| Owner | Filings | Most Recent |
|---|---|---|
| Gramercy Park House | 219 | 10/08/2026 |
| 20 East 76 Co | 62 | 03/21/2026 |
| 677-679 Madison Propco | 13 | 07/08/2026 |
| 20 E 76 St Co | 13 | 03/21/2026 |
| Lyden Hotel Co | 12 | 03/21/2026 |
| 20 East 76th Street | 6 | 03/21/2026 |
| Surrey Propco | 3 | 03/21/2026 |
| 20 East 76th St LLC Dba Surrey | 2 | 03/21/2026 |
| Lyden Hotel Co D B Asurrey Hotel | 2 | 03/21/2026 |
| Dinex Group | 1 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 12/03/2020 | $150.2M | — | — → — | — not available |
| Firm | Filings | Most Recent |
|---|---|---|
| BKSK Architects | 19 | 10/07/2026 |
| Cosentini Associates | 31 | 07/21/2026 |
| G.P. Schafer Architect | 4 | 03/13/2026 |
| FL&M Engineering Design & Inspection | 2 | 03/09/2026 |
| Ospino Engineering | 3 | 02/02/2026 |
| Ashraf | 3 | 11/10/2025 |
| Tohfaz Uddin PE | 4 | 04/22/2025 |
| Patuxent Engineering | 2 | 09/10/2024 |
| Lombardo Professional Engineering | 1 | 08/09/2024 |
| Skyline Rigging | 1 | 08/02/2024 |
| Joel Phagoo P.E | 4 | 07/30/2024 |
| Scherer Design Group | 2 | 06/21/2024 |
| Robert Silman Associates | 3 | 02/12/2024 |
| Urban Integrations | 2 | 11/01/2023 |
| Crimson | 1 | 05/03/2023 |
| Surface Design | 2 | 02/27/2023 |
| HNY Consulting Engineers | 3 | 12/13/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| William Vitacco Associates | 50 | 03/21/2026 |
| AO Consulting and Drafting | 4 | 03/21/2026 |
| J Callahan Consulting | 8 | 03/21/2026 |
| Hierarch-E | 2 | 03/21/2026 |
| Construction Permit Services | 2 | 03/21/2026 |
| Lombardo Building Consultants | 1 | 03/21/2026 |
| Patuxent Engineering | 4 | 03/21/2026 |
| A1 Expediting Service | 8 | 03/21/2026 |
| KD Designs | 6 | 03/21/2026 |
| Synergy Building Consultants | 2 | 03/21/2026 |
| Rigid Structural Design | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| MJM Associates Construction | General Contractor | 30 | 04/09/2026 |
| Mmi Plumbing & Heating | Plumbing | 11 | 07/08/2026 |
| Skyline Scaffolding Group | Scaffold | 9 | 04/09/2026 |
| M&D Fire Sprinkler | Fire Protection | 7 | 07/08/2026 |
| Arsenal Scaffold | Scaffold | 7 | 04/09/2026 |
| Vik XS Services | Scaffold | 7 | 04/09/2026 |
| Urban Intelligence | Scaffold | 7 | 08/26/2026 |
| MJM Construction Associates | General Contractor | 6 | 07/08/2026 |
| F.S. Site | Fire Protection | 5 | 07/08/2026 |
| Tristrux | General Contractor | 3 | 04/09/2026 |
| Elm Suspension Systems* | Scaffold | 3 | 03/21/2026 |
| MJM Associates Construction | Scaffold | 3 | 04/09/2026 |
| F.S. Site | Plumbing | 2 | 07/08/2026 |
| Alba Services | General Contractor | 2 | 04/09/2026 |
| S. Donadic | General Contractor | 2 | 07/08/2026 |
| Exterior Wall & Building | Scaffold | 2 | 04/09/2026 |
| Universal Fire Sprinkler | Fire Protection | 1 | 07/08/2026 |
| Gilston Electrical Contng | Electrical | 1 | 03/22/2026 |
| 5 J'S Electl Conts | Electrical | 1 | 03/21/2026 |
| Power Direct Electric | Electrical | 1 | 03/22/2026 |
| Forte Express P & H | Plumbing | 1 | 07/08/2026 |
| Hudson Plumbing & MCH | Plumbing | 1 | 06/28/2026 |
| K.M.D. Mechanical 1443 | Fire Protection | 1 | 07/08/2026 |
| L.L.G. Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| 5 J'S Electl Conts | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Surface Design Profession | 3968 | 8 | 10/07/2026 |
