/2026
Heating and Air Conditioning Systems Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
07/21/2026Signed-offMJM Associates ConstructionHeating and Air Conditioning Systems, Refrigeration Systems
Heat / Cool
Daikin FXZQ18TAVJU 18,086 BTU · Vrf Indoor ×26
BSF6Q54TAVJ 54,000 BTU · Vrf Outdoor ×8
FXSQ18TAVJU 18,017 BTU · Vrf Indoor ×8
FXSQ24TAVJU 23,989 BTU · Vrf Indoor ×8
FXTQ36TAVJU 36,002 BTU · Vrf Indoor ×8
BS4Q54TAVJ 54,000 BTU · Vrf Outdoor ×4
BSF8Q54TAVJ 54,000 BTU · Vrf Indoor ×44
FXFQ48TVJU 48,012 BTU · Vrf Indoor ×4
FXMQ96MVJU 94,885 BTU · Vrf Indoor ×4
FXSQ36TAVJU 36,002 BTU · Vrf Indoor ×4
FXSQ48TAVJU 48,012 BTU · Vrf Indoor ×8
FXTQ12TAVJU 12,001 BTU · Vrf Indoor ×4
FXSQ 1 tons ×169
REYQ96AATJA 98,246 BTU · Vrf Outdoor ×18
REYQ144AATJA 141,775 BTU · Vrf Outdoor ×8
FXZQ05TAVJU 5,802 BTU · Vrf Indoor ×6
FXZQ12TAVJU 11,944 BTU · Vrf Indoor ×6
BSF10Q54TAVJ 54,000 BTU ×4
FXFQ24TVJU & FXAQ24PVJU 23,989 BTU · Vrf Indoor ×4
FXZQ09TAVJU 9,555 BTU · Vrf Indoor ×4
REYQ144AATJA&REYQ120AATJA 246,567 BTU · Vrf Outdoor ×4
REYQ144AATJA&REYQ144AATJA 286,839 BTU · Vrf Outdoor ×4
Aaon RNA016C 7,475 CFM · Rooftop Unit ×2
Refrigeration
Daikin REYQ72AATJA 6 tons · Vrf Outdoor ×16
RXTQ/REYQ 12 tons · Refrigeration Unit ×14
REYQ120AATJA 10 tons · Vrf Outdoor ×4
REYQ96AATJA 8 tons · Vrf Outdoor ×1
2 projects · most recent 07/21/2026
FiledStatusContractorScope
07/21/2026Permit IssuedM&D Fire Sprinkler5,402 heads, 55 outlets
09/22/2022———
1 project · most recent 07/21/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/21/2026Signed-offMmi Plumbing & HeatingGas, Storm, Water/Sanitary
12 projects · most recent 06/02/2026
General Wiring
FiledStatusContractorScope
06/02/2026CompleteModern Voltage NYC—
05/06/2026Permit IssuedWarren Ostroff Electric—
12/11/2025Permit Issued5 J'S Electl Conts—
08/19/2025CompleteGilston Electrical ContngGeneral Wiring
09/10/2024Complete5 J'S Electl Conts—
01/29/2024Permit IssuedAmpacity ElectricalGeneral Wiring
11/13/2023Permit IssuedPower Direct Electric—
05/11/2023Permit IssuedPower Direct Electric—
04/11/2023Permit IssuedGilston Electrical Contng—
03/09/2023Permit IssuedAmpacity Electrical—
05/03/2022CompleteTop Shelf Electric—
12/13/2021Permit IssuedAlba Electric—
1 project · most recent 10/07/2026
Steel Concrete Masonry
FiledStatusContractorScope
10/07/2026Permit IssuedMJM Construction AssociatesSteel, Concrete, Masonry
1 project · most recent 03/09/2026
Sidewalk Shed
FiledStatusContractorScope
03/09/2026Permit IssuedUrban IntelligenceSidewalk Shed
1 project · most recent 02/02/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
02/02/2026Permit IssuedAlps ContractorSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 27
DateTypeResultReport
08/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/07/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/13/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/02/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/10/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/28/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/27/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/27/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/27/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
08/20/2024Pass-Final SP - More than 10 Requested FloorsPassView ↗
08/14/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/14/2024Certified StandPipe-SD-Piping-UndergroundCertifiedView ↗
08/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/06/2024Pass-Final Boiler Equipment InspectionPassView ↗
07/31/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
07/31/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
06/20/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/20/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
06/20/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
05/11/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/03/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/22/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/12/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/12/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 27.