| Domani Inspection Service | 843 | 31 | 10/07/2026 |
| Dominick R. Pilla | 1300 | 4 | 03/13/2026 |
| Tohfaz Uddin P.E | 2001 | 5 | 04/22/2025 |
| Skyline Rigging | 7880 | 1 | 08/02/2024 |
| Scherer Design Group | 7921 | 2 | 06/21/2024 |
| Special Testing & Consulting | 1688 | 2 | 03/15/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sidewalk Shed | Permit Issued | Urban Intelligence | 08/05/2026 |
| DOB NOW | General Construction | Permit Issued | MJM Construction Associates | 06/18/2026 |
| DOB NOW | Sprinklers | Permit Issued | Universal Fire Sprinkler | 06/05/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | S. Donadic | 06/03/2026 |
| DOB NOW | Plumbing | Permit Issued | Hudson Plumbing & MCH | 05/29/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Urban Intelligence | 05/15/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | Alps Contractor | 05/14/2026 |
| DOB NOW | General Construction | Permit Issued | Sapol Construction | 03/26/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | Archstone Restoration | 02/03/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Exterior Wall & Building | 12/01/2025 |
| DOB NOW | General Construction | Permit Issued | MJM Associates Construction | 11/21/2025 |
| DOB NOW | General Construction | Signed-off | MJM Associates Construction | 11/20/2025 |
| DOB NOW | Mechanical Systems | Signed-off | MJM Associates Construction | 11/20/2025 |
| DOB NOW | General Construction | Permit Issued | MJM Construction Associates | 11/13/2025 |
| DOB NOW | Mechanical Systems | Signed-off | MJM Construction Associates | 11/13/2025 |
| DOB NOW | General Construction | Signed-off | MJM Construction Associates | 11/13/2025 |
| DOB NOW | General Construction | Permit Issued | MJM Associates Construction | 11/05/2025 |
| DOB NOW | Supported Scaffold | Signed-off | Arsenal Scaffold | 11/05/2025 |
| DOB NOW | General Construction | Signed-off | MJM Associates Construction | 08/25/2025 |
| DOB NOW | Sprinklers | Signed-off | M&D Fire Sprinkler | 07/23/2025 |
| DOB NOW | Standpipe | Permit Issued | M&D Fire Sprinkler | 07/23/2025 |
| DOB NOW | Plumbing | Signed-off | Michael Itskovich | 07/22/2025 |
| DOB NOW | General Construction | Permit Issued | MJM Associates Construction | 06/05/2025 |
| DOB NOW | Sprinklers | Signed-off | M&D Fire Sprinkler | 05/05/2025 |
| DOB NOW | Standpipe | Permit Issued | M&D Fire Sprinkler | 05/05/2025 |
| DOB NOW | Supported Scaffold | Signed-off | Arsenal Scaffold | 04/30/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Arsenal Scaffold | 04/30/2025 |
| DOB NOW | General Construction | Permit Issued | MJM Associates Construction | 04/23/2025 |
| DOB NOW | Plumbing | Signed-off | Michael Itskovich | 04/03/2025 |
| DOB NOW | Sprinklers | Signed-off | Alan J. Brutosky Plumbing Con | 03/28/2025 |
| DOB NOW | Mechanical Systems | Signed-off | MJM Associates Construction | 02/06/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | Exterior Wall & Building | 12/27/2024 |
| DOB NOW | General Construction | Signed-off | MJM Associates Construction | 09/20/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | Urban Intelligence | 09/10/2024 |
| DOB NOW | Supported Scaffold | Signed-off | Elm Suspension Systems* | 08/12/2024 |
| DOB NOW | Standpipe | Permit Issued | Alan J. Brutosky Plumbing Con | 08/09/2024 |
| DOB NOW | Standpipe | Permit Issued | K.M.D. Mechanical 1443 | 08/08/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | Doria | 08/02/2024 |
| DOB NOW | Antenna | Permit Issued | Tristrux | 07/30/2024 |
| DOB NOW | Boiler Equipment | Signed-off | Michael Itskovich | 07/26/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/21/2026 | Signed-off | MJM Associates Construction | Heating and Air Conditioning Systems, Refrigeration Systems | Heat / Cool Daikin FXZQ18TAVJU 18,086 BTU · Vrf Indoor ×26 BSF6Q54TAVJ 54,000 BTU · Vrf Outdoor ×8 FXSQ18TAVJU 18,017 BTU · Vrf Indoor ×8 FXSQ24TAVJU 23,989 BTU · Vrf Indoor ×8 FXTQ36TAVJU 36,002 BTU · Vrf Indoor ×8 BS4Q54TAVJ 54,000 BTU · Vrf Outdoor ×4 BSF8Q54TAVJ 54,000 BTU · Vrf Indoor ×44 FXFQ48TVJU 48,012 BTU · Vrf Indoor ×4 FXMQ96MVJU 94,885 BTU · Vrf Indoor ×4 FXSQ36TAVJU 36,002 BTU · Vrf Indoor ×4 FXSQ48TAVJU 48,012 BTU · Vrf Indoor ×8 FXTQ12TAVJU 12,001 BTU · Vrf Indoor ×4 FXSQ 1 tons ×169 REYQ96AATJA 98,246 BTU · Vrf Outdoor ×18 REYQ144AATJA 141,775 BTU · Vrf Outdoor ×8 FXZQ05TAVJU 5,802 BTU · Vrf Indoor ×6 FXZQ12TAVJU 11,944 BTU · Vrf Indoor ×6 BSF10Q54TAVJ 54,000 BTU ×4 FXFQ24TVJU & FXAQ24PVJU 23,989 BTU · Vrf Indoor ×4 FXZQ09TAVJU 9,555 BTU · Vrf Indoor ×4 REYQ144AATJA&REYQ120AATJA 246,567 BTU · Vrf Outdoor ×4 REYQ144AATJA&REYQ144AATJA 286,839 BTU · Vrf Outdoor ×4 Aaon RNA016C 7,475 CFM · Rooftop Unit ×2 Refrigeration Daikin REYQ72AATJA 6 tons · Vrf Outdoor ×16 RXTQ/REYQ 12 tons · Refrigeration Unit ×14 REYQ120AATJA 10 tons · Vrf Outdoor ×4 REYQ96AATJA 8 tons · Vrf Outdoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/21/2026 | Permit Issued | M&D Fire Sprinkler | 5,402 heads, 55 outlets |
| 09/22/2022 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/21/2026 | Signed-off | Mmi Plumbing & Heating | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/02/2026 | Complete | Modern Voltage NYC | — |
| 05/06/2026 | Permit Issued | Warren Ostroff Electric | — |
| 12/11/2025 | Permit Issued | 5 J'S Electl Conts | — |
| 08/19/2025 | Complete | Gilston Electrical Contng | General Wiring |
| 09/10/2024 | Complete | 5 J'S Electl Conts | — |
| 01/29/2024 | Permit Issued | Ampacity Electrical | General Wiring |
| 11/13/2023 | Permit Issued | Power Direct Electric | — |
| 05/11/2023 | Permit Issued | Power Direct Electric | — |
| 04/11/2023 | Permit Issued | Gilston Electrical Contng | — |
| 03/09/2023 | Permit Issued | Ampacity Electrical | — |
| 05/03/2022 | Complete | Top Shelf Electric | — |
| 12/13/2021 | Permit Issued | Alba Electric | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/07/2026 | Permit Issued | MJM Construction Associates | Steel, Concrete, Masonry |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/09/2026 | Permit Issued | Urban Intelligence | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/02/2026 | Permit Issued | Alps Contractor | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/24/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/07/2026 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 05/13/2026 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 12/02/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 09/10/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 08/28/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 08/27/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/27/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/27/2024 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 08/20/2024 | Pass-Final SP - More than 10 Requested Floors | Pass | View ↗ |