▾Special Inspection Requirements (DOB NOW) — 119
DateRequirementInspectorRole
10/06/2026Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
10/06/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
10/06/2026Mastic and Intumescent Fire-resistant CoatingsJOHN MCMONAGLEspecial
10/06/2026Post-installed AnchorsMOLLY FORRspecial
10/06/2026Sprayed fire-resistant materialsJOHN MCMONAGLEspecial
10/06/2026Wall Panels, Curtain Walls, and VeneersMOLLY FORRspecial
07/09/2026Standpipe SystemsJOHN MCMONAGLEspecial
07/09/2026Post-installed AnchorsJOHN MCMONAGLEspecial
07/09/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
07/09/2026Sprinkler SystemsJOHN MCMONAGLEspecial
07/01/2026Standpipe SystemsJOHN MCMONAGLEspecial
07/01/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
07/01/2026Post-installed AnchorsJOHN MCMONAGLEspecial
07/01/2026Sprinkler SystemsJOHN MCMONAGLEspecial
06/18/2026Wall Panels, Curtain Walls, and VeneersMOLLY FORRspecial
06/18/2026Sprayed fire-resistant materialsJOHN MCMONAGLEspecial
06/18/2026Post-installed AnchorsMOLLY FORRspecial
06/18/2026Mastic and Intumescent Fire-resistant CoatingsJOHN MCMONAGLEspecial
06/18/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
06/18/2026Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
05/13/2026Wall Panels, Curtain Walls, and VeneersMOLLY FORRspecial
05/13/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
05/13/2026Sprayed fire-resistant materialsJOHN MCMONAGLEspecial
05/13/2026Mastic and Intumescent Fire-resistant CoatingsJOHN MCMONAGLEspecial
05/13/2026Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
Latest 25 of 119.
▾Documents — 989 on file (BIS + DOB NOW)
▸Plans & Drawings89
▸DOB NOWPlans/Sketch83
09/02/2026M00763692-I1Request digital key ↗
09/01/2026M00711783-I1Request digital key ↗
09/01/2026M00625869-S3Request digital key ↗
Showing 3 of 83 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly6
08/28/2026M00954661-I1Request digital key ↗
08/27/2026M00954425-I1Request digital key ↗
08/27/2026M00954657-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits183
▸BISPLAN / WORK APPROVAL APPLICATION80
02/25/2026141024362Open ↗
02/13/2026141024362Open ↗
10/30/2024141024362Open ↗
Showing 3 of 80 on file for this type
▸BISWORK PERMIT APPLICATION51
01/25/2016122350008Open ↗
07/10/2015122350008Open ↗
02/23/2015122262504Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWLPC Approval/Permit47
08/31/2026M00700974-I1Open ↗
08/17/2026M08022860-B3Open ↗
Showing 2 of 47 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
08/19/2024141024362Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
12/03/2013121071972Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
01/24/2025121254114Open ↗
▸Seals & Professional Certifications267
▸DOB NOWDPL-1: Design Professional Seal & Signature88
09/02/2026M00763686-I1Open ↗
09/02/2026M00763692-I1Open ↗
09/01/2026M00711783-I1Open ↗
Showing 3 of 88 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION70
07/10/2015122350008Open ↗
06/23/2015122262504Open ↗
04/02/2015122350008Open ↗
Showing 3 of 70 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature55
10/09/2026M08010233-A2Open ↗
10/09/2026M08010233-A2Open ↗
10/09/2026M08010233-A2Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWProgress Inspector Seal & Signature26
10/09/2026M08010233-A2Open ↗
10/08/2026M00625869-P1Open ↗
09/28/2026M00954657-P1Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
02/26/2015122262504Open ↗
05/25/2012121089810Open ↗
05/25/2012121089507Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
05/25/2012121089810Open ↗
05/25/2012121089507Open ↗
05/10/2012121071972Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/26/2015122262504Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/06/2023141024362Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/06/2023141024362Open ↗
▸Trade Schedules & Equipment99
▸BISSELF-CERT PLUMBING NOTICE28
08/02/2010110330277Open ↗
07/23/2010110330277Open ↗
07/15/2010110330277Open ↗
Showing 3 of 28 on file for this type
▸BISSCHEDULE B - PLUMBING28
07/13/2010110330277Open ↗
07/06/2010110330277Open ↗
07/06/2010110330277Open ↗
Showing 3 of 28 on file for this type
▸BISEQUIPMENT USE PERMITS17
12/18/2012120814805Open ↗
02/16/2012120814805Open ↗
11/29/2011120491155Open ↗
Showing 3 of 17 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT11
11/02/2011120491155Open ↗
12/18/2012120814805Open ↗
02/16/2012120814805Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
04/29/2015122262504Open ↗
02/26/2015122262504Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWFDNY: Letter of No Objection5
08/17/2026M08022860-B4Open ↗
Showing 1 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISJAMAICA: DEP SEWER CONNECTION APPROVAL1
06/24/2015122350008Open ↗
▸Safety & Tenant Protection17
▸BISSRO MD ANTI-HARASSMENT CHECKLIST7
02/12/2025121254114Open ↗
09/06/2023141024362Open ↗
06/25/2015122350008Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWStreet Tree Checklist7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISHPD-1 - Anti-Harassment Area Checklist1
10/04/2011120814805Open ↗
▸BISBPP: STREET TREES SITE PLAN1
09/06/2023141024362Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos95
▸DOB NOWDEP ACP-5: Asbestos Assessment Report55
09/02/2026M00763692-I1Open ↗
09/01/2026M00711783-I1Open ↗
09/01/2026M00625869-P2Open ↗
Showing 3 of 55 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'32
09/16/2011120814805Open ↗
10/21/2010120491155Open ↗
Showing 2 of 32 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
05/10/2012121071972Open ↗
Showing 1 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
04/02/2015122350008Open ↗
02/26/2015122262504Open ↗
05/25/2012121089810Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
06/23/2015122262504Open ↗
04/02/2015122350008Open ↗
02/23/2015122262504Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
06/29/2020122350008Open ↗
06/23/2015122262504Open ↗
▸BISTR8: Energy Code Progress Inspections1
11/23/2011120814805Open ↗
▸BISTECHNICAL REPORT: ENERGY1
09/16/2011120814805Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/29/2020122350008Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/29/2020122350008Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
06/14/2010110330277Open ↗
▸Approvals, Objections & Sign-offs106
▸BISADMINISTRATIVE OBJECTIONS28
05/25/2012121089810Open ↗
05/25/2012121089507Open ↗
05/10/2012121071972Open ↗
Showing 3 of 28 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST28
06/29/2020122350008Open ↗
06/23/2015122262504Open ↗
12/04/2013121089810Open ↗
Showing 3 of 28 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE19
08/11/2010110452563Open ↗
Showing 1 of 19 on file for this type
▸BISLANDMARKS APPROVAL18
09/06/2023141024362Open ↗
05/25/2012121089507Open ↗
01/26/2011120491155Open ↗
Showing 3 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
02/07/2013121071972Open ↗
09/18/2012121089507Open ↗
Showing 2 of 7 on file for this type
▸DOB NOWLandmark Approval2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
02/21/2013121089810Open ↗
▸BISB FORM 16A (Certificate of Approval for Oil Burning Installation)1
05/13/2010110326193Open ↗
▸BISCCD1-Construction Code Determination1
09/11/2012121089507Open ↗
▸BISLANDMARKS SIGNOFF1
06/29/2020122350008Open ↗
▸Cost, Insurance & Ownership44
▸BISCOST AFFIDAVIT43
01/11/2016122350008Open ↗
06/23/2015122262504Open ↗
04/02/2015122350008Open ↗
Showing 3 of 43 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
06/29/2020122350008Open ↗
▸Filing & Intake Forms42
▸BISADDITIONAL INFORMATION20
04/07/2025141024362Open ↗
02/12/2025121254114Open ↗
10/05/2023141024362Open ↗
Showing 3 of 20 on file for this type
▸BISEFILING COVER SHEET17
04/02/2015122350008Open ↗
02/26/2015122262504Open ↗
05/25/2012121089810Open ↗
Showing 3 of 17 on file for this type
▸BISHPD-3 - SRO MD ANTI-HARASSEMENT CHECKLIST3
05/31/2012121089507Open ↗
01/26/2011120491155Open ↗
Showing 2 of 3 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/06/2023141024362Open ↗
Showing 1 of 2 on file for this type
▸Other Documents36
▸DOB NOWProof of Historic Building13
08/31/2026M00700974-I1Open ↗
Showing 1 of 13 on file for this type
▸DOB NOWProperty Ownership Certification7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWAlternate Plan 14
08/28/2026M00954661-I1Open ↗
08/27/2026M00954657-I1Open ↗
Showing 2 of 4 on file for this type
▸BISSupporting Document: Fee Exempt3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
01/24/2025121254114Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWCalculations2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 22
08/27/2026M00954425-I1Open ↗
Showing 1 of 2 on file for this type
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
02/12/2025121254114Open ↗