| 08/14/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/14/2024 | Certified StandPipe-SD-Piping-Underground | Certified | View ↗ |
| 08/08/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 08/06/2024 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| 07/31/2024 | Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments) | Certified | View ↗ |
| 07/31/2024 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 06/20/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/20/2024 | Certified StandPipe - SD - Alarm Sys 64/09 - Finish | Certified | View ↗ |
| 06/20/2024 | Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments) | Certified | View ↗ |
| 05/11/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/03/2024 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 06/22/2023 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 06/12/2023 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 06/12/2023 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 06/12/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 10/06/2026 | Fire-Resistance Rated Construction | JOHN MCMONAGLE | progress |
| 10/06/2026 | Fire-Resistant Penetrations and Joints | JOHN MCMONAGLE | special |
| 10/06/2026 | Mastic and Intumescent Fire-resistant Coatings | JOHN MCMONAGLE | special |
| 10/06/2026 | Post-installed Anchors | MOLLY FORR | special |
| 10/06/2026 | Sprayed fire-resistant materials | JOHN MCMONAGLE | special |
| 10/06/2026 | Wall Panels, Curtain Walls, and Veneers | MOLLY FORR | special |
| 07/09/2026 | Standpipe Systems | JOHN MCMONAGLE | special |
| 07/09/2026 | Post-installed Anchors | JOHN MCMONAGLE | special |
| 07/09/2026 | Fire-Resistant Penetrations and Joints | JOHN MCMONAGLE | special |
| 07/09/2026 | Sprinkler Systems | JOHN MCMONAGLE | special |
| 07/01/2026 | Standpipe Systems | JOHN MCMONAGLE | special |
| 07/01/2026 | Fire-Resistant Penetrations and Joints | JOHN MCMONAGLE | special |
| 07/01/2026 | Post-installed Anchors | JOHN MCMONAGLE | special |
| 07/01/2026 | Sprinkler Systems | JOHN MCMONAGLE | special |
| 06/18/2026 | Wall Panels, Curtain Walls, and Veneers | MOLLY FORR | special |
| 06/18/2026 | Sprayed fire-resistant materials | JOHN MCMONAGLE | special |
| 06/18/2026 | Post-installed Anchors | MOLLY FORR | special |
| 06/18/2026 | Mastic and Intumescent Fire-resistant Coatings | JOHN MCMONAGLE | special |
| 06/18/2026 | Fire-Resistant Penetrations and Joints | JOHN MCMONAGLE | special |
| 06/18/2026 | Fire-Resistance Rated Construction | JOHN MCMONAGLE | progress |
| 05/13/2026 | Wall Panels, Curtain Walls, and Veneers | MOLLY FORR | special |
| 05/13/2026 | Fire-Resistant Penetrations and Joints | JOHN MCMONAGLE | special |
| 05/13/2026 | Sprayed fire-resistant materials | JOHN MCMONAGLE | special |
| 05/13/2026 | Mastic and Intumescent Fire-resistant Coatings | JOHN MCMONAGLE | special |
| 05/13/2026 | Fire-Resistance Rated Construction | JOHN MCMONAGLE | progress